HomeMy WebLinkAboutSPI2005-00050 - SPI Inspections - 3/21/2005 oN'STgTF MASON COUNTY
o Py A o °N DEPARTMENT OF COMMUNITY DEVELOPMENT
> s N Planning Division
P N 1 P O Box 279, Shelton, WA 98584
Y
�° (360)427-9670
1864
Site Inspection
March 21, 2005 �2-2SS -S2 -0Z0�0�`
MARK PEAKE
3111 NE OLD BELFAIR HIGHWAY TO BE KEPT IN TFIL
BELFAIR WA 98528 PARCEL FILE
Case No.: SP12005-00050
Parcel No.: 322355202904
Project Description: DETERMINE SETBACKS FOR REMODEL/REBUILD AND
DETERMINE SQUARE FOOTAGE.
Dear Applicant:
Pursuant to your application, a site pre-inspection (SPI)was performed on your property. Below you
will find comments made regarding the proposed development and its critical values.
In some cases, setbacks for development from shorelines, steep slopes, streams, and wetlands must
be included in your specific proposal; these setbacks are included as part of the comments listed
below.
This information is based on County and State regulations as they exist to date. These regulations
may change and may affect the requirements for development of the subject property.
Please contact me at(360) 427-9670, ext. 363 if you have questions.
Sincerely,
Kell McAbo
y
Land Use Planner
Mason County Planning Department
3/21/2005 1 of 3 SP12005-00050
Site Inspection
3/21/2005 Case No.: SP12005-00050
Comments: Pre-inspection for Mark & Geri Peake
Purpose: To determine all the necessary setbacks from the
shoreline buffer for remodeling or rebuilding the existing
residence.
Lot Description: The site inspected is the portion of the lot located
on the north side of HWY 106 and on the south shore of Hood
Canal. The lot is 70' wide and 50' deep. Sixty feet of the width to
the west is on fill enclosed by a concrete bulkhead on the east,
north and west. There is an existing single-wide mobile home, an
uncovered deck and a concrete boat ramp. Footprint of the
residence is 53' wide by 11' deep plus a covered entry for a total
of 613 square feet. The existing bulkhead on the west, north and
east is considered the Ordinary High Water Mark (OHWM). The
residence is approximately 10 feet back from the OHWM on the
north, approximately 7 feet from the OHWM on the west and 1'
from the OHWM on the east.
Shoreline Designation: Urban
Zoning: The zoning designation for the site is Rural Residential 5
(RR5).
Setbacks: Standard setbacks for this zoning are a 25 foot front
yard setback and a 20 foot setback for side and back yards. The
front yard refers to the lot line adjacent to the property access,
including access easements. The setbacks are measured from
structures above grade such as roof overhangs (roof gutters), and
other structures/appurtenances, including heat pumps etc. When
the lot width is less than 100 feet, setbacks would equal 10% of
the lot width. In this case, where the back and side yards are
adjacent to the Urban shoreline of Hood Canal, setbacks are a
minimum of 15 feet per Mason County Shoreline Master Program
(SMP) 7.16.080.
Geological/landslide hazards: The purpose of this site
pre-inspection does not address the steep slope on the landward
side of the HWY. No other critical areas were present.
Options: The minimum setback under the SMP is 15 feet, and the
minimum buffer from a saltwater shoreline under the Mason
County Resource Ordinance (17.01.110 figure 1) is 20 feet plus a
15 foot building setback for a minimum of 35 feet. Therefore, the
existing house is considered as a legal non-conforming use since
it rests entirely within the Resource buffer and within the Shoreline
setback. The Fish & Wildlife Habitat Conservation Areas section
3/21/2005 2 of 3 SP12005-00050
Site Inspection
3/21/2005 Case No.: SP12005-00050
of the Resource Ordinance allows for the remodeling or rebuilding
of an existing non-conforming structure plus 10% (17.01 .110
F.1 .a.) as long as it does not encroach further into the buffer. A
second story is also allowed, but it too cannot encroach further
into the buffer and must maintain the minimum 15-foot setback
per the SMP. Since OHWM is on three sides of the property, this
must be taken into account for side yards as well as the backyard
(shore side). Given the current footprint of 613 square feet, the
structure could expand to 674 square feet, plus a second story.
