HomeMy WebLinkAboutSEP96-0205 - SEP Determinations - 9/3/1996 SEP96-0205
MASON COUNTY �)KF
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning-Landfill-Utilities
DETERMINATION OF NONSIGNIFICANCE
(WAC 197 -11-340)
Description of Proposal :
Repair existing dock by replacing rotten with new treated lumber.
Proponent : DOUG CHRISTENSEN
Location of Proposal : E 9421 STATE ROUTE 106 UNION
PARCEL#:322355100012
BROOK POINT TR 12
FROM SHELTON DRIVE NORTH ON HWY 3 TO ALMOST BELFAIR GO LEFT AT Y ON HWY
106 DRIVE WEST ABOUT 9 MILES LOOK FOR ADDRESS 9421
Lead Agency: MASON COUNTY
The Lead Agency for this proposal has determined that it does not have a
probable significant adverse impact on the environment . An Environmental
Impact Statement (EIS) is not required under RCW 43 . 21C. 030 (2) (c) . This
decision was made after review of a completed Environmental Checklist and
other information on file with the Lead Agency. This information is
available to the public upon request .
Please contact _ at ext . OC4 with any
questions .
This DNS is issued under 197-11-340 (2) , the Lead Agency will not act on
this proposal for 15 days from the date below. Comments must be
submitted by 09/18/96 .
DATE: 09/03/96
Signatu f esponsible official Date
Responsible Official : Gary Yando
Director of Community Development
426 W. Cedar,
PO BOX 578
Shelton, WA 98584
(360) 427 -9670
NON SIG, rev: 08/23/96
Coe
WDF�/CeVe, ��` /d)
S�vNI iSH 7"le i PJE C i) '�
o 9TATg
� l
89 ° RECEIVED
STATE OF WASHINGTON S EP 19 19%
DEPARTMENT OF ECOLOGY MASON CO. PLANNING DEPZ
P.O. Box 47775 • Olympia, Washington 98504-7775 • (360) 407-6300
September 17, 1996
Mr. Gary Yando
Mason County
PO Box 578
Shelton, WA 98584
Dear Mr. Yando:
Thank you for the opportunity to comment on the determination of nonsignificance for the repair
of an existing dock by replacing rotten lumber with new treated lumber(Case No. SEP96-0205),
located at East 9421 State Route 106 in Union as proposed by Doug Christensen. We reviewed
the environmental checklist and have the following comments:
Any work in or adjacent to waterways that will adversely affect water quality must receive
specific prior authorization from the Department of Ecology pursuant to WAC 173-201A-110.
A short-term water quality standards modification may be issued if the proponent agrees to a
number of specific construction practices and techniques designed to minimize water quality
impacts. The construction schedule will be tied to the schedule on the Hydraulic Project
Approval (HPA).
Proper disposal of construction debris must be on land in such a manner that debris cannot enter
Hood Canal or cause water quality degradation of state waters.
If you have any questions, please call Ms. Jeannette Barreca with Ecology's Water Quality
Program at(360) 407-6556.
