HomeMy WebLinkAboutBLD2005-01522 Storage - BLD Permit / Conditions - 9/21/2005 Inspection Line(360)127-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Ir Shelton, WA 98584
flo
RESIDENTIAL BUILDING PERMIT BLD2005-01522
OWNER: HENRY BIERNACKI RECEIVED: 8/30/2005
CONTRACTOR: LICENSE: EXP: ISSUED: 9/21/2005
SITE ADDRESS: 8820 E STATE ROUTE 106 UNION EXPIRES: 3/21/2006
PARCEL NUMBER: 322353200021
LEGAL DESCRIPTION: TR 2 OF LOT 4 S OF R/W
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
STORAGE 12X20 HIGHWAY 106, HOME IS 9/10 OF A MILE PAST MILE MARKER 8 ON RIGHT
HAND SIDE
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.: VB
Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: U Lot Size: Deck:
Type of Work: ACC Fire Dist.: 6 No.of Stories: 1 Occ. Load: Building: None 0
Valuation: Building Height: 12 Occ. Status: Primary Basement: STOFW(�aFe 240
Manufactured Home Information Setback Information Shoreline&Planning Inform
Make: Length: Ft. Front: N 190.0 Ft. Shoreline: Ft. Water Body:
Rear: S 200.0 Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. Side 1: W 25.0 Ft. Shoreline Desig.: Not Applicable
Year: Serial No.: Side 2: E 143.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures FEES
Mechanical Fixtures
Type Qty. Type a By Date Amount Receipt
Plan Check Fee KS 8/30/2005 $81.41 S12005
Planning Review Fee KS 8/30/2005 $155.00 S12005
EH Plan Review CEW 9/10/2005 $35.00 S22005
Building State Fee ARC 9/12/2005 $4.50 S22005
Building Permit Fee ARC 9/12/2005 $125.25 S22005
Total $401.16
BLD2005-01522 Please referto the following pages for conditions of this permit. 1 of 4
CASE NOTES FOR
BLD2005-01522
CONDITIONS FOR
BLD2005-01522
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-098�a person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) The internatioanl code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
X
3) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X i
4) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department prior to any further inspections being performed or approvals granted.
X
5) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads,"all new structures that
require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the
access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background.
Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted
by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting
inspections.
X L!/
6) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
BLD2005-01522 Please refer to the following pages for conditions of this permit. 2 of 4
7) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
permit shall be applied for, reviewed and approved prior to the change.
X
8) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X '-
9) The"approved"site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
X
10) Concrete used for basement walls,foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X
11) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the
international codes and Mason County Regulations unless a"Change of Use" permit is applied for, reviewed and approved.
X —�
12) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
13) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project.
X
14) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
15) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall made prior to requesting additional inspections.
BLD2005-01522 Please referto the following pages for conditions of this permit. 3 of 4
16) All property lines shall be clearly identified at the time of foundation inspection. X `
17) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County o antes and building regulations.
18) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
X
19) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and fl s ing. Install metal connectors approved for contact with the new types of pressure treated material.
X
20) Water quality Rs nqt to be degraded to the detriment of the aquatic environment as a result of this project.
X _�
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.Proof of continuation of
work is by means of a progress inspection.The owneror the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to
the above described property and !tructure fgc review and inspection.
OWN ER OR AGENT: i; �, �� DATE:
BLD2005-01522 Please refer to the following pages for conditions of this permit. 4 of 4
W
o CONCRETE MECHANICAL MANUFACTURED HOME
0
Footings I Setbacks Date By Ribbons
Date By Gas Piping
� Date By
rNv Foundation Wails Date By Set-up
Date By INSULATION Date By
BG 1 Slob insulation Floors FINAL INSPECTION
Date By Date By Date By
FRAMING Walls FIRE DEPARTMENT
Date By Date By Date By
PLUMBING Attic OTHER
G roundvvork Date By
Date By WALLBOARD NAILING
Date By
tl.W.V M $'
Date Bye t,. *ak x
Water Line
FINAL INSPECTION
Date By lame Date By
m
Type of Insp. Pass/Fail Request Date inspect. Date Dona By Comments
CD
v
CD
Cn
�Jv� I Ifl o� /0 7 _ oro 00
8 o z
a o D
01
x
o
0
m
z
CD
0
MASON COUNTY PERMIT NO�
BUILDING PERMIT APPLICATION `
426 W. Cedar• P.O. Box 186, Shelton, WA 98584 +
Shelton (360) 427-9670 • Beffair (360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner Company Name
Mailing Address - t Mailing Address
City Eft ,o Y, State kJa..Zip Code �-q -5s_23 City State Zip Code
Phone 2l0 X78� Other Ph. _r .r, Phone Other Ph.
Lien/Title Holder -- ? Contractor Reg. Exp.
E mail address �,,+�� r A c jr . e-el r t E Mail Address
Drivers Lic.# DOB Drivers Lic.# DOB
SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic
Connect to Water System Name of Water System
Well Sewer System Name of Sewer System
PARCEL INFORMATION - 12 Digit Parcel No. Fire District
Legal Description
Site Address (Please include street nagie, street number and city) j6,6 el
Directions to site _
Will timber be cut and sold in parcel preparation?Yes( o
Is property within 200' of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No
TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE ❑ SEASONAL ❑
Use of Building escribe Work -2,0-k' / - ~"j ti�-r
No. of Bedrooms_ �" No. f Bathrooms �--�- Square Footage- 1st Floor a q 12 2nd Floor
3rd Floor Basement Deck Covered Deck Other Sq. ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price $ Replacement Unit? Yes/ No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representstivg,_g(A4-Gamtr her declare
that I am entitled to receive this permit and to do the work as proposed in the application. I declare that,11 6v tail d fhb: , ssion from all
the necessary parties. If permission is required from any easement holder or any other party in intere Zr g is application or the work
proposed in the application, I have obtained permission from them to apply for this permit and conduct the k,prp he owner or
agent on owners behalf, represents that the information provided is accurate and grants employees of Mas�dMM Cyy to the above
described property and structure for review and inspection. This permit/application becomes null &void if work or authorized QQ9qstruction is
not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF
���(�IIDWI� WORK IS BY
MEANS OFAPROGRESS INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WIL T THEAPPLICATION.
Date:
_T wner Owners Representative/Contractor (indicate which one)
FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Planning Department
Environmental Health Department
Fire Marshal
FEES
Building Permit Fee 2 - Site Inspection
Plan Review Fee EH Review Fee
Plumbinq & Base Fee PlanningReview Fee
Mechanical & Base fee Other
Wood /Gas/ Pellet Stove Fee State Fee
Violation Fee Alp EjV Ir- Pre-Paid at Submittal
Valuation $ 8 , 0`�— TOTAL FEES