HomeMy WebLinkAboutSPI2007-00151 - SPI Inspections - 9/26/2008 °N.STA MASON COUNTY
A P� O °N DEPARTMENT OF COMMUNITY DEVELOPMENT
o
> s N Planning Division
o Y ti P O Box 279, Shelton,WA 98584
(360)427-9670
1864
Site Inspection
September 26, 2008
TO BE KEPT IN THE
DAVID BAYLEY PO BOX 278 PARCEL FILE
SHELTON WA 98584 A 1/( ^/- 2� /// 00 f///_6 V V
Case No.: SP12007-00151
Parcel No.: 322353200030
Project Description: Site review for addition and bulkhead repair.
Dear Applicant
Pursuant to your application, a site pre-inspection (SPI)was performed on your property. Below you
will find comments made regarding the proposed development and its critical values.
In some cases, setbacks for development from shorelines, steep slopes, streams, and wetlands must
be included in your specific proposal; these setbacks are included as part of the comments listed
below.
This information is based on County and State regulations as they exist to date. These regulations
may change and may affect the requirements for development of the subject property.
Please contact me at(360) 427-9670,ext. 365 if you have questions.
Sincerely,
Allan Borden
Land Use Planner
Mason County Planning Department
9/26/2008 1 of 4 SP12007-00151
Site Inspection
9/26/2008 Case No.: SP12007-00151
Comments:
Inspection for the David Bayley on July 3, 2007:
[Parcel Numbers 32235-32-00030] Lot Description: The property
is along State Route 106 on the Hood Canal shoreline and is 150
feet wide and 40 feet deep north of the road. The property has 10
to 12 percent slope near the highway and then is sloped to a 5
foot high bank at the saltwater. The site has an existing small
residence and garage and a concrete bulkhead at north and west
side projecting onto the beach compared to the properties to the
west; septic system is on the parcel to the east adjacent to the
state highway. The applicant wishes to add a second floor to
enlarge the residence and to repair and/or re-establish a marine
rail system to the west of this cabin, if each meets the needed
setbacks or special studies. These findings state regulations in
effect at the time of inspection, unless noted otherwise.
Development Regulations standards:
_Y_ The site is in Rural Residential 5 zone. Standard building
setbacks are 25-foot front yard setback, and 20-foot side property
line and rear yard setbacks. These setbacks are measured from
structures above grade such as roof overhangs, stairs, balconies,
decks, heat pumps, storage buildings, and fuel tanks.
_Y_ An administrative variance may be requested, to reduce
these setback distances from property lines, to as low as 5 feet or
10 feet (front yard), if the size, shape, or features of the property
constrain development from the proper setbacks. This process
requires application and review at the time of the building permit
submittal.
Resource Ordinance Standards:
_N_ Slope or Landslide hazards: Slopes greater than 15 percent
adjacent to or within 300 feet of a proposed project were
observed. The applicant shall have a qualified geologist or
engineering geologist visit the subject parcels and prepare a site
analysis to determine whether a geologic special report is needed
during development review.
_Y_ Slope or Landslide hazards: If the geologist confirms the
need for a special report when slopes are between 15 and 40
percent, a Geologic Assessment would be needed to address
slope stability, site conditions, and the other requirements of the
enclosed landslide hazard chapter 17.01.100 section E. 4. as
required by the Mason County Resource Ordinance. The report
9/26/2008 2 of 4 SP12007-00151
Site Inspection
9/26/2008 Case No.: SP12007-00151
must include all Resource Ordinance requirements and a
submittal checklist noting where these requirements are found in
the study document.
_Y_ Slope or Landslide hazards: The prepared special report
shall be specific to proposed site development on the subject
parcel by addressing clearing, grading, driveway and building
location, retaining walls, and stormwater control. This special
report would be submitted and evaluated at the time of building
permit submittal. The study shall address the presence of the
septic system on site stability conditions.
Y_ Shoreline setbacks: The shoreline designation for the area
is Urban Environment per the Mason County Shoreline Master
Program and setbacks would be determined by the Mason County
Resource Ordinance. The shoreline setback is determined by
measuring the average distance from the saltwater ordinary high
water mark (OHWM) to the roofline of adjacent neighboring
residences to the east and west of the subject property,
measuring the roof projection closest to the shoreline. Any
portion of the new structure, including decks, balconies, and
rooflines, must be behind this common line. Landward of this line
for 15 feet toward the shoreline is an area that may be used for
lawns, patios or landscaping (development at grade level). From
that point toward the shoreline is considered to be a required
vegetated buffer and is regulated by the Mason County Resource
Ordinance Fish and Wildlife Habitat Conservation Areas Chapter.