Sincerely,
Cile, (lale
Assistant to the Regional Director
(360) 407-6309
CG:alw(96-6084)
cc: Abbe White, SWRO
Jeannette Barreca, SWRO
Z-d �d dw AI I N i WA dwtS
cad � S 37
GRAZA 31r0 C :0 t=mod n mnyy' y*S lf.Zt
d!1•�""S' =1�8 —a v =SS3}M 9tt1i1bt M3 WIVE,
i91190 m MIUS om:--o Imm p►-VU_rW_" I - rfra maw`x�s s zcze
a na t�:xw -.�wa teu =ss�i�oa+r wr �j;2w.,w W
►usam„rA am W mo= UVIEW DEMM
NOUM') A3N lY 6161 19 1010 'T0-3 =xuvo
fSId A3N /A tSId JNIISD(3
MY Id d OW 3A0W3H =Q3SOd0t3d 39V8= IVUS WOW 3QI14 W 1d
% 3 mS co m 56 fm Sm HS 3�VOS ON ddW Ai I N I3 I A
6� S JD A 25 0o rux SS 90 ZL It I d M-n' m- wxnsH! mm )7mamsoomm a
41 SM O N Hl li OS 3 AS 00 Of
m so 91 N elm KI, SUL M Id a: NOIONIHSVA
3 MS 00 KM ES GM 9t it Hd .W ST*t ONVISI 6�� 3NV-j
ins ow Am9m3St®tid
= 3XNM
ODIf 3iDtm-11nd -mmm 9-L an
®8 M3Hl9 :0
NtsaLnswrxmmunof -
AME00 ?MSSaUiQnaX
3as00xvESSa919HLUL
39 :10 A 1-4 95'16t � � — 31S
Wf 30wW-lna XM-9 9-� tsMs+ N
NOI1dI DS30 IV53-1 .. •*�.>t'zzt=r�o� m
,ri.SE o[t =1Y1
-tea 3i1 W49 SM MNIM ON 3f1A31138 NI N m
39 U OSM 0= AML= '1LLt td
:0 30IS RM to CBL=3e OL Md
OOt as a9 os w 0
AMA NVId �
mad
r------=------� . Op
J HUII0011 vw
.9 -Ott
,0 -M
03d0'1S 036tldMW -,OE
m
• �. 19id tt�alrno a
IV gin
&am camcm
Q1r3�t79 dD�s` � t13
i
APPENDIX A:
GUIDANCE CHECKLIST FOR COMPLETION OF DRAWINGS
General Information. Three types of illustrations are needed to properly depict the proposed activity: Vicinity Map, Plan View,
and Cross-Sectio View. Drawings to scale should be prepared using clear printing,black ink, and the fewest number of sheets
possible. Include a scale. The importance of clear accurate drawings cannot be overstated. At a minimum, drawings must
contain the follow' information; other information may be required depending on project type. If you have questions regarding
completing the dra gs, call the appropriate agency.
1. Vicinity Map. A y of a county or city road map, or a U.S. Geological Survey topographic map may be used. Include-
( ) a. North w.
() b. Name o aterbody (and river mile if appropriate).
( ) C. Location o the proposed activity(indicate with a circle, arrow, X, or similar symbol).
( ) d. Provide lati de and longitude of the site to the nearest second.
( ) e. Provide direr ns to the site.
2. Plan View. This drawing ill the proposed project area as if you were looking down at the site from overhead.
O a. North arrow.
(-) b. Name of waterbody direction of water flow.
() C. Location of existing sho line.
Tidal Waters: Show the High, the Mean High, the Mean Higher High and Mean Lower Low Water
Mark or Line, and/or we boundaries. Indicate elevation above datum.
Non-tidal waters: Show the High Water Mark or Line, and/or wetland boundary.
() d. Dimensions of the activity or cture, distance from property lines, and the distance it extends into the
waterbody beyond the Aesi , Mean High, the Mean Higher High and Mean Low Water Mark or Line,
and/or wetland bounda rime.
( ) e. For Corps permits, indicate the dis to Federal projects and/or navigation channels (if applicable). To
ascertain, call the Corps Regulatory B ch Office at (206)764-3495.
( ) f. Show existing structures on subject and joining properties.
( ) g. Indicate adjoining property ownership.
( ) h. If fill material is to be placed, identify the of material, amount of material (cubic yards), and area to be
filled (acres).
( ) i. If project involves dredging, identify the type material, amount of material (cubic yards), area to be dredged,
method of dredging, and location of disposal site. Dredging in area shallower than -10 feet needs to be
clearly identified on drawings.
( ) j. Identify any part of the activity that has been compl
( ) k. Indicate types and location of aquatic, wetland, and ri vegetation.
() 1. Erosion control measures, stormwater runoff control, ilization of disturbed arras, etc.
3. Cross-Sectional View. This drawing illustrates the proposed activity as i 't were cut from the side and/or front. Include:
( ) a. Location of water lines.
Tidal Waters: Show the Ordinary High, Mean High, the Mean 'gher High and Mean Lower Low Water
Marks or Lines, and/or wetland boundary.
