HomeMy WebLinkAboutSEP98-0084 - SEP Determinations - 6/23/1998 MASON COUNTY
PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
Shelton,Wuhington 98584
DATE: June 23, 1998
INTER-DEPARTMENTAL COMMUNICATIONS
TO: Pam Bennett Cumming, DCD - Planner
FROM: Alan A. Tahja, P/W - Co. Hydr. Engr.
SUBJ: SEPA MDNS Review Comments NAME: Art Tozier
SEP98-0084
Pam,
Public Works has reviewed the file pertaining to the Arthur Tozier Jr. fill embankment, and it
appears that the engineering and surveying issues required for this proposal have been adequately
Mr. H R dell LS#27194 .
n r. Lic. No. 9037 and )
provided by Mr. Thomas Richl, P.E. (E g ) �'Y Y (
Inspection of the material suggests that Mr. Richl has considered the scour potential of the 1:1
embankment, and also considered using an armor layer of rock at the embankment's lower
elevation.
I've discussed Mr. Richl's design with him regarding the potential for scour, and he is confident
that the flood flow velocities realized at this location will not present a problem, though we
would both like to see softer fill slopes for aesthetic and maintenance (grass mowing) purposes,
longer slopes would cause the fill to exceed the 3%requirement the fill footprint is required to
respect.
A crude estimate of the fill material needed appears to be somewhere between 550 and 600 cubic
yards of material including the over-excavation and replacement recommended by Mr. Richl
(item#13 of letter dated 6/6/98).
Please feel free to contact me at County extension 461 if you have any questions regarding this
review, or if you have additional concerns you would like more specifically addressed.
Si ce ely,
z
AIL A. Tahj a
File: H:\WP\SEPA\REVIEWS\REVIEWS\TOZR-SV.IDC
STATE o�.
o �
STATE OF WASHINGTON s�
DEPARTMENT OF ECOLOGY
P.O. Box 47775 • Olympia, Washington 98504-7775 • (360) 407-6300 �C 8
'lsOyco �J 998
July 6, 1998 N�jV,3�FpT
Ms.Pam Bennett-Cumming
Mason County Department
of Community Development
PO Box 578
Shelton,WA 98584
Dear Ms. Bennett-Cumming:
Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the
placement of enough fill to elevate an existing 24 x 66 foot residence above flood waters(Case No.
SEP98-0084), located at 401 Bourgault Road West as proposed by Art Tozier. We reviewed the
environmental checklist and have the following comments:
Shorelands 1•
This project appears to be inconsistent with policies and regulations of the Mason County Shoreline
Master Program. At a minimum, it is unclear whether the proposed location is located within the
floodway,and what impacts it's construction may have on other properties therein.
While acknowledging that recent changes in Mason County's local floodplain management plan have
raised relevant legal issues about where shoreline jurisdiction applies,that issue will likely have to be
resolved in court. Meanwhile,we note that until December,the FEMA designated floodway locations
remain in effect, and the regulations need to be applied accordingly.
We ask the County to consider the impacts of this and similar projects on a cumulative basis. Placing fill
and locating homes in areas known to frequently flood puts citizens in avoidable danger. It also makes
necessary continuous maintenance activities and disaster relief at taxpayer expense. We propose that
locating homes in higher ground areas is a more sustainable solution,and ask the county to work
cooperatively with us toward using such an approach.
Shorelands 2•
Is this consistent with the county's flood damage prevention ordinance?
Have the potential impacts to flood levels on neighboring properties been analyzed?
If you have any questions regarding the Shorelands 1 comments,please call Mr.Jeffree Stewart at(360)
407-6521. With questions or comments regarding the Shorelands 2 comments,please call Mr.Dan Sokol
at(360)407-7253.
erely, `
e ite
SEPA Coordinator
AW: (98-3960)
cc: Dan Sokol, SWRO
Jeffree Stewart, SWRO
V
JUL-06-98 MON 08;04 AM SW O FAX NO, 3604076305 P. 02
ETa'rk
o
y
"yt iaue�0
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
P.O. Box 47775 • Olympia, Washington 98504-7775 • (360) 407-6300
July 6, 1998
Ms. Pam Bennett-Cumming
Mason County Department
of Community Development
PO Box 578
Shelton, WA 98584
Dear Ms. Bennett-Cumming:
Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the
placement of enough fill to elevate an existing 24 x 66 foot residence above flood waters(Case No.
