Loading...
HomeMy WebLinkAboutBLD2004-01494 Cancelled Addition - BLD Permit / Conditions - 10/7/2004 Inspection Line(360)127-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 1,86 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2004-01494 OWNER: DANIEL ORCHARD RECEIVED: 9/15/2004 CONTRACTOR: JESFIELD CONSTRUCTION CO. INC. 360-275-6684--731-7703 LICENSE: JESFII*228D0 ISSUED: 10/7/2004 SITE ADDRESS: 140 E NORTH BAY RD BELFAIR EXPIRES: 1/7/2006 PARCEL NUMBER: 122205017001 LEGAL DESCRIPTION: ALLYN PCL 1 OF BLA#92-103 PTN BILKS 14-15 EX PROJECT DESCRIPTION: DIRECTIONS TO SITE: 2ND STORY ADDITION DIRECTLY ACROSS FROM ORNAMENTAL STONE COMPANY ON NORTH BAY RD. APPRX 200 YARDS FROM HWY 3 AND NO BAY RD HEADING NORTH AT INTERSECTION General Information Construction &Occupancy'Information Square Footage Information No.of Bedrooms: 1 Typd Constr.: V-B Type of Use: SF Insp.Area: OT No. of Bathrooms: 1 f-04. Group: R-3 Lot Size: Deck: 100 Type of Work: ADD Fire Dist.: 5 No.of Stories: 2 -"LE(cc. Load: Building:780 Valuation: Building Height: 22 C-9-c. Status: Primary Basement: Manufactured Home Information Setback Infitrmation Shoreline& Planning Information Make: Length: Ft. Front: W 151.0 Ft. Shoreline: Ft. Water Body: NONE Rear: E 30.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Side 1: N 69.0 Ft. Shoreline Desig.: Urban Year: Serial No.: Side 2: S 43.0 Ft. Comp. Plan Desig.: Urban Growth Area Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Lavatories 1 Ventilation Fan 3 Plan Check Fee NJP 9/15/2004 $436.64 S22004000 Showers 1 Planning Review Fee NJP 9/15/2004 $155.00 S22004000 Water Closets (Toilets) 1 EH Plan Review CEW 9/20/2004 $75.00 B12004000 Water Heaters 1 Building State Fee RLS 9/28/2004 $4.50 B12004000 Bath Tubs 1 Building Permit Fee RLS 9/28/2004 $671.75 B12004000 Mechanical Base Fee RLS 9/28/2004 $23.50 B12004000 Mechanical Fee RLS 9/28/2004 $21.75 612004000 Plumbing Base Fee RLS 9/28/2004 $20.00 B12004000 Plumbing Fee RLS 9/28/2004 $35.00 612004000 Additional Plan Check Fee KS 12/13/200 $58.00 S12004000 Final Expired Permit KS 1/16/2008 $64.00 S12008000 Total $1,565.14 BLD2004-01494 Please referto the following pages for conditions of this permit. 1 of 4 ., CASE NOTES FOR BLD2004-01494 CONDITIONS FOR B LD2004-01494 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) The internatioanl code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 3) Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering shoreline waters. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand, silt, and soil will damage aquatic habitat and are considered pollutants. Any discharge of sediment-laden runoff or other pollutapollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology pursuant to WAC 173-201 A-1 10. A short-term water quality standards modification may be issued if the proponent agrees to a number of specific construction practices and techniques designed to minimize water quality impacts. All areas disturbed or newly created by construction activities must be revegetated using bioengineering techniques, clean durable riprap, or some other equivalent type of protection against erosion when other measures are not practical. X 4) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X 5) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. X 6) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X BLD2004-01494 Please referto the following pages for conditions of this permit. 2 of 4 7) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads,"all new structures that ' require an address shall have approved numbers or addresse's located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections. X 8) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. X 9) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 10) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved"site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X 11) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X 12) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X 13) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X 14) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X 15) All property lines shall be clearly identified at the time of foundation inspection. X BLD2004-01494 Please referto the following pages for conditions of this permit. 3 of 4 16) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X 17) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X 18) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 19) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.Proof of continuation of work is by means of a progress inspection.The owneror the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWNER OR AGENT: DATE: BLD2004-01494 Please refer to the following pages for conditions of this permit. 4 of 4 o CONCRETE MECHANICAL MANUFACTURED HOME o _-- �_ Footings I Setbacks Date Ribbons = Gas Piping o Interior Date By Inlerior-Date By Date By > Exterior Date By Exterior-Date By Set-up Point Load I Isolated Footings INSULATION hate Bt 0 BG I SLAB INSULATION ------ D Date By Data By FIRE DEPARTMENT Z Foundation Walls Floors Date By r Date By Data By DECKS FRAMING Walls Date By Date By Data By PROPANE TANKS PLUMBING vault Date 8v Date By OTHER Groundwork Attic Date By Type- Date By Date E?y D.W.V EIRMALL Type: Int Bruce Wall Date Date By _. _ _.. _ _______� -0 oats ®� FINAL INSPECTION Water Line Fire Separation No Date By Date By Dato fay p m � Pass or Request Inspect. Type of Insp. Fail Date Date Done By Comments s 0 8 2. 