Non-tidal waters: Show the Ordinary High Water Mark or Line, or wetland boundary.
() b. Water depth or tidal elevation at waterward face of project.
() C. Dimensions of the activity or structure, and-1he distance it extends into a waterbody beyond the Ordinary
High, the Mean High, the Mean Higher High and Mean Low Water or Line, and/or wetland boundaries.
() d. Indicate dredge and/or fill grades as appropriate.
() e. Indicate existing and proposed contours and elevations.
() f. Indicate types and location of aquatic, wetland,and riparian vegetation presen n site.
( ) g. Indicate type and location of material used in construction and method of cons lion.
() h. Indicate height of structure.
Appendix A-1
WNfkp
iso' I
I �C, c�rrnq i
c40"-15edion
r P i
,
f
r �dcr r/Ct
� � t g�iratrrq Ndu►d '
La�
IZ Fkrnoc tL o J i
.�
I
j r
I
i 1��51DfIV�f i
PLM VIEW
Nd�urd D��
rtdd rkdonN roc \\
c(Wdcwffd Fox
(HUM-ODFfJ
LZ
6rdLed Deach
i
DDes�dy Dmc Rea - -Pn�dcrt�e fadori�
Ddca�+ar 6 c DWanw F,omWda+ro►d Fa= L T)c I.ocdbn of 011N t Ht tt W on Dcwk
To roc of Ndurd Oa*ine p C4WhV Da i Piofcdton
G1PO55 S�Tii�N N?9LLW-OD FL)
IN Alto= r..r
COUNTY OF
THIS IS AN EXAMPLE OF THE INFORMATION REOUIRFD APPLICATM BY
PROJECT ADDRESS:
PROVIDE DIMENSIONS.DETAILS t SPECIFICATHM
AS APPROPRIATE FOR PROPOSED PROJECT.
SHEET OF DATE
4'
/—DulMed a Da�lbr � j
rb plod i
R RIn
3
� f>a� �� uw• rt1
PL�IiV V"
Prwithe The rdo.b�
On He Deack Pot or Era *
D.f rfakdtas CHLLW
OD rij pill IER Pw^r
Z ThrTppe d riddton .
C� Tdd
J. rO=Wi a Cf AC rind That j
wrO�w,r��
Peach Am C/bare Cde,e LmWder)
4. T 1rTp�e and Lm�ion
Ibudtc ad/arwdlmd VepdaftorL
5. N4ffl er od Type or Pdl.;,
COUNTY OF
THM IS AN EXAMPLE OF.YK DI =WTRW RE011dtEa APPLICATION BY
PROVOE ----7f$NXM DETAKS t SPEt'MATUM FRO.IEC'T ADDRESS:
AS APPROPUM FOR PROPOSED PROJECT.
SHEET OF DATE
� 9
1
l
l
32'- 0' \N, 1 \
/ ir- o• � 1
�— r x,Ir SLOF'�i
LMOtT PLATPJIM
o �
Z
:sr 1
I
IrETC
s 1
el- a'
3•- W
- t
79'- 2 1/2'
i
PIER PLJ►Al
1
0 5 to 1
1
P��B�LOGATED ON SMO SME OF
PROPERTY. EXISTDC VD0D BUJOEAD TO SE
FBOVEO AM tiER.ACM WOM SEPARATE PSKT.
� I
VH33t SEPARATE P84MIT
77- 2' +/-
LIIE OF G.K.Y. AT
NIT''
BOTTOM
ELEVATION VIEW PRU KM:REMOVE AND REDUCE
o to 1 EXISTING PIER W/ NEW PIED
AT NEW LOCATION
AT.MEFM MAD
COIMY CF:I M STATE:VASHM7M
PAeE• oA : ��
l�-i
• b/M �iC.t�1�1o� ?lOJ��iI�,
Is
goo
Y
� o
o
3
�. i • ov `��► • i��`
Y r
s a,
` / • iY� o
�.
�Hc♦` 1 �` •jcix3