SE.P98-0084), located at 401 Bourgault Road West as proposed by Art Tozier. We reviewed the
environmental checklist and have the following comments:
Shorelands 1:
i
This project appears to be inconsistent with policies and regulations of the Mason County Shoreline
Master Program. At a minimum, it is unclear whether the proposed location is located within the
floodway, and what impacts it's construction may have on other properties therein.
While acknowledging that recent changes in Mason County's local floodplain management plan haveSS � 1
raised relevant legal issues about where shoreline jurisdiction applies,that issue will likely have to be w
resolved in court. Meanwhile,we note that until December, the FEMA designated floodway locations
remain in effect, and the regulations need to be applied accordingly.
We ask the County to consider the impacts of this and similar projects on a cumulative basis. Placing till 4
and locating homes in areas known to frequently flood puts citizens in avoidable danger. It also makes kr`'r%
necessary continuous maintenance activities and disaster relief at taxpayer expense. We propose that L
locating homes in higher ground areas is a more sustainable solution, and ask the county to work \
cooperatively with us toward using such an approach.
-� .
Shorelands 2: 11 ,` ��� �,
Is this consistent with the Bounty's flood damage prevention ordinance? 1
Have the potential impacts to flood levels on neighboring properties been analyzed? e�,It I
If you have any questions regarding the Shorelands 1 comments, please call Mr. Jeffree Stewart at(360)
407-6521. With questions or comments regarding the Shorelands 2 comments, please call Mr.Dan Sokol
at(360)407-7253.
rVe
i Lk�
SEPA Coordinator
AW: (98-3960) � '(l
cc: Dan Sokol, SWRO �-
Jeffree Stewart, SWRO
SEP98-0084
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning-Landfill-Utilities
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
Description of Proposal :
FILL FOR ELEVATION OF EXISTING 24X66 RESIDENCE: MAXIMUM FILL FOOTPRINT
SHALL NOT EXCEED 40X90 FEET FOR ELEVATION OF STRUCTURE AND 40X16 FEET FOR
ATTACHED DRIVEWAY. THIS FILL MEETS THE 3; LIMIT FOR FILL IN SROROMISH
DETAILED STUDY FLOODPLAIN. NO ADDITIONAL FILL AUTHORIZED.
Proponent: ART TOZIER
Location of Proposal : 401 W BOURGAULT RD W SHELTON
PARCEL#:421153200100
TR 10 OF NW SW
8 miles north of Shelton on highwa : 101 to bourgault rd turn left, site
is on left just before intersecti! n with Skokomish Valley Road.
Lead Agency: MASON COUNTY
The Lead Agency for this pror;isal has determined that it does not have a
probable significant adversC: impact on the environment. An Environmental
Impact Statement (EIS) is not required under RCW 43 .21C.030 (2) (c) . This
decision was made after review of a completed Environmental Checklist and
other information on file with the Lead Agency. This information is
available to the public upon request. MITIGATION MEASURES ARE
ATTACHED. —Please contact Q/Wl &A6� &'Mml at ext. with any
questions.
This DNS is issued under 197-11-350 (2) , the Lead Agency will not act on
this proposal for 14 days from the date below. Comments must be
submitted by 07/03/98 .
DATE: 06/19/98
Signature of/rej2ponsible official Date
Responsible Official : Gary Yando
Sc) Director of Community Development
-DaA 426 W. Cedar,b��wf PO BOX 578 ACShelton CD c�
_ (360) 427-9670 WA 8584 nn��'�Vr`�
w�mod-� ► ► t S
MIT-DNS, rev: 08/23/96I
Conditions of this Case are listed below:
Case No.:SEP98-0084
1) All upland areas disturbed or newly created by construction
activities shall be seeded, vegetated or given some other
equivalent type of protection against erosion.
X
2) Temporary Erosion control measures must be implemented to prevent
water quality degradation of adjacent waters or wetlands.
X
3) Approved per site plan and topographic cross-section by Tom
Richl, P.E. dated June 6, 1998 and engineering specifications of
letter by Tom Richl, P.E. dated June 6, 1998.
X
4) Footprint for fill for elevation of structure shall not exceed
40x90 feet for residence elevation and 40xl6 feet for driveway.