Within this chapter are those activities listed that can be done
both with and without a Mason Environmental Permit.
This inspection was to examine a proposed addition to the
existing residence and marine rail repair. At the inspection, the
setbacks of the residence were not measured in order to
determine whether the expansion of the structure is allowed, but
the standards to use in proposing an expansion can be stated.
The Resource Ordinance will not permit expansion of the existing
structure footprint towards the water if the proposed new structure
is less than 35 feet from the saltwater OHWM (equal to the
minimum shoreline setback). In addition, a second floor addition
to an existing building area is not permit closer than 15 feet from
the saltwater OHWM (shoreline management plan standard).
With this residence projecting towards the beach, you will need to
determine how much area of the existing footprint is available to
expand upon prior to designing a possible addition to this small
residence. You will also have to be sure that any expansion to the
south does not encroach any closer to the state highway
easement or does maintain a 10-foot road setback from that
9/26/2008 3 of 4 SP12007-00151
i
i
Site Inspection
9/26/2008 Case No.: SP12007-00151
easement. Replacing a demolished marine rail requires evidence
of its existence in the last two years, or a new rail system will need
shoreline permit review; repair of an existing rail alignment may be
reviewed through a building permit, environmental review, and a
state hydraulic project permit.
_N_ Wetland critical area: Planning staff confirmed that the
parcel does not contain certain wetlands, which are regulated
under Mason County's Wetlands chapter 17.01.070 of the Mason
County Resource Ordinance. The applicant will not need a
wetlands special report during development review.
_N_ Stream setbacks: Stream critical areas (recognized by
state, county, or tribal agencies) were not observed during the
inspection. The development setbacks from these features would
not apply to a proposed improvement on the subject parcel. The
seasonal runoff associated with the slopes and seepage located
off-site can be addressed as a complete development proposal is
presented.
You would need to confirm with the Health Department what their
septic system standards are to make sure about the adequacy of
supplying a septic system and drainfield area(s).
General process: Future site development must include a site
plan, showing all setbacks from property lines, shoreline, slopes,
and existing and proposed improvements; this site plan will be
needed for building permit review.
Specific County Code standards for future development may be
found at the County website address http://www.co.mason.wa.us.
If you have any questions please feel free to call. Thank you.
9/26/2008 4 of 4 SP12007-00151
Ta
MASON COUNTY
PLANNING DEPT. PRE-INSPECTION APPLICATION
PLEASE PRMT $225.00 Fee Required�tN�
1. Owner: 1995 Bayley Limited Partnership Applicant:David Bayley
Site Address8791 State Rte 106, Union WA 98592 Applicant Address: PO Box 278
Owner Address:PO Box 278 City: Shelton St WAp 98584
City:Shelton Sc WA Zip 98584 Phone:( ) same as owner day
Phone:(360 ) 490-2492 day
Phone:(36�943-9020 evening Planner: _
Email Address: bayleyd@hctc.com SW AIM .,&qcpp.Pan f ypeofUseWater Body
2. Parcel No. 32235 _ 32 _00030(little house)
Parcel No. 32335 . 32 -00010(big house)
Legal Description: Portion of Governement Lot 4, Section 33,Township 22 North, Range 3 West,W.M., lying Northerly
of State Route No. 106. See attached Exhibit A for complete legal description(covers both parcels).
3. Purpose of Pre-Inspection:See Attached Exhibit B
4. Use of building: The"little house"is used for temporary"overnights"and storage of a ski boat and 2 rowboats.The"big
house"is used as a single family residence,which can be used on a permanent basis.
5. Do any of the following exist on or adjacent to property?: slope(X) saltwater(X) lake( } river }
pond( ) wetland( ) seasonal runoff( ) other( ) stream( ) seasonal creek( }
Directions to Site: From the Mason Cnty Court House go left onto Olympic Hwy N up the hill to North 13th St; turn right onto 14.