0 in in 0 CD m 0 iCD kNCRETE MECH NWAL MANUFACTURED HOME 0 " Footings / Setbacks Date 3� B y Ribbons 0 Date By / Gas Piping Date By Foundation Walls Date B y Set-up Date By INSULATION Date By B G / Slab Insulation Floors Final Date By Date B y Date B y FRAMI G PW-- Walls FIRE DEPT Date 3p KE By Date By i'1 Date By PLUMBING Attic / OTHER Groundwork Date W By Date By WALLBOARD NAILING D.W.V. Date By Date 30 M By�GS FINAL INSPECTION 92 EDa ter Lie Date By v e3CQ� By Date By CD 0 CD CD 02- At O 0 [�«4�� Gt/G /���//�lr/ s�C ilia L�/3 G✓ o/� c�cG%�,�� 7-c;2 C-e ffi!f ,D/f'v ���� i Aso_ r,�- rvo j `D r 0 Permit # �f a�4Ry MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location IgojqxfffM6-r- Ma W This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items Listed below must be corrected to gain code compliance cv You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK D( Call for re-inspection when corrections are made before continuing ❑ Make corrections, items will be checked on next inspection ❑ OK to ❑ This is not a complete inspection Department 17C� I BLb Date �� L65 P;ZO AM Inspector R DO NOT R ; MOV TH1 ,11- TAG Building Permit # J�' y�ci` MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location e,94c y4i?10 5` e-'�- 13.�5'� This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been f d: Items Listed below must be corrected to gain code compliance �✓ Go/ G//�'L/n�G C-�✓�i T/C�ii� v�C- P 7,) ( e i You are hereby notified that the above corrections shall be made BEFORE,PROCEEDIN�-IAATH AN THER W K -21 Call for re-inspection when corrections are made before continuing W�j ❑ Mak ctio , ' s ' be checked next inspection ❑ OK to ❑ This is not a complete inspection Department RC.e9 Date - a Inspector J �2 ■ ovl NOOT MOOV THII T ' Lf'm 1pMason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar P.O. Box 186 (360) 427-9670 Local (360) 482-5269 Elma Shelton, WA 98584 (360) 275-4467 Belfair r to Notice to Obtain Final Inspection December 13, 2007 DANIEL ORCHARD PO BOX 316 ALLYN WA 98524 Case No.: BLD2004-01494 Parcel No.: 122205017001 Project Description: 2ND STORY ADDITION The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Building Code or the code your permit was issued and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections will result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $64.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you will be charged $64.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 ext 359. Sincerely, �r '�� Terry Rya -� Mason County Department of Community Development Cc: Property File December 13, 2007 BLD2004-01494 3 t py��r" 9/25/2008 Case Atctivity Listing 9:23:03AM Case #: BLD2004-01494 ?14 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By BLDC100 Inspection 2/17/2005 2/18/2005 None FAIL RLS 2/23/2005 KLW ELEVATOR SHAFT FRAME FAILED,ELEVATOR SHAFT INSPECTION, 1.FIRE BLOCK/DRAFT STOP WHERE WALL STUDS MEET FLOOR JOIST AT 1 ST FLOOR AND WHERE WALL MEETS CEILING AT 2ND FLOOR. BLDC 125 Framing Inspection 3/22/2005 3/24/2005 None FAIL TFR 3/25/2005 KLW 1/INSTALL ENTIRE CAULK AND SEAL PACKAGE 2.BACKER ROD AROUND WINDOWS AND DOOR 3/INSTALL CHASE AROUND FLUE AND FIRE BLOCK AT FLOOR AND CIELING ELEVATION 4.AT COLLAR TIES INSTALL MIN 16"SPLICE BLOCK W/8" lOD EA SIDE OF SPLIT AND THEN INSTALL FULL DEPTH BLOCKING BETWEEN RAFTERS 5/DUCT ALL FANS TO EXT. BLDC140 Framing/Plumbing/Mechanical 3/28/2005 3/30/2005 None PASS RLS 3/31/2005 KLW FRAME PASSED,PLUMB MECH LAST C/N FAIL,SEE NEW ITEMS FROM PREV ATTACHED BLDC145 Insulation Inspection 7/l/2005 7/7/2005 None PASS TFR 7/8/2005 KLW WALL AND CEILING INSULATION PAS,STATE INSPECTED DRYWALL IN ELEVATOR SHAFT,OWNER ASKED ABOUT DRYWALL WE REVIEW PLANS NO IBW OR OCCUPANCY SEP TOLD HIM DRYWALL INSP WAS NOT REQUIRED. BLDA985 LTR-Notice Final Inspection 12/13/2007 None DONE TFR 12/13/2007 TFR BLDA900 Telephone Call 1/7/2008 None DONE PIB 1/7/2008 PIB Mr Orchard called to let us know he is working on his project and expects to be ready for his final before 6 months. He is mailing in the$68 fee right away. BLDA987 LTR-Reinstate/Final 9/16/2008 None DONE BTA 9/16/2008 BTA A drive by was conducted by LAW and a"Final Notice to Comply"letter was left on site with the owner.They will have 21 days to comply and a$68 fee will be due prior to each inspection until final pass. BLDC251 Notification of Expiration 9/17/2008 9/17/2008 None DONE LAW 9/17/2008 LAW Pos 7MrsOrchard ed front gate,see photos. --- BLDone Call 9/25/2008 one DONE DLC 9/25/2008 Mr.Ored to letter delivered to home. Received$64 fee from Mr.O in January 2008 but an inspection has not been performed. Left a message for Mr.O but then discovered that the fee was receive answered on the second telephone call. Notified Mrs.O that a progess inspection is required and that written notice requesting an extension shall be required in the future and paymee shall be required for future inspections. d coker 9.25.2008 Page 2 of 2 CaseActivity..rpt