Lateral setbacks to property lines shall be as per site plan by
Tom Richl, P.E. and dated June 6, 1998. Non-compliance shall
result in STOP WORK ORDER.
5) Proposal shall meet all requirements of Frequently Flooded Areas
Chapter 17.01 .090 of Mason County's Interim Resource Ordinance
including D4(a) Skokomish River Density Flood Fringe requirements
for development in the Skokomish River Density Flood Fringe.
x
6) Site for elevation of residence is within Zone Al of the
Skokomish River Density Flood Fringe, i.e. the Detailed Study Area
on Fema map FIRM 530115 0180D, preliminary map dated September 30,
1998, and identified within the Skokomish River Comprehensive
Flood Hazard Management Plan. The first habitable floor of this
residential structure shall be elevated 1 (one) foot above the
Base Flood Elevation for this site which is 30 feet NGVD. Within
30 days of foundation inspection, applicant shall furnish an
elevation certificate to Mason County Department of Community
Development which certifies that the elevated residence first
habitable floor of this structure meets or exceeds this elevation.
Electrical heating, ventilation, plumbing and air conditioning
equipment and other service facilities shall be designed and/or
other wise elevated or located so as to prevent water from
entering or accumulating within the components during conditions
of flooding. as per Mason County Flood Damage Prevention Ordinance
no. 59-91 . x
Thomas E. Richl, P.E. 2119 North 92nd Street Seattle, Wa. 98103 (206) 524-4819
P.O.Box 21 Lilliwaup, WA, 98555 (360) 877-5545 Mobile(206) 930-5624
FAX (206) 524 4406.
RECEIVED
IVED
June 6, 1998 J U N 0 8 1998
MASON CO. PLANNING DEPT.
Mr. Art Tozier:
110 NO Street
Shelton, Wa. 98584
Subject: Land fill Permit for Skokomish Valley home presently on blocks.
Reference: 1. Initial Engineering Report dated 2-23-98.
2. Second Engineering Report(revised)4-24-98.
3. Letter from MCDCD dated 5-21-98.
4. Third Engineering Report dated 5-24-98.
5. Letter from MCDCD dated 6-1-98.
Dear Mr. Tozier:
I am in reciept of the reference 5 letter and you also recieved a copy. On 6-4-98, I saw
you at your place of business and we discussed this letter. At that time I recommended
that you engage the services of a licenced Land Surveyer and that he run a level course
from Even Toziers bench mark which is considered to be valid by the USGS and
establish a fill level which will be around 4 feet above the present grade,which should be
one foot above BFE (Base Flood Elevation) and 30 feet NGVD. You said that you
would do this.
I am providing a complete set of engineering drawings.
1. Sheet 4 shows the Site Plan. .
2. Sheet 5 shows a Plot Plan of the property and location of the fill area .
3. Sheet 6 shows a Plan View of the fill with relation to the house.
4. Sheet 7 shows Sections 1-1, 2-2 and 3-3 taken from the Plan View.
5. Sheet 8 shows the Foundation Plan for the house to set upon.
6. Sheet 9 shows Section 4-4 taken from the Foundation Plan.
7. Sheet 10 shows Section 5-5 taken from the Foundation Plan.
Sheet 1 of 10
Thomas E. RichL P.E. 2119 North 92nd Street Seattle,Wa. 98103 (206) 524-4819
P.O.Box 21 Lilliwaup,WA, 98555 (360) 877-5545 Mobile(206) 930-5624
FAX (206) 524 4406.
8. I certify that this small fill will not increase the flood level in the Skokomish valley next
to the proposed Tozier fill project.
9. The contractor for this land fill is Tozier Brothers Incorporated of 110 Mill Street
Shelton, Wa. 98584 , Contractor Registration Number is TOZIBI1820.
10. The fill material shall be pit run gravelly/sandy/rocky type with rocks up to 6 inches in
diameter and no more than 5 % of clay and silt.
11. The fill material will come from Miles Sand and Gravel, Sheldon pit at Potlatch and
Tozier Brothers own pit on Rickert Road.
12. The fill material shall be clean and free of organic material and debris. In order to
insure 95 % compaction of the fill, the fill material should be laid down in layers of not
more than 12 to 15 inches in depth and compacted with any suitable heavy equipment
available.
