HomeMy WebLinkAboutEnvironmental Permit - PLN General - 3/21/2003 ENVIRONMENTAL PERMIT \ 5. Identify current use of property with existing improvements: Alderbrook Inn has been an existing resort since 1913. The fundamenta&al of the project is to enhance and reposition Alderbrook Inn,to make it more successful, to enhance the environment, and to contribute to community in which it is located. North Forty owns two parcels of land in this location; one is the 17.43 acre parcel on which the existing Alderbrook Inn sits and where the redevelopment will occur, and approximately 86 acres of undeveloped land contiguous to this site, on which no future development is anticipated. Alderbrook Inn is an existing 101-room resort located on SR 106, 1.5 miles east of Union, in Mason County, Washington(refer to drawing AO.1A). The Main Campus (Exhibit G-1), located on the north side of SR106, fronts the Hood Canal with a marina, and is approximately 2.6 acres (not including tidelands). It is comprised of the Plaza building(to be extensively renovated inside and out), the Lanai building(to be demolished and replaced with a New Wing of guest rooms), the Conference center(to be demolished), Eastwood building(to be renovated into a Spa), and the Pool (to have minor repairs). The Marina, a T-configuration dock,will undergo routine maintenance and repair. To the west of the Main Campus is a grouping of 21 cottages (partial exterior and interior renovations) located on approximately 1.8 acres (not including tidelands). Opposite the Main Campus and the cottages, on the south side of SR 106, are approximately 6.9 acres housing surface parking lots, the Brookside building(receiving interior renovations to become the Inn's administration center),Alderbrook's sewage treatment plant(remaining as is) and undeveloped lands. Located about 307 feet west of the aforementioned property, also on the south side of the highway, is a .77-acre lot,which houses an old barn structure. Page 2 6. Identify and describe the proposed project, including the type of materials to be used, construction methods, principal dimensions and other pertinent information (Attach additional sheets if needed): Proposed Project There are five major components of the proposed redevelopment of Alderbrook Inn: 1) Remodel and reconstruction of the Alderbrook campus buildings, including: Extensive interior and exterior renovation of the Plaza building, construction of a new Lobby, construction of a New Wing of guest rooms(including a ballroom), renovation of the Eastwood building(into a Spa), construction of a new Fitness room,repair of the existing Pool building, minor exterior and interior renovations of the Cottages, and interior renovations to the Brookside building. A new maintenance building will be constructed on the south side of the newly realigned SR106. The existing Treatment Plant will serve all of the Alderbrook buildings as well as the properties of the Raikes and the McConkeys. All new construction closely follows the footprints of the existing buildings (refer to drawing A0.4). The resultant project will have 98 guest suites, a restaurant and bar, a spa,pool and fitness area, and a number of meeting rooms. 2) Reconfigured Parking &Drives Drives and parking will be modified to provide safer access for guests between the parking areas and the Inn, to move traffic off the SR106, and to provide a new fire lane on-site. Reconfigured parking lots will be located on,or near, existing parking and roadways to minimize the impact of additional landscaping. Currently there are 128 parking stalls (including 2 barrier-free). The future development will provide 167 parking stalls, of which 6 will be ADA and 16 will be of pervious material. 3) Relocation of the SR106 One major aspect of the redevelopment is to realign SR 106. The realignment of SR106 will pass roughly parallel and 200-feet south of the old section. This relocation will have the following benefits: it will improve the habitats of both Alderbrook and Dalby streams, it will move the highway further away from Hood Canal and the shoreline, it will provide a safer highway with improved sight-lines and reduced access points (Alderbrook Resort currently has 35 access points), and it will greatly improve the safety of guests at Alderbrook Resort. Under existing conditions,the majority of resort parking lies to the south of SR 106. To access the main campus guests must cross SR106 creating vehicle/pedestrian conflicts. The proposed realignment will provide for all guest parking north of SR106 and eliminate current vehicle/pedestrian conflicts for Alderbrook Inn guests. The shift also allows for the enhancement of the creek between the newly aligned SR106 and the Hood Canal. This realignment will require clearing of approximately 