MEPA930 Letter attached. See documents 11/13/2007 None DONE MMS 11/13/2007 MMS
Don Atkins
1540 Kirkland Ave
Kirkland,WA 98033
November 13,2007
Re:32235-75-90130&90120
Dear Mr.Atkins,
I am in receipt of your application for a forest practices permit for the above referenced parcels,near Union,Washington.I visited the site last week and was surprised to see that the site had already been
logged,stumped and graded. When I returned to the office,I investigated the history of this parcel.In the process I learned that the property was logged without a permit in the summer of 2006.I also saw
that an enforcement investigation was done by the County,leading up to an application for an after-the-fact Mason Environmental Permit(MEP2007-00031).From what I can tell,this permit has not been
approved my Mason County.A geo-technical report was forwarded to Public Works for review in March,but has not been approved.Beyond that,the status of your MEP is unclear,as I was unable to find a
copy of your actual MEP application/file.For the record,I did notice that the MEP application was submitted with the standard review fee,when triple fees are required.If you have additional questions on
the status of your MEP,please contact our code enforcement staff,Ryan Crater,at ext.577.
I
I am also concerned that you may not realize that,per state law,the portions of your property subject to the unpermitted harvest are automatically subject to a six year development moratorium from the date
of discovery.I have recorded a Notice of Moratorium on your property(copy enclosed),but this is just a notice-the actual moratorium dates back to July 26,2006.
Going forward,I am happy to review your current application,once you or your agent clarifies what you wish to do.Taken at face value,your site plan(which doesn't meet the County's criteria because it
contains no contour information)suggests that you plan to harvest every tree above Timber Tides Drive.However your SEPA checklist states that the objective is only to cut trees that might pose a potential
hazard to an eventual home site.I am enclosing a copy of the site plan as submitted along with some topographic information.Please have the map upgraded to meet all of the following criteria and returned
to my attention.
I. Harvest boundaries and tree retention areas.
II.The approximate location of any structures.
III.The location of all existing and proposed streets,rights-of-way,easements,skid roads,and landings within the proposal.
IV.The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping,open space,wildlife habitat,screening and/or buffers.
i
V.Site topography at contour intervals of 40 feet.
VI.Critical areas and critical area buffers pursuant the Critical Areas Ordinance.
VII.Drainage ways and culverts.
VIII.Site area targeted for further harvest including proposed timing.
Page 2 of 4 CaseActivity..rpt
Case Activity Listing 5/21/2019
2:57:52PM
Case#: MEP20O7-00031
Parcel#: 322357590120
1
Description:
Asstgned� one
Activity Description Date 1 Dat e3 Hold Disp To By Updated Updated Qy
1X.North arrow and scale shall be shown on all site plans.The scale shall be no smaller than one inch to 200 feet.(I have enclosed a base contour map of appros. l"to 100'for your use).
Related to item VII,but possibly not fully captured by it,your site plan will be forwarded to Mason County Public Works to be reviewed for consistency with the 1992 WSDOE Stormwater Manual.
I have forwarded your geo-technical report to an outside contract engineer for review(an additional charge will be applied for this work),and I have visited the site.Beyond that,there is nothing more that I
can do with your application until a complete site plan is received,as well as a general clarification regarding the scope of your proposal.It is possible that additional information could be required once the
review begins.In order to keep this case open,please respond within 180-days.If you have any questions regarding the FPA or the development moratorium,please contact me at extension 571 or by e-mail at
mms@co.mason.wa.us.Please note that approval of this permit does not lift the exiting development moratorium.
Sincerely,
Michael MacSems
FPA Reviewer
cc: Ryan Crater(Code Enforcement)
Joe Staley(W'IM)
Bob Fink(DCD Manager)
John Sliva(Public Works)
Page 3 of 4 CaseActivity..rpt
• Case Activity Listing 5/21/2019
2:57:52PM
Case#: MEP2007-00031
Parcel #: 322357590120
Description:
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
MEPA930 Letter attached. See documents 5/27/2009 None DONE MMS 5/27/2009 MMS
Don Atkins
1540 Kirkland Ave
Kirkland,WA 98033
May 27 2009
Re:32235-75-90130&90120
Dear Mr.Atkins,
This letter is follow up the meeting we had in November 2007,concerning your above referenced parcels in Mason County.At that meeting we discussed the status of a MEP 2007-00031 (regarding
unpermitted logging in 2006)FPA 2007-00022(for additional logging)as well as process for getting a waiver from the six-year development moratorium that resulted from the unpermitted logging.
Attending that meeting on 11/29/07 were Joe Staley,(WTM)Ryan Crater(former Code Enforcement Officer)and Bob Fink(former Planning Manager).According to my notes,at the conclusion of that
meeting you agreed to have an existing geotechnical report revised to cover the FPA plus the MEP and a Moratorium Waiver and Joe Staley was going to revise the site plan for more detail.Mason County has
heard nothing from you since then.
I am enclosing copies of the letters that I have written to you on 11/13/07 and 11/29/07.Per Mason County Code,I need you to provide me with the material that I asked for in these letters with in 180-days of
today's date,in order to avoid having to close your FPA case.Should your FPA case(for work to be done in the future)be closed,you will still need to do satisfy Code Enforcement regarding the unpermitted
logging that occurred in 2006(MEP 2007-00031).Since our meeting in 2007,we have a new Code Enforcement Officer,Christine Clark at ext.577.
Regarding the problems with your existing geotechnical report,Mason County has since revised the way that these documents are reviewed and you could ask to re initiate the review of you report,but this
would involve some additional fees and paper work.If you have any questions,I can be reached at ext.571 or by e-mail at mms@co.mason.wa us.Thank you.
Sincerely,
Michael MacSems
FPA Reviewer
cc: Christine Clark
Barbara Adkins
Joe Staley
Page 4 of 4 CaseActivity..rpt