13. The original soil at the site must be removed approximately 12 inches deep below
grade. Stockpile this soil for placement upon the final gravelly fill for grass seeding and
or flower beds and etc.
14. The Engineer of Record shall make periodic inspections so that the specifications for
this land fill are followed.
15. Some concrete specifications are shown on sheet 3.
r
Thomas E. Richl, P.E.
Hof pS
,r + ...........
File: Tozier.LF3 C
37 ;Gc
S .Aa
Sheet 2 of 10
GENERAL SPECIFICATIONS
CONCRETE 5-1/2 Sack mix. 2500 PSI Adequate.
Slump 3" to 4"
Max Aggregate 3/4" to 7/8"
Fly ash may be used
Use vibrators on wall pours
On cold joints use a slurry of portland cement
and water, ratio 1 cement to 3 water.
5 sack mix may be used on floor slabs.
Fibermesh is recommended on all interior slabs
6 mil visaqueen is recommended under all interior slabs
Recommend that concrete not be poured below 40 degrees F.
unless protection is provided against colder temperatures.
For concrete block filler mix can be 70/30 or 60/40 with a
6 sack mix.
Reinforcing Steel Reinforcing Steel per ASTM A706 Grade 60 or ASTM A615M GR
300 (40)
#6 Bars - 3/4" 0 Deformed
#5 Bars - 5/8" 0 Deformed
#4 Bars - 1/2" 0 Deformed
#2 Bars - 1/4" 0 Plain
Lap all splices a minimum of 12"
Place all rebars 2" from edge of walls
except where indicated
Place bottom footing rebars 3" from ground
Rebars to be run continuous through larger
footings to smaller footings and from lower
footings to higher footings and tied
All footings must be placed upon undisturbed
soil - ground - bed rock - compacted crushed rock. etc.
Gas cutting of rebar can only be used to cut off bars
which terminate. No bends and hooks can be made with
heating torch.
Job No: 298-4C
Date:6-6-98
By: T. Richl
File: Tozier.LF3
File:Spec.Gen
Sht 3 of 10
t
I I 1 • 1 � ' � 7
,
I
• � � i i I i { I i i j ► i � ,
£qv�
'
QOufZ74 LT
ART TolatLR.'AF0\I W sr ;
C uRGP.UI.T RQLQ- $0E-%-T01J WA.`18584-
i`�'R 10' of f.1�151�1 AEG 15 "j Z�N Q4VJ � ,
I �ATG�IER`t '
$':IGD`k0II`Mi S It L1.G
I i l i l i
�4C
I i I
j � i
�Do ± �koKOMISN JAu-E� prplp
1 X�
OT %0 O /f
t5Z + Sc.D.t.EC
UC / Lop- lo. A.RC1L.
-rizk<k.uO OF N VJ SUD SEc ►S / i i
aOUSE 2 x.&4, -x 092- : 't5,zL4-
i
�4vyt,308 3 L, 9{►o
—�
— I
/ 1,67
3�Z ± xi �01" FILL, M-S6 , N9, S4-LuwIJ
ho ck o x 4o A
t� x 40 64fl A
�w x ❑i
XX 3.Z 1�7 x 4-3 5 t•9-I.;510 Q
3� e F l 41510 = 4z 41 Cl'
210
PLA..tsJ
WEST Bo►x RU ALT cm)QT`( 2ONb L„oT to - �Vtp`cbc. %o)
(5a FP-cm AssessoR5 M(aj'J
ScA�.E V=100� —
,ba'` Z98-4C
TRICVAL
-S -ga
110
�oor
Y\oLS
40
00
ol
FL �,Q- I S\N a A-C-
I
t (o
" 1
To Co cW TY
R�cNAl.
�� T of Io Tni eta.. Lr--3
No10
vSE FNA mac— t-louse �Nfl
4 5��
GRA D E
� N �
ol
44
l.t, / � S f �p
1 Ct ol '40
rj,�,598-4C
R. F�
flo .
b !o EST; 10,
10
� I 1.ocr�Z'G �N'i�CZ�c�R PAps � 1
4C
To�I G9-, L�3
s�.rc S of 10
2X (o P.T 5\t_L ('LATE
P L A.7-C - U S C 15, M
+ p4ic(+ov-
D,G . � 18u�RaM
4. Dov.JCL5, @
�1ook, X L."j, T'n (-tea. 5?L,
f �
9 '
i
t
I
!O cc07,
I
Z 4-
4<..