13th St and continue along 13th St which after a few miles becomes McCreavy Rd; continue on McCreavy for about 12 miles;go
down the hill past the Mason County Landfill Station until you reach the intersection where the Texaco gas station is located;turn
right at the Texaco station onto Dalby Road and go about 1.5 miles until you come to State Route 106 and the store called the
"Cameo"; then turn ri ht on to State Route 106. Head East toward Belfair, past Alderbrook Resort and Shafer's Castle and pas a
recently logged off hillside on the right and ancontinue for about 0.5 miles to light green Mouse on the left of a curve that turns tot e
right.The light green house is the "little house"and you are there.
If the information is incomplete, then Mason County must disclaim any errors resulting from deficiencies in the original
application. Prc-inspection reports remain valid only until development changes occur in the vicinity which affect the lot
evaluated in this inspection,or the laws regulating development o)the site change after the time of inspection.
Applicant Signature: eil ate: f. Z-00
If you would like to he on.site during inspection,please check here: � }
Return application to: Department of Community Development, Planning Division
P.O. Box 186
Shelton, WA 98584
(360) 427-9670
Please include a$225.00 check or money order payable to Mason County Treasurer
When completed, this form becomes part of the parcel file.
FOR OFFICE USE ONLY: Accepted by: Date:
MORE ON BACK SIDE
Revised: 02/2M7
6 r I'
#wn
- r l € P
ij. (615
EXHIBIT "B"
Purpose of Pre-Inspection: The owners would like to do the following:
a) Remodel the little house by putting a bedroom upstairs where the garage
is now located, which may be accomplished by using the existing
footprint of the 2nd floor, or expand it Northerly to the cement bulkhead
to include the same square living space as the first floor. The "little
house" would remain a one (1) bedroom house, with expanded kitchen
and bathroom facilities. Upstairs would provide a more private area for
sleeping and storing personal effects. The "little house" shares the septic
drainfield that is behind (South) of the "big house". Effluent from the
"little house" is pumped Easterly through a sewerline to this septic
drainfield.
b) Consider enclosing the cement porch area adjoining the "little house" on
the East and make it into a small living room, adding about 120 square
of living space feet;
c) 1) Repair/rebuilding of a rail system, which would be used to launch
a ski boat. This two (2) track rail system was installed in the
1930s, with about 100 feet of track laid on the beach, which
extended into a boat house ("little house") where the height of the
pilings at the boat house reached approximate 6 feet. Over the
years, the winds, waves and storms battered the pilings, which
eventually were deteriorated. A similar rail system exists, but is
not operable, on property located to the East of the "big house".
2) The rails were relocated in 1962 about 15 feet to the West. In
1962 no pilings were used,just cement foundations with the boat
located beyond high tide line along side the "little house". Over
the years, the wind and waves again twisted the rails loose from
their cement foundations, scattering the rails on the beach. The
cement footings remained. This rail system used a carriage that
held an 18 foot ski boat that would be stored during the summer
months above high tide. When used, the carriage was lowered
with a hand winch down the rails about 100 to 120 feet for
launching; extreme low tide is about 150 feet out.
3) This repair/rebuild would involve installing an 8 feet high by 10
foot long cement retaining wall perpendicular to the West wall of
the "little house", installation of an electrical winch, replacement
of the railroad tracks and the building of a new boat carriage. The
cement foundations installed in 1962 would continue to be used for
rail support. Note that the West property line is approximately 65
feet West of the West wall of the "little house".
d) The new placement of a wood and Styrofoam float approximately 8 feet
wide by 10 feet long (to be built in 2 sections) which would be anchored
in the summer time between the two houses and about 80 feet down the
beach; this float would be tied off and placed on the shore during the
winter months;
e) Expansion of the 2nd floor of the "little house" by 20 feet on the West to
allow for a replacement garage for boat and general storage;
f) Expansion of the covered porch attached to the "big house" (the covered
porch is approximately 8 feet wide by 16 feet long).This porch is
attached to the Westerly portion of the "big house". The plan is to
expand this porch Westerly over the existing grass area (about 120
square feet), which is behind a "cement sandbag" bulkhead, which was
built in the 1930s. This area would be used for outside activities when it
is raining and windy;
Increase the height of the existing "cement sandbag bulkhead" which
protects the "big house" from high tides and storms. It is evident that
waves, being pushed by high winds, have overflowed the top of this
bulkhead allowing dirt and gravel from behind the bulkhead to wash
away, which, if allowed to continue, would weaken the integrity of the
structure of the bulkhead and place the "big house" at substantial risk;