Exemption from Shoreline Management Act
Case No.: SHX2009-00021 Substantial Development Permit Requirement
The Proposal By: PATTI ARCAND
E 40 MERRIMOUNT
UNION, WA 98592
To undertake the following development:
Proposal to install rock bulkhead on waterward side of Highway 106.
Within and/or its associated wetlands is exempt from the requirement of substantial development because the
development is categorized under WAC 173-27-040(2) as being category
C-normal protective bulkhead
Please contact Kell McAboy at ext 363 if you have any questions.
Issued: 7/17/2009 Vf 0_'e
Expires: 7/17/2011 Authorized Local Government Official
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
---------------------------------------i
2009
OO9 AGENCY USE ONLY
oj-
US Army Corps t Date received:
of
of Engineers
WAS H I N G TO N STATE , � l
Seattle Dis'nct ,
Joint Aquatic Resources Permit
l
l
l
l l
Application (JARPA) Form hel l
Agency reference#:
l l
l l
USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW. Tax Parcel#(s): ;
Part 1—Project Identification ;
Unique project information that makes it easy to identify. helpl '---------------------------------------'
la. Unique Project Identifier Number (UPI #) Lheil ]
• Don't have one yet? Get one at ttp://www.ei)ermifting.wa.gov or call the Washington Governor's Office of Regulatory Assistance
at(800)917-0043.
1 b. Project Name (Examples: Smith's Dock or Seabrook Lane Development) [ ]
Arcand Bulkhead Project
Part 2—Applicant
The person or organization legally responsible for the project. [ ]
2a. Name (Last, First, Middle) and Organization (if applicable)
Arcand, Patti
2b. Mailing Address (Street or PO Box)
40 E Merrimount Dr
2c. City, State, Zip
Union WA 98592-9639
2d. Phone(1) 2e. Phone(2) 2f. Fax 2 . E-mail
Please contact ( ) ( )
agent
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this
application.) [b-el
3a. Name (Last, First, Middle) and Organization (if applicable)
Kim Schaumburg
3b. Mailing Address (Street or PO Box)
10112 Bayview Rd KPN
3c. City, State, Zip
Vaughn, WA 98394
3d. Phone(1) 3e. Phone(2) 3f. Fax 3g. E-mail
(253) 884-5776 (253) 225-2973 (253) 884-5776 Kimberly035@centurytel.net
JARPA 2009 Page 1 of 12
I
Part 4—Property Owner(s) hem
Contact information for people or organizations owning the property(ies)where the project will occur. hem
X ❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple property owners. Complete the section below and use JARPA Attachment A for each
additional property owner.
4a. Name (Last, First, Middle) and Organization (if applicable)
4b. Mailing Address (Street or PO Box)
4c. City, State, Zip
4d. Phone(1) 4e. Phone(2) 0. Fax 4g. E-mail
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. [ ]
❑ There are multiple properties or project locations (e.g., linear projects). Complete the section below and use
JARPA Attachment B for each additional property.
5a. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5n.) hel
40 E Merrimount Drive
5b. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) hel
Union, WA 98592
5c. County hem
Mason
5d. Provide the section, township, and range for the project location. [ ]
1/4 Section Section Township Range
35 22N 03W
5e. Provide the latitude and longitude of the project location. heI
• Example:47.03922 N ]at./-122.89142 W long
5f. List the tax parcel number(s) for the project location. [ ]
• The local county assessor's office can provide this information.
322355202003
5g. Indicate the type of ownership of the property. (Check all that apply.) hem
❑ State Owned Aquatic Land ❑ Tribal X❑ Private
❑ Other publicly owned (federal, state, county, city, special districts like schools, ports, etc.)
5h. Contact information for all adjoining property owners, lessees, etc. (If you need more space, use JARPA Attachment
JARPA 2009 Page 2 of 12
C.) el
Name Mailing Address Tax Parcel # (if known)
Jeffery Ramsaur 50 E Merrimount Dr, Union WA 98592 322355202002
James and Candy Hungerford PO Box 1191, Shelton WA 98584 322355202001
Mark and Geraldine Peake 9611 E SR 106, Union WA 98592 322355202903
5i. Is any part of the project area within a 100-year flood plain? ( )
X❑ Yes ❑ No ❑ Don't know
5j. Briefly describe the vegetation and habitat conditions on the property. [
The property is directly adjacent SR Hwy 106. There are a few small trees (Douglas fir, cedar, and alder) on the
bank.