-t- C.N
S�� � oG \ O S� ►� E. � \�q�
4
1
r
r w
a"X.
z x PONY W a,LL
S'T'V Q� A'T5�,v�PS o�
4-A 4 P
POST-'
'�'•�E. ��L:t.. �'j..ATE .�.Q U5� �1MPSc�J �.
Gpt�l�.� P� BC4o 02 tqutiJ.
AT SG
- w �
.._ ALTIFfL�j ATL'
T 4>^ TO
'1&¢ 0,9p.s EAC 1 *41Y-rho.
T'o 2iE 8 o.L�
-- %m7fAloe rLooR 5t3FR'-IFCr
•Su��" 1 t7 o F i 0 'C"o�e��':
1`0 BE COMPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
A. BACKGROUND:
1. Name of proposed roje t�f a plicable L�-
�o �
2. Name of applicant:
1J�7 • // y /E-rz--
3. Address & phone number of applicant & contact person:
\'N C C) r a tect &T4 L-:-7 �
4. Date checklist prepared:
5. Agency requesting checklist:
G. Proposed timing or schedule (in6luding phasing, if applicable) :
7. Do you have any plans for future expansion, or further activity
related to or connected with this proposal? If yes, explain.
� Y
8. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this
proposal.
9. Do you know whether applications are pending for governmental
approvals of other proposals directly affecting the property
covered by your proposal? If yes, explain.
10. List any government approvals or permits that will be needed
for your proposal, if known.
f complete description of our proposal, including
11. Give a brief, p p y p p ► 9 /-
the proposed uses and the size of the project and site. There
are several questions later in this checklist that ask you to _�-
describe certain aspects of your proposal. You do not need to
repeat those answers on this page. (Lead agencies may modify
this form to include additional specific information on project 1
description. ) F-J ��QA � '` h JIKV✓ ---
1
1
TO BE COMPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
12. What is the location of the proposal? Give sufficient
information for a person to understand the precise location of
your proposed project, including a street address, if any, and
section, township, and range, if known. If a proposal would
occur over a range of area, provide the range or boundaries of
the site(s). Provide a legal description, site plan, vicinity
map, and topographic map, if reasonably available. While you
should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any
permit applications related to this checklist. 6oI.-✓6 WE5--f o, T r. "4ttIC7�
lv�slfll� z. / nla��� ,�ir�y L y� �✓ �. /Yf .
B. ENVIRONMENTAL ELEMENTS:
1. EARTH:
a. al description of the site (circle one) :
Flat, rolling, hilly, steep slopes, mountainous,
r
b. What is the steepest slope on the site (approximate
percent slope)? f +O -z— 4-0
C. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soils,
specify them and not any prime farmland.
d. Are there surface indications or history of
unstable soils in the immediate vicinity? If so,
describe.
/Kli/n/V
2
'IO BE COMPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
e. Describe the purpose, type, and approximate
quantities of any filling or grading proposed.
Indicate source of fill. rr h.O �J
f-?� fi ! S. 1V)'6144 WARt
S W l( A �! �r,Q d (9 AJ
0 I{ (AS4,V,a� , �6uve� will e; (ova. 01i� (,0��t.;�� kti�c s 6r 7�vo ,fin_
f. t uld erosion occur as a result of clearing, I
construction, or use? If so, generally describe. ( 1 )
Lf-O x" q0 Wk
g. About what percent of the site will be covered with Q, fo Y1 6 �
impervious surfaces after project constructions
(for example, asphalt or buildings)?
S at(A�L CA.S C U L11/1u,�1`l /
Ll 5� c! I „
h. Proposed measures to reduce or control erosion, or
other impacts to the earth, if any. : f /
t �v d t t) ( (,( d �f tNe/t✓! .c t y q �'�/
2. AIR:
a. What types of emissions to the air would result
from the proposal (i.e. dust, automobile, odors,
industrial wood smoke) during construction and when
the project is completed? If any, generally
describe and give approximate quantities, if known.
b. Are there any off-site sources of emissions or odor
that may affect your proposal? If so, generally
describe.
