Loading...
HomeMy WebLinkAboutBLD2007-01346 SFR - BLD Permit / Conditions - 9/13/2007 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Ir Shelton, WA 98584 flo RESIDENTIAL BUILDING PERMIT BLD2007-01346 OWNER: DAVID DEW RECEIVED: 7/26/2007 CONTRACTOR: CW CONSTRUCTION (360) 789-4873 LICENSE: CWCONI"031K4 EXP: 5/15/2008 ISSUED: 9/13/2007 SITE ADDRESS: 8940 E STATE ROUTE 106 UNION EXPIRES: 3/13/2008 PARCEL NUMBER: 322353100240 LEGAL DESCRIPTION: E 75' OF W 125' GOVT LOT 3 S OF HIWAY& E 15' OF W 125' N OF HIWAY&T/L PROJECT DESCRIPTION: DIRECTIONS TO SITE: NEW SFR APPROX 3 MILES EAST OF ALDERBROOK ON HWY 106. NOT ON WATER SIDE. ADDRESS 8940 E HWY 106 General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 1 Type of Constr.: V-B Type of Use: SF Insp.Area: No. of Bathrooms: 2 Occ. Group: R-3 U-1 Lot Size: Deck: Type of Work: NEW Fire Dist.: 6 No. of Stories: 2 Occ. Load: Building:1,552 Garage-Attached 672 Valuation: Building Height: 26 Occ. Status: Basement: cov deck 209 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: N 48.0 Ft. Shoreline: 200.0 Ft. Water Body: none Rear: S 214.0 Ft. Slope: Ft. SEPA?: Unkn Model: Width: Ft. Side 1: E 5.0 Ft. Shoreline Desig.: bWtlApplicable Year: Serial No.: Side 2: W 21.0 Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 1 Exhaust Hood 1 Plan Check Fee KS 7/26/2007 $769.70 S12007000 Hosebibs 2 Furnace<100K 1 Planning Review Fee KS 7/26/2007 $170.00 S12007000 Kitchen Sink 1 Ventilation Fan 2 EH Plan Review TW 8/7/2007 $75.00 S12007000 Lavatories 2 Dryer Vent 1 Building State Fee RTB 8/30/2007 $4.50 sizbbiboo Water Closets (Toilets) 2 Building Permit Fee RTB 8/30/2007 $1,189.75 S12007000 Water Heaters 1 Mechanical Fee RTB 8/30/2007 $52.00 512007000 Bath Tubs 1 Mechanical Base Fee RTB 8/30/2007 $25.30 S12007000 Clothes Washer 1 Plumbing Fee RTB 8/30/2007 $74.80 S12007000 Plumbing Base Fee RTB 8/30/2007 $22.00 S12007000 Geotechnical Asses. Report BKD 9/5/2007 $240.00 S12007000 Total $2,623.05 BLD2007-01346 Please referto the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR BLD2007-01346 CONDITIONS FOR BLD2007-01346 1) A WAIVER WAS APPROVED TO REDUCE SETBACK BETWEEN DRAINFIELD AND WELL THE FOLLOWING CONDITIONS ARE REQUIRED. 1. Annual nitrate testing 2. Quarterly bacteriological analyses 3. Nos iz required along roadway. X . 2) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X 3) All other necessary permits from Mason County, Washington State and/or Federal Agencies tha �re r uired for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X 4) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800 J ti82. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 5) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be grant": In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Depa nt p for to any further inspections being performed or approvals granted. X 6) Own-A t�s responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 7) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official The per "t holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or rerr12 f a r d documents will result in failure of required building inspections. X 8) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X �Y•w BLD2007-01346 Please referto the following pages for conditions of this permit. 2 of 5 9) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" site plan is not on site, then approval will t be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Build' D,e ment prior to any further inspections being performed or approvals granted. X " lI 10) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab Insulation R-10. Exception: R- insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the underiQ of a oof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation. X , (,{/ 11) Concrete used for basement walls, foundation walls, exterior walls, ar ort slabs, steps exposed to the weather, garage floor slabs and other vertical con r//ete,, rk exposed to the weather shall have a um compressive stre 6-ps+{ Iab1eB4II XJ 00 ure is imi - e s, an a ncu uray other tise well e oun y egu a ions unless a"Change of Use" permit is applied or, roved. X 13) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Wash gton. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in perttjo& n. X 14) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located wit"25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. ()(,,t Jf X 15) All chan es to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinan qr f/e ation, must be reviewed and approved by Mason County prior to construction. X GLJ BLD2007-01346 Please refer to the following pages for conditions of this permit. 3 of 5 16) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the internati al codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspetrom ade prior to requesting additional inspections. X n l J 17) All property lines shall be clearly identified at the time of foundation inspection. X 18) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a fi al inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Maso n ordinances and building regulations. X 19) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period of exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder ha prely ed action from being taken. No more than one extension may be granted. X (i(� 20) Pressure treated wqtqd manