HomeMy WebLinkAboutShoreline Pre Inspection - PLN General - 9/13/1993 Q�fiR�50�- bRvw,J *5c��s A«3
GARY YANDO,DIRECTOR
y0N.STq 7. O
P 'c
o A DEPARTMENT OF COMMUNITY DEVELOPMENT
u
o T z PLANNING -SOLID WASTE-UTILITIES
2� N Y y BLDG. III • 426 W. CEDAR • P.O. BOX 578
of o 1864 SHELTON,WA 98584 • (206) 427-9670
September 13, 1993
Mary Ann White
P.O. Box 729
Shelton, WA 98584
RE: Shoreline Pre-inspection. Robert Hall property, PN# 322355000011. Hood Canal.
Dear Ms. White:
A shoreline pre-inspection of the subject property was conducted on September 7, 1993. The
sideyard setback for these lots is 5 feet as measured from the property line to the drip edge of
the structure. Shoreyard setbacks would be determined based on the residential shoreline setback
criteria as listed in the Mason County Shoreline Master Program, Chapter 7.16.080. Any
addition to the existing home would need to comply with the setback criteria. Bear in mind
structures cannot be located on property lines, thus a Boundary Line Adjustment may be
necessary. The septic system would need to be brought up to current code should Mr. Hall want
to add on. Chances are that new development on the undeveloped lots would have to locate
drain fields landward of Nortshore Road.
Pre-inspection reports remain valid only until development changes occur in the vicinity which
would affect the evaluated in the inspection.
Respectfully,
J. M assee, Planner
De rtment of Community Development
Recycled