C. Proposed measures to reduce or control emissions or
other impacts to air, if any:
3
a. "X_L-n l c,. DI errLIUAR i EVALUATION FO8
AGENCY USE ONLY
3. WATER:
a• Surface:
1) Is there any surface rater body on or in the immediate
vicinity of the site (including year-round and seasonal
streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or
river it flows into. I I
I
2) Will the project require any work over, in, or adjacent to
(within 200 feet) of the described waters? If yes, please
describe and attach available plans.
/ U
3) Estimate the amount of fill and dredge material that would
be placed in or removed from surface water or wetlands and
indicate the area of the site that would be affected.
Indicated the source of fill material.
A �a .
4) Will the proposal require surface water withdrawals or
diversions? Give general description, purpose, and approximate
quantities if known.
1� ,,.
S) Does the proposal lie within a 100-year floodplain? If so, ��L��j U )
note location on the site plan. � ►1
L
6) Does the proposal involve any discharges of waste materials
to surface waters? If so, describe the type of waste and
anticipated volume of discharge.
4
I I
TO BE COMPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
b. Ground:
1) Will ground rater be withdrawn, or will rater be discharged
to ground water? Give general description, purpose, and
approximate quantities, if known.
2) Describe waste material that will be discharged into the
ground from septic tanks or other sources, if any (for example,
Domestic sewage: Industrial, containing the general size of
the system, the number of such systems, the number of houses to
be served (if applicable), or the number of animals or humans
the system(s) are expected to serve.
i
17(Joud�, C�4 (('a h It
C. Water Runoff (including storm water) :
1) Describe the source of runoff (including storm water) and
method of collection and disposal, if any (include quantities,
if known). Where will this water flow? Will this water flow
into other waters? If so, describe.
2) Could waste materials enter ground or surface waters? If so
generally describe.
/�U
d. Proposed measures to reduce or control surface, ground, and
runoff water impacts if any: r`
�{! I 9
lV � � @� V 'l!�2l✓S W( VI � WiQ (/(/Lt, (�1�
4. PLANTS:
a. Check or circle types of vegetation found on the
site:
deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
/ grass
/ pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage,
others
water plants: water lily, eelgrass, milfoil, other
5
TO BE COMPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
b. What kind and amount of vegetation will be removed
or altered?
C. List threatened or endangered species known to be
on or near the site.
c4d,�-
d. Proposed landscaping, use of native plants, or
other measures to preserve or enhance vegetation on
the site, if any:
Jt/JA-
5. ANIMALS:
a. Circle any birds and animals which have been
observed on or near the site or are known to be on
or near the site:
birds: hawk, heron, eagle,�songb_ird, other
mammals: deer, bear, elk, beaver, other '
fish: bass, salmon, trout, herring, shellfish, other ti e
b. List any threatened or endangered species known to
be on or near the site.
/Itr'/_
C. Is the site part of a migration route? If so,
explain. ,,ff
N�
d. Proposed measures to preserve or enhance wildlife,
if any:
l 61 c
6. ENERGY AND NATURAL RESOURCES:
a. What kinds of energy (electri natural gas, oil,
wood stove, solar) will be used to meet the
completed project's ever needs? Describe whether
it will be used for ea ng, manufacturing, etc.
6
TO BE COMPLETED BY APPLICANT AGENCY EVALUATION
OFOR
USE
b. Would you project affect the potential use of solar
energy by adjacent properties? If so, generally
describe. nI p
C. What kinds of energy conservation features are
included in the plans of this proposal? List other
proposed measures to reduce or control energy
impacts, if any:``
YJ
7. ENVIRONMENTAL HEALTH:
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that
could occur as a result of this proposal? If so,
describe.
Ajb . , _
1) describe special emergency services that might
be required.
2) Proposed measures to reduce or control
environmental health hazards, if any:
b. Noise.
1) What types of noise exists in the area which may
affect your project (for example: traffic, '/ •1
equipment operation, other)?
sib �(�c� z������ ��e� f►�P �K� �s k0A ► ��— A�
2) What types of levels of noise would be created
by or associated with the project on a short-term
or a long-term basis (for example: traffic,
construction, operation, other)? Indicate what
hours noise would come from the site.
1 1 f
7
TO BE COMPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
3) Proposed measures to reduce or con
trol noise
impacts, if any:
Awe
8. LAND AND SHORELINE USE:
a. What is the current use of the site and adjacent
properties?
b. Has the site been used for agriculture? If so,
describe.