5k. Describe how the property is currently used. t el
Residential.
51. Describe how the adjacent properties are currently used. ( I
Residential or recreational.
JARPA 2009 Page 3 of 12
5m. Describe the structures (above and below ground) on the property, including their purpose(s). nei
There is a SFR and a septic drainfield on the hillside above SR Hwy 106. Both are self-explanatory.
5n. Provide driving directions from the closest highway to the project location, and attach a map. hei
From Belfair, take Hwy 106 west, toward Union. The site is located on the shoreline, just west of
Merrimount Drive.
Part 6—Project Description
6a. Summarize the overall project. You can provide more detail in 6d. [
Shoreline protection is to be constructed using large angular rock running landward of the toe of the
bank, along approximately 110 to 120 lineal feet of frontage.
6b. Indicate the project category. (check an that apply.) [
❑ Commercial X❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6c. Indicate the major elements of your project. (check all that apply.) [
❑ Aquaculture ❑ Culvert ❑ Float ❑ Road
❑ Bank Stabilization ❑ Dam /Weir ❑ Geotechnical Survey ❑ Scientific Measurement
❑ Boat House ❑ Dike/ Levee /Jetty ❑ Land Clearing Device
❑ Boat Launch ❑ Ditch ❑ Marina / Moorage ❑ Stairs
❑ Boat Lift ❑ Dock/ Pier ❑ Mining ❑ Stormwater facility
❑ Bridge ❑ Dredging ❑ Outfall Structure ❑ Swimming Pool
X❑ Bulkhead ❑ Fence ❑ Piling ❑ Utility Line
❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall (upland)
❑ Channel Modification ❑ Fishway
❑ Other:
JARPA 2009
Page 4 of 12
6d. Describe how you plan to construct each project element checked in 6c. Include specific construction
methods and equipment to be used. [help]
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year flood plain.
Shoreline protection is to be constructed using large angular rock running landward of the toe of the
bank, along approximately 110 to 120 lineal feet of frontage, including one set of beach access steps.
Height of the bulkhead to be a maximum of 6 feet above the existing beach grade. Base rock to be
keyed into beach a minimum of 18-24 inches below the existing beach grade. Entire bulkhead to be
backed with 4-8 inch quarry spalls and filter fabric running the length of the bulkhead. Entire bulkhead
to be constructed landward of MHHW. Minimal vegetation shall be disturbed. Existing manmade
debris shall, including concrete and asphalt, shall be removed from the site. All activities are within
the 100-year flood plain. The nearest waterbody is the Hood Canal.
6e. What are the start and end dates for project construction? (month/year) nel
• If the project will be constructed in phases or stages, use JAKF'A Attachment D to list the start and end dates of each phase or
stage.
Start date: As soon as all required permits have been obtained, and as per the time provisions of
the HPA. End date: ❑ See JARPA Attachment D
6f. Describe the purpose of the work and why you want or need to perform it. nel
The proposed bulkhead replacement, as per the owner's request, is for protection of the bank toe
from erosion due to wave and tidal action. Rock is the only material that is both environmentally
friendly and strong enough to be used in the construction of a marine bulkhead.
6g. Fair market value of the project, including materials, labor, machine rentals, etc. hel
$15,000.
6h. Will any portion of the project receive federal funding?
• If yes, list each agency providing funds.
❑ Yes X❑ No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.)
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands.
X❑ Not applicable
DARPA 2009 Page 5 of 12
it -- - -
7b. Will the project impact wetlands? hei
❑ Yes ❑ No ❑ Don't know
7c. Will the project impact wetland buffers? [help
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? [ ]
• If yes, submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? [ ]
• If yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? heI
• If yes, submit the plan with the JARPA package.