6.9 acres of land, including 2.3 acres of second growth forest and a hillside cut of approximately 130,000 cubic yards of soil in slopes greater than 15%and will impact 0.48 acres of low value wetlands and .01 Page 3 acres of type 5 streams. The primary hydrologic functions of the wetlands impacted by the realignment will be preserved on-site. The terrace adjacent to the highway south of the main parking area will be planted with native species trees and shrubs(refer to Landscape drawings)to merge naturally with upslope second growth forest. The hillside slope and roadside ditches will be landscaped with erosion controlling grasses. In addition,the abandoned right-of-way(where not used for driveways or parking),will be landscaped with vegetation native to the region and/or drought tolerant species. The construction of the SR106 realignment will require the removal of approximately 130,000 cubic yards of soil in the slope cut south of the resort and east of the treatment plant. This soil removal will result in the unavoidable impact of approximately 12 dump truck round trips per hour, for a period of two months during the excavation stage of the highway construction. To mitigate the potential impacts of truck and passenger car conflicts at the excavation flaggers will be stationed at the site to direct traffic during the excavation phase. Truck wheels will be run through a wheel wash area to remove dirt prior to entering the existing road system. All Washington State Department of Fish and Wildlife (WDFW)Hydraulic Project Approval (HPA) construction and traffic control guidelines and other State and County construction traffic control guidelines will be strictly adhered to. 4) Restoration of Alderbrook Creek Alderbrook Creek has recently been retyped as a Type 3 stream. An extensive stream rehabilitation project will restore the lower section of Alderbrook Creek(the lower 200' between the realigned SR106 and Hood Canal) from riffle habitat to one replicating the historic natural,undisturbed riparian characteristics of a pool habitat allowing spawning upstream. An existing section of Alderbrook Creek will be modified into a community watershed habitat viewing area with a juvenile salmon rearing pond. A new channel will be created within this area to maintain a spawning zone for returning salmon. 5) Restoration of Dalby Creek Dalby Creek is a Type 3 stream with no salmon present above SR 106. The proposed new crossing for the SR 106 realignment will occur roughly 200 feet above the current SR 106 crossing. Impacts to aquatic habitat will be minimized by the installation of a 12-foot bottomless arch aluminum culvert. The current crossing of SR 106,which represents a barrier to fish passage,will be removed and replaced with a 12-foot wide 20-foot long prefabricated bridge. This will open up over 3000 feet of productive upstream fish habitat to salmon. Large woody debris(LWD)will be placed in the stream to improve in stream structural habitat and increase the pool to riffle ratio. The overall impact from construction to this stream system will be minimal given the scope of the streambed restoration. Page 4 SR106 Realignment The design team,working with the WDOT, investigated several design alternatives for the realignment of SR 106. The final design is based on the best fit of horizontal and vertical curvature design criteria, access points and sight line design criteria, intersection alignment, and storm water runoff treatment. These design criteria combined with an alignment that was acceptable to all the property owners along the right of way culminated in the SR106 realignment chosen for the final design. The final design will include easements for all utilities,which will include the construction of underground electrical, telephone, and cable television along the right of way. Pedestrian and bicycle access will be designed to meet WSDOT standards. The proposed realignment of SR 106 has been designed to current WSDOT standards for a secondary arterial with design speed of 40 miles per hour. The joint access road at the west end of the realignment was located minimize access point, maximize sight distances and to minimize construction in the stream buffer. The SR106 realignment and the joint access road at the west end of the realignment meet Mason County Department of Public Works and Fire Marshall standards. The proposed roadway will be able to accommodate the traffic volumes projected for the year 2022 with virtually no change in delay per vehicle at the study intersections (The Shea Group, January 2003). The reconstruction of SR 106 and the study intersection will also incorporate current design standards to improve as much as possible the intersection skew angles,horizontal and vertical sight distances and overall