C. Describe any structures on the site.
HDu�t ' I V , -:�, -6�tvd -PAW,P Orb e ! (1i
d. Will any structures be demolished? If so, what? / 1
e. What is the current zoning classification of the
site? 0,1
f. What is the current comprehensive plan designation
of the site? Ztvq qil
g. If applicable, what is the current shoreline master
program designation of the site?
5awo ao�
h. Has any part of the site been classified as an
'environmentally sensitive" area? If so, specify.
/,(b
i. Approximately how many people would reside or work
in the completed project?
GD 4 v
J. Approximately how may people would the completed
project displace?
8
TO BE COBPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
k. Proposed measures to avoid or reduce displacement
impacts, if any: NA
1. Proposed measures to ensure the proposal is compatible
with existing and projected land es nd plans, if any:
/s is I � I� �' WJ11 �?' V�
9. HOUSING:
a. Approximately how may units, if any, would be
provided? Indicate whether high, middle, or low-
income housing.
b. Approximately how many units, if any, would be
eliminated? Indicate whether high, middle, or low-
income housing. X4
C. Proposed measures to reduce or control housing
impacts, if any: d /4,
10. AESTHETICS:
a. What is the tallest height of any proposed
structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
Po FG< E c c(
b. What views in the immediate vicinity would be
altered or obstructed?
A�fL
C. Proposed measures to reduce or control aesthetic
impacts, if any:
11. LIGHT AND GLARE:
a. What type of light or glare will the proposal
produce? What time of day would it mainly occur?
9
TO BE COMPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
b. Could light or glare from the finished project be a
safety hazard or interfere with views?
414
C. What existing off-site sources of light or glare
may affect your proposal:
d. Proposed measures to reduce or control light and
glare impacts, if any:
1 4
12. RECREATION:
a. What designated and informal recreational
opportunities are in the imme iate vicinity?
s4L 4 TI- avla. I -(�ro(k S
b. Would the proposed project displace any existing
recreational uses? If so, describe.
/1D
C. Proposed measures to reduce or control impacts on
recreation, including recreation opportunities to
be provided by the project or applicant, if any:
d1W
13. HISTORIC AND CULTURAL PRESERVATION:
a. Are there any places or objects listed on, or
proposed for, national, state, or local
preservation registers known to be on or next to
the site? If so generally describe.
N6
b. Generally describe any landmark or evidence of
historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
1161le
c. Proposed measures to reduce or control impacts, if
any: , 14
10
L
TO BE COMPLETED BY APPLICANT nrai.ua i iun run
AGENCY USE ONLY
14. TRANSPORTATION:
a. Identify public streets and highways serving the site and
describe proposed access to the existing street system.
Show on site plans, if any. ?
g
b. Is site currently served by public transit? If
not, what is the approximate distance to the
existing street system. Show on site plans, if
any.
C. How many parking spaces would the completed project
have? How many would the project eliminate?
d��
d. Will the proposal require any new roads or streets,
or improvements to existing roads or streets, not
including driveways? If so, generally describe
(indicate whether public or private).
N/
(A
e. Will the project use (or occur in the immediate
vicinity of) water, rail, or air transportation?
If so generally describe.
A//4
f. How many vehicular trips per day would be generated
by the completed project? If known, indicate when
peak volumes would occur
g. Proposed measures to reduce or control
transportation impacts, if any:
11
r
70 HE COMPLETED BY APPLICANT EVALUATION FOR
AGENCY USE ONLY
15. PUBLIC SERVICES:
a. Would the project result in an increased need for
public service (for example: fire protection,
police protection, health care, schools, other)?
If so generally describe.
A
b. Proposed measures to reduce or control direc
t
impacts on public services if any:
P P • Y
/�k
16. UTILITIES:
a. Circl ities currently available at the site:
electricity natural gas, water refuse service,
ele hone sanitary serer, septic syste other.
b. Describe the utilities that are proposed for the
project, the utility providing the service, and the
general construction activities on the site or in
the immediate vicinity which might be needed.
17. SIGNATURE:
The above answers are true and complete to the best of my
knowledge. I understand that the lead agency is relying on
them to make its decision.
Signature:
Date Submitted: J 3�
(P7
12