The footprint can be modified from the current 53' wide by 11'
deep to accommodate all the setbacks, allowing for a full second
story. For example, 30' wide by 22.5' deep set 15' from the west
and east bulkhead, 10' from the north bulkhead and 10.5 feet
from the front access easement. The second story must be 15'
back from the OHWM. A reduction in the required front yard
setback can be given as an administrative variance of no less
than 10 feet distance from the road access easement boundary
per Mason County Development Regulations 1 .05.034 C., ONLY
if the lot meets certain circumstances.
The residences to the east and west both protrude over the
OHWM, therefore, a second story proposal from this site does not
conflict with the common line.
General process: Future site development must include a site
plan showing all setbacks from property and shore lines for
building permit application submittal. Specific development
standards contained in County Codes may be found at the County
web address http://www.co.mason.wa.us. If you have any
questions please feel free to call. Thank you.
3/21/2005 3 of 3 SP12005-00050
MASON COUNTY
,`� ! ti '5y, ,c3 - CSC-G)
PLANNING DEPT. PRE-INSPECTION APPLICATION
PLEASE PRINT $205.00 Fee iRequired
1. Owner: V Applicant: l�; v►. r_L a �j(,vlv�Z
Site Address: ' Address:rApplicant •— �'c
Owner dress: I 6CLaia 'if
City: St Zip
City: St INA Zip 1 Phone:_U day
Phone:_ -? ) '10 _ day Phone:_( ) evening
2. Parcel No,
Parcel No. ---t2U. 3 15 __ Email Address:
Le. igtioFl: Planner: GBM RAM DW SAL TSC
SMP Comp. Plan Type of Use
Water Body
3. Purpose of Pre-inspection : s- Alln •G
N
4. Use of Building:
5. Do any of the following exist on or adjacent to property?: slope M saltwater lake ( river
pond ( ) wetland ( ) seasonal runoff( other( stream (x) seasonal creek ( )
r11 I �Directions to Site: At 0 I
c
v/ Z U
.If the information is incomplete, then Mason County must disclaim any errors resulting from deficiencies in the
original application. Pre-inspection reports remain valid only until development changes occur in the vicinity which
affect the lot evaluated in this inspection, or the laws regulating development of the site change after the time of
inspection.
Applicant Signature: Date:
If you would like to be on site during inspection, please check here: A �� a.;,Gp �✓Y� "'�1 �t'n'c
U A-Return application to: Department of Community Development, Planning Division R E C E
P.O. Box 279 V E D
Shelton, WA 98584 FEB 1 7
(360)427-9670 2005
Please include a $205.00 check or money order payable to Mason County Treasurer BELFAIR OFFICE
When completed, this form becomes part of the parcel file.
FOR OFFICE USE ONLY: Accepted by: Date:
Please illustrate below the proposed building site in relation to water&property lines:
-41" MORE ON BACK SIDE
Please illustrate below the proposed building site in relation to water and property lines:
�00 ;
'emu
�7
\ z V"I
I
� V
c ,
Departmental Review
(For Office Use Only)
Planning Department Findings:
revised 12-26-2003 SRG
MASON COUNTY, WA 2/17)2005
Building Department 1:10:21P t
Environmental Health Department
Planning Department
P14
Permit status and inspection results can nowbe checked on the web-www.co.mason.wa.us/permits
Building Dept. inspections requests can be made via the web-www.co.mason.wa.us/community_dev
Receipt #: B1200500000000000059
Date: 02/17/2005
Line Items:
Case No Tran Code Description Revenue Account No Amount Paid
SPI2005-00050 Site Inspection Fee 001.125.145.345.83.04.0000 205.00
-----------------------------------------------------------------
PRIMARY APPLICANT FOR SPI2005-00050: PEAKE,MARK
Line Item Total: $205.00
Payments:
Method Payer Bank No Account No/Check No Confirm No How Received Amount Paid
Check PEAKE, INC. KEY BANK 8777 In Person 205.00
Payment Total: $205.00
Page 1 of I cReceipt.rpt