safety in the project area. A primary benefit of the proposed realignment will be the elimination of current vehicle/pedestrian conflicts for Alderbrook Lodge guests utilizing the lodge parking east of SR 106. All Washington State Department of Fish and Wildlife (WDFW)Hydraulic Project Approval (HPA) construction and traffic control guidelines and other State and County construction traffic control guidelines will be strictly adhered to. The environmental issues associated with the realignment of SR 106 have been addressed in the SEPA checklist. Construction Methods The design will add pitched roof forms to the existing main hotel building in concert with the new exterior facades. The roof forms help to break down the scale and massing of the large,boxy building, while giving additional character,detail and interest. The new guest wing will also have pitched roofs,helping to provide a cohesive design vocabulary to Alderbrook, which is presently lacking. The new guest wing and the existing main hotel building that is being renovated are being designed together with similar detailing and materials to further the cohesiveness of the campus. The cottages will receive some new materials and coloring that will further reinforce the aesthetic of a consistent, connected resort campus. The existing main hotel building will be the tallest building in the project. It is presently 38 feet tall at its highest point, using Mason County's measuring methods. A series of new pitched roofs are proposed to be added atop the building to give scale,hierarchy and Page 5 interest to the building and to augment the existing flat roof with a better drainage system. The resultant peak of those roofs in the most extreme location will be 45 feet. Note: there is no habitable space being added within that space. The new guest wing is modulated as three connected portions, each at different angles in plan and of varying building height, forming a more interesting composition while reducing its scale. To respect the neighboring residential property to the east,the new construction is setback from the property line beyond code requirements. In addition, this portion of the building is one storey.lower than the remainder of the wing. The resultant new design is far less obtrusive than the existing condition,which is a two-story building,paralleling the property line approximately five feet away from the neighbor's property. The existing buildings are generally bland, monotone gray-colored structures with flat roofs. The handrails at the main guest facilities even have chain link fencing incorporated into them. The overall character of the resort will feature high-quality materials in warm colors that will blend in with Alderbrook's natural surroundings and detailing that will evoke a Northwest lodge/beach house theme and spirit. New structures will primarily consist of wood shakes and batten/board siding with contrasting window frames. Some stone is planned to be used at the base of some of the structures, including terrace and landscape walls. Landscape on Site The project site is complicated, and the plant material will be selected for each of the following areas: Inn, Parking, and Courtyard The Water's Edge The Stream The Cottages The State Route 106 right-of-way and south slope. Large Douglas Firs and Western Red Cedars characterize the existing site. Where possible these trees will remain and become focal points in the landscape. Other native species present on the site include Evergreen Huckleberry, Salal, Sword Fern, and Vine Maple. A Pacific Northwest theme has been utilized in the site and landscape concept. Most of the proposed plants are native to the region and/or drought tolerant species. A few ornamentals are proposed in areas of special interest such as the entrance and courtyard. Other landscape material includes logs and stone salvaged on site. Stream Crossings There will be two stream crossings at Dalby Creek. A bottomless culvert will be used for the SR 106 relaignment crossing, and a prefabricated concrete bridge will be used at the location of the existing SR106 for entry to the Dalby's properties (in lieu of the existing culvert with bottom). There will be two stream crossings of Alderbrook Creek. A bottomless culvert will be used for the SR 106 realignment crossing, and a prefabricated concrete bridge within the Alderbrook property(where there is an existing culvert with a bottom). The two Type 5 streams will run under the newly aligned SR 106 in concrete culverts. Page 6 Environmentally Sensitive Areas There are four aspects of the project that would be classified as environmentally sensitive. They are: 1. Steep slopes—the steepest slopes on the site are not impacted by any development. Some slopes over 15%will be encountered with the realignment of SR106. Steep slopes will be managed during construction, as outlined in the Habitat Management Plan. 2. Shoreline buffer—the existing Alderbrook Inn is built within the Shoreline buffer(the project predates buffer regulations). There are eight changes to Alderbrook within the Shoreline: 1. Cottage 101 will have a second story added. 