❑ Yes ❑ No ❑ Not applicable
7g. Use the table below to list the type and rating of each wetland that will be impacted; the extent and duration
of the impact; and the type and amount of compensatory mitigation proposed. If you are submitting a
compensatory mitigation plan with a similar table, you may simply state (below) where we can find this
information in the mitigation plan. hel
Activity causing Wetland type Impact area Duration Proposed Wetland
impact (fill, and rating (sq. ft. or acres) of impact2 mitigation mitigation area
drain, excavate, category type' (sq. ft. or acres)
flood, etc.)
I�
Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland
I
rating forms with the JARPA package.
2 Indicate the time(in months or years, as appropriate)the wetland will be measurably impacted by the activity. Enter"permanent"if
applicable.
3 Creation (C), Re-establishment/Rehabilitation (R), Enhancement(E), Preservation(P), Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
7h. For all filling activities identified in 7g., describe the source and nature of the fill material, the amount in
cubic yards that will be used, and how and where it will be placed into the wetland. nel
I
I
i
7i. For all excavating activities identified in 7g., describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. [ ]
JARPA 2009 Page 6 of 12
7j. Summarize what the compensatory mitigation plan is meant to accomplish, and describe how a watershed
approach was used to design the plan. hel
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) hel
❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hel
❑ Not applicable
The proposal is landward of MHHW and it will have minimal negative impacts on aquatic habitat and
other uses of the waterbody, plus the use of rock provides habitat for marine life. BMPs shall be
followed during construction to protect water quality at the site. The WDFW's HPA provisions and
marine construction rules shall also be strictly adhered to. Manmade debris shall be removed from the
site, and non-native rock (basalt rip-rap) on the beach shall be utilized as quarry spalls in the project.
8b. Will your project impact a waterbody or the area around a waterbody? hel
X❑ Yes ❑ No
8c. Summarize impact(s) to each waterbody in the table below. [
Activity causing Waterbody Impact Duration Amount of Area (sq. ft. or
impact (clear, name location' of impact2 material to be linear ft.) of
dredge, fill, pile placed in or waterbody
drive, etc.) removed from directly affected
waterbody
The construction of The Hood Marine Approx. Bulkhead to be 110 to 120 linear
a rock bulkhead. Canal shoreline 10 days constructed feet along the
landward of MHHW. shoreline.
Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the
waterbody and indicate whether the impact will occur within the 100-year flood plain.
z Indicate the time (in months or years, as appropriate)the waterbody will be measurably impacted by the work. Enter"permanent"if
applicable.
8d. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? nei
• If yes, submit the plan with the JARPA package.
X❑ Yes [:] No ❑ Not applicable
8e. Summarize what the compensatory mitigation plan is meant to accomplish. Describe how a watershed
approach was used to design the plan.
• If you already completed 7j., you do not need to restate your answer here. hei
JARPA 2009 Page 7 of 12
See Arcand Habitat Management Plan.
8f. For all activities identified in 8c., describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody.
No fill shall be placed in the waterbody.
8g. For all excavating or dredging activities identified in 8c., describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. hel
No dredging will be done in this project. Any natural substrate excavated during construction shall be
used to feed the beach (as per the HPA provisions), providing it is not clay, which will be removed from
the site.
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project.
9a. If you have already worked with any government agencies on this project, list them below. [
Agency Name Contact Name Phone Most Recent
Date of Contact
Mason County ( )
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 on the Washington Department of
Ecology's 303(d) List? hel
• If yes, list the parameter(s) below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
Mt. w.ecy.wa.gov/progra 3d/.
X❑ Yes ❑ No
Dissolved oxygen and fecal coliform
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? hel
• Go to http://cfpub.epa.gov/surf/locateAndex.cfm to help identify the HUC.
17110018
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? hel
• Go to http://www.ecy.wa.gov/services/qis/maps/wria/wria.htm to find the WRIA#.
WRIA 14
JARPA 2009 Page 8 of 12
i
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? LhelM
• Go to http://www.ecy.wa.gov/programs/wq/swgs/criteria.htmi for the standards.
X❑ Yes ❑ No ❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? [help]
• If you don't know, contact the local planning department.
• For more information, go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html.
X❑ Rural ❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? [hei
• Go to http://www.dnr wa gov/BusinessPermitsfTopics/ForestPracticesApplications/Pages/fp watertyping.aspx for the Forest
Practices Water Typing System.