2. Cottage 103 is being decreased in size to accommodate a new fire lane. 3. A new fire lane is replacing an existing path at the cottages, constructed of 'grasscrete'where it parallels the shoreline. 4. The Plaza building will have exterior upgrading and interior renovations—the footprint does not change. 5. A new fitness area is being constructed between the existing Pool and Eastwood buildings, adding 8.1%to the building footprint 6. The existing Lanai buildings and the Conference Wing will be demolished. The proposed New Wing moves the building almost entirely out of the Shoreline buffer. 7. New utilities for the Inn are illustrated on Exhibits U2,D-2 and D-3. 8. The landscaping will be upgraded. 3. Stream buffers—The streams are either impacted by the SR 106 realignment, or by the construction at Alderbrook. The highway relocation impacts the buffers of Alderbrook Creek and Dalby Creek, two Type 5 intermittent streams, and Big Bend Creek. The construction at Alderbrook affects only the buffer of Alderbrook Creek. The following chart illustrates that 34,865 sq.ft. of construction currently exists in the Stream buffer(Note: The resort was constructed prior to buffer regulations). The proposed project will increase that by a total area by 1,528 sq.ft. The changes include: 1. A reduction in the size of Cottage 103. 2. The addition of the garbage/recycling area to the Plaza building(moving the existing structure further away from the stream), and 3. The construction of the new Lobby on the east side of the existing Plaza building. 4. Wetlands- Two minor wetlands are impacted by the realignment of SR106. Page 7 Table 1: Existing and Future Building._Footprints within Shoreline and Stream Buffers Structure Names/Type Footprint Sq. Ft. Footprint Sq. Ft. Footprint Sq. Ft. On Site In Shoreline Buffer In Stream Buffer Existing Buildings Plaza 15,961 1,491 15,961 Plaza Port Cochere 1,133 0 1,133 Lanai#1 2,666 0 1,214 Lanai#2 2,656 0 0 Eastwood &Pool 10,685 5,671 0 Cottages 14,298 5,154 9,050 Brookside 2,878 0 2,878 Maintenance 2,310 0 0 Covered Walks 7,554 87 3,074 Sewer Treatment 1,555 0 1,555 TOTAL: 61,696 12,403 34,865 Proposed Project Plaza 15,961 1,491 15,961 New Wing 16,639 0 6,122 New Wing Port Cochere 856 0 827 Sewer Treatment 1,555 0 1,555 Eastwood & Pool 9,169 6,486 0 Cottages 14,194 4,983 9,050 Brookside 2,878 0 2,878 Maintenance 1,440 0 0 Covered Walks 409 151 0 TOTAL: 63,101 +2.2% 131111 +5.7% 36,393 +4.4% Miti ag tion As mitigation for the impact of the clearing of the 2.3 acres of second growth forest and impacts to the wetlands, North Forty Lodging proposes to set aside 30 acres of second growth habitat in a permanent land conservation easement that is structurally more diverse than the forest being removed. In the long term,this land conservation easement will provide significantly better functional habitat for eagles &marble murrelets compared to the existing trees and habitat that will be removed for the new road construction. Steep Slopes Approximately seven acres of land will be cleared for the proposed site and realignment of SR 106. All of the new cleared property will be subject to erosion during construction. Best Management Practices for erosion control as prescribed by the Mason County Department of Public Works and the geotechnical engineer will be used to control erosion. An Erosion Control Plan will be prepared for approval as part of the construction document permit application package for the project. . Page 8 HPA guidelines will be strictly adhered as to timing of the construction and construction guidelines. WDFW biologists will be notified at the outset of construction. There is no history or indication of unstable soils on the site. Request to Decrease Buffer The construction of the new Lobby exceeds the area provision of"same footprint plus or minus 10%"as outlined in Fish and Wildlife Chapter 17.01.110.F.1. The footprint of the existing Plaza building is 15,961 sq.ft. and the footprint of the new construction (predominantly the new Lobby)within the Stream Buffer is 3,027 sq.ft. This represents an area increase of 19.2%. We request a Provision for Decreasing Buffer, as outlined in Fish and Wildlife Chapter 17.0 1.11 O.D3. Despite the fact that the new Lobby exceeds the 10%allowance,the overall project provides a much improved Creek over the existing condition. First, the new Lobby is separated from Alderbrook Creek by the existing Plaza building. It will be constructed over an area that is currently an access road into the courtyard of the complex. The existing access roads and covered walks will be removed, and new landscaping installed. All new construction(both the buildings and the paving) is further from the creek than existing conditions. The majority of the new construction in the stream buffer is either removed and landscaped, or placed over existing developed areas. The existing garbage and generator, for example,will be removed and relocated further from the Creek. The paving/parking area in the buffer will be decreased from 79,902 sq.ft. to 64,734 sq.ft. (refer to drawing A0.6) Extensive restoration of Alderbrook Creek is planned that includes the placement of log and rock weirs to create pool and riffle habitat; the creation of an off channel Coho rearing pond; and the construction of salmon viewing pools were guests will be able to view spawning salmon and read interpretive signs about salmon life history and Puget Sound stewardship. Views in the immediate vicinity would not be altered or obstructed by the project. The adjacent owners to the east and west have no view impacts. The adjacent landowner to the south will not have the view impacted any more than existing by the increase in roof height by 5', due to the elevation of the property over Alderbrook. The upland property to the south is owned by North Forty Lodging and is planned to remain undeveloped Overall, this project proposes a net increase in functional buffer of Alderbrook Creek. t "lf 3' s • PERMIT NO.: �xf DATE RECEIVED: MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT INTERIM RESOURCE ORDINANCE(Chapter 17.01 MCC) 411 N.5T•H Street/P.O.Box 578,Shelton,Wa 98584 ENVIRONMENTAL PERMIT APPLICATION MASON ENVIRONMENTAL PERMIT ® CONDITIONAL USE ❑ VARIANCE ❑ FEE- :f1to.00 FEE ---570,co FEE-$(ooD.00 The purpose of the Interim Resource Ordinance Is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 38.3;,36.70A,39.34,58.17,76.09,84,33,84.34 and 90.58 RCW. PLEASE PRINT FEE:$110.00 1. Owner:_North Forty Lodging Lodizing LLC Owner Mailing Address:_same Site Address: 22526 SE 64th Place City; State: Zip: City: Issas a� h State: d�A_Z1p; 8027 Uen/Tftie Holder: none Phone:(42,,) 369-929Q Fire District# Address: SIGNATURE: City' State: Zip; 2. Parcel Number:32233 50 _ 00013 Legal description: see attached Parcel Size: 17.43 acres 3. Directions to Site:' Union. WA. Ea t along SR 106 at Beach Drive intersection 4. State what sections required a permit: Long-Term Commercial Forest,Chapter 17.10.060; Inhoding Lands,Chapter 17.01.062; Mineral Resource Lands,Chapter 17.01.066; x Wetiands,17.01.070; Critical Aquifer Recharge, Chapter 17.01.090;__Aquatic Management Areas,Chapter 17,01.110; Frequently Flooded Areas, Chapter 17.01.090; Landslide Hazard Areas,17.01.100; Seismic Hazard Areas,Chapter 17.01.102; Erosion Hazard Areas,17.01.104. 5. Identify current use of property with existing Improvements: , The current use of the property is a resort with related amenities. The majority of th_ e rpanrr narking 1 th of SR 1nr• There are 8l existine g. u r rooms 6. Identify and describe the proposed project,Including the type of materials to be used,construction methods, principal dimensions,and other pertinent Information(Attach additional sheets If needed): Reuoya1-i an an1 nxn^ inn of rl dl along with mndi fi�at� / g in4 Tnn_ rPalignmrnt of cn ins �nai nn of tha 1 a i and restoration of tie A Yam--ate narking. ]ors water draina e ma.tA r rh construction will connPrt tha �� -� ranAI Np rann•atP 1 F ri f i r 1 a l P character. " r } ir 1 7. Any water on or adjacent to property:Saltwater X Lake River Pond Seasonal Runoff Other creek Wetland X a• Will there be an alteration of a wetland and/or wetland vegetation area? Yes X No 9. If septic is located on project site,Incfude records. Connect to septic? Community Septic? X Public Water Supply? Well? 10. Type of Job: New Add X Alt X Repair Demolltion Other This permit is granted pursuant to the Interim Resource Ordinance(Chapter 17.01 MCC)and nothing In this permit shall excuse the applicant from compliance with any other federal,state,or local statutes,ordinances,or regulations applicable to this project,but not inconsistent with the Interim Resource Ordinance, The permit maybe rescinded pursuant to the event the permittee falls to comply with the conditions of this ordinance. Show the following on the sitaolan Lot Dimensions Flood Zones Existing Structures Fences Stucture Setbacks Driveways — ,�� Water Lines Shorelines Drainage Plans Topography Septic System Wells Indicate Dlrectlonal by(N,S,E,W,etc.) Proposed Improvements Easements Name of Flanking Street In relation to plot plan �x�\ \ \\ wr•� aaus El I I I / � I 7- i i \\� Ob9NA ux.rrw.x I \ \\\\\ \ \ E