X❑ S ❑ F ❑ Np ❑ Ns
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? [
• If no, provide the name of the manual your project is designed to meet.
X❑ Yes ❑ No
Name of manual:
9i. If you know what the property was used for in the past, describe below. heI
Residential.
9j. Has a cultural resource (archaeological) survey been performed on the project area? [`iel
• If yes, attach it to your JARPA package.
❑ Yes X❑ No
9k. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. hei
The Chinook salmon, the Hood Canal summer-run chum, the bull trout, the Puget Sound
steelhead, the killer whale, the leatherback turtle, the humpback whale, the marbled
murrelet, and the Steller sea lion are the ESA listed threatened or endangered species in
the area.
91. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. Lne
Marine shoreline. See above, plus fall-run chum, coho, cutthroat trout, sand lance, and surf smelt.
JARPA 2009 Page 9 of 12
Part 10—Identify the Permits You Are Applying For
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at httpi//apps.ecy.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or help(d_),ora.wa.gov.
10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) [hel
• For more information about SEPA, go to www.ecy.wa.gov/programs/sea/sepa/e-review.html.
X❑ A copy of the SEPA determination or letter of exemption is included with this application.
❑ A SEPA determination is pending with _Mason County (lead agency). The expected
decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.)
• Submit the Fish Habitat Enhancement Project form with this application. The form can be found at
http://www.epermitting.wa.gov/Portals/ JarpaResourceCenter/images/default/fishenhancement.doc.
❑ This project is exempt (choose type of exemption below).
X❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
WAC 173-27-040 2. c.
❑ Other:
❑ SEPA is pre-empted by federal law. hel
10b. Indicate the permits you are applying for. (Check all that apply.) h[ elpl
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
X❑ Shoreline Exemption Type (explain):
Other city/county permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
X❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
Washington Department of Natural Resources:
❑ Aquatic Resources Use Authorization
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
JARPA 2009 Page 10 of 12
I�
Apr 30 3'S 63: 44p p. 1
FROM :SCHALRIBLRG FAX 1U. :2 53-$84-5776 G; r, 27 2136- B4:03FM P1
S�eras roqut►7e •onebF!�4 page
kP', i tasy tir�•r -•• +1 i.�:•-. - • - J .�r• x
F.r�.• "i'�"� YiiYY�- .. f- r L� t t•�•r!"s�h ,..,-.'1•slr•^'I-X�,:-
�3iT�4i Ct�1`} 11i1J41�'1 N>i.616
- c + .. .•.. -. .' st�F I'1 iy,��•� 's+J'�oft,.+s r,
P*t,�.Eb6t+
• .+r s'�r� � � s
Syr if-tift' �j. Ise
€wr�!, ra ibWwl•i�v�s'IFis� a 1tr6 tlxt Qir :!1 y ry� t tt�e
t+e�:ict1 iw�r��lrcrjdi�� �eNlil}• '
�r
c r j c3' tit t,x ,
+ J:. .-� a w,tK •F t � 1' J- :�,t' �1i��j#, t!�'}� -
� .:•r ,^ •t is � � �', 't .r��� ��t'�siiY�e.'�e Alt-.�i I r ..
' '!` c• .yy_ ;l�. eau
h yN ?
'''"'„YYYYYY.•�`� t I�}
t�i•U><f �.t�1b?1�Oi�9�'1�•�0101Ng@:8T1� ft�{7ti111db��.�t'�'
and SC ,i �{�tldfKy fn talry out l�e�8czspo �dEac ldc 8111 �` MAIM WWR
W11�a 8 [8� issued
rU --✓ f}" 'T : ram, '
s i f •ri
• ..• ' �.i;:� :• �,. �'��: � , a f- <t#��5r.��}�• +��':}fir+..
4te. F"fsj r'.yr Gwi1 r.$rq Mal 1. lFF1ot?PgMC M} t�+e�ri1
1/.0i01�s 11tr iii�Lt►I.M
`T {�'M� �t 4 � •I t.V�IrGy��PRo.MWF. Y{��1�7t7r� -R7Sa�• � ,
1i11'��S e.ki
y
18 1 S:C "9c1 irr cannerr+if*k !Asti' ieSodicf
,�'
r��ramie ,■,,,,;,,�ry.,R.,�:�+._w.��c�;�,�; --.::.:,:•-.......:.,..,:..:•;.�.•�::,,�4 .•:,. �r+e is � �ew �iilnat at
repriieiara'tn�iois!ori�ii, d1w�iepocdo�arilen!tlaio�pp'mhein�oanliis�€att►fICM�'1ip�iR;+ f� r!'++ie o
r;ili�7tiPiarimpriooiaednot moeritmstmst.rrlrr�l
w� gal*wwane>tiiPaertiAURI
,1�!etTha(#ewrilai'a'R11Masgtiiyr tetw�A3; utwu
:�►c� t t::rs�rh.: !ry. P000,Mp r O�irllpyre>t+erlp 'a�se�rt
tea.!P mmt--a �
4ARF a ioii6 i� i7ar}41 d 12
PARCEL#322355202003 CROSS SECTION
SEC35-T22N-R031/ MM.
0.00 ACRES
BULKHEAD SHALL BE CONSTRUCTED
OF LARGE ANGULAR ROCK ALONG APPROX.
110 TO 120 LINEAL FEET OF FRONTAGE
LANDWARD OF THE BANK TOE AND MHHW
QUARRY SPALLS AND FILTER FABRIC SHALL
BE USED BEHIND THE BULKHEAD. NON-NATIVE
I ROCK(RIP-RAP)THAT IS SCATTERED OVER THE
BEACH TO BE UTILIZED AS QUARRY SPALLS.
�I
6' MAX.ABOVE
GRADE HEIGHT
MHHW 11.80
H o o d C a n a l
7BASE
BEACH GRADE
7
1os CK SET BELOWFILTER FABRIC GRADE.
m iwanoh State Park
�o QUARRY SPALLS
0
2
EXISTING WOODY DEBRIS
ON BEACH TO REMAIN.
rncnHoaEsr ASPHALTAND CONCRETE
DEBRIS ON BEACH TO BE
REMOVED FROM THE SITE.
a
k �
VICINITY MAP MAP BY MICROSOFT
BULKHEAD PROPOSAL PROJECT NAME: ARCAND RESIDENCE NORTH DRAWING SCALE: NTS
FILE CS/ARCAND PROJECTADDRESS: PATTI ARCAND
BY KLS 40 E MERRIMOUNT DR �
DATE MfT
4-03-M UNION,WA98592-9639 ALLE DIMENSIONS ARFAPPROXIMATE
PARCEL#322355202003 CROSS SECTION
SEC35-T22N-R03W-W.M.
0.00 ACRES
BULKHEAD SHALL BE CONSTRUCTED
OF LARGE ANGULAR ROCK ALONG APPROX.
110 TO 120 LINEAL FEET OF FRONTAGE
LANDWARD OF THE BANK TOE AND MHHW
QUARRY SPALLS AND FILTER FABRIC SHALL
BE USED BEHIND THE BULKHEAD. NON—NATIVE
/ ROCK(RIP—RAP)THAT IS SCATTERED OVER THE
BEACH TO BE UTILIZED AS QUARRY SPALLS.
0 0
0 0 o a
&MAX.ABOVE
GRADE HEIGHT
MHHW 11.80
H o o d C r n 41
,es
18"MIN. BEACH GRADE
BASE ROCK SET BELOW
FILTER FABRIC BEACH GRADE.
Twmwh State Pal k
QUARRY SPALLS
OR
r
20
EXISTING WOODY DEBRIS
s ON BEACH TO REMAIN.
ARCAND RESIDENCE N^ ASPHALT AND CONCRETE
DEBRIS ON BEACH TO BE
REMOVED FROM THE SITE.
�0
E �
VICINITY MAP MAP BY MICROSOFT
BULKHEAD PROPOSAL PROJECT NAME: ARCAND RESIDENCE NORTH DRAIMNGSCALE: NITS
i
FILE. C&ARCAND PROJECTADDRESS: PATTI ARCAND
BY KLS 40 E MERRIMOUNT DR
DATE:4 0 UNION,WA 98592-9639 �
ALL SITE aMEr,sloNs ARE a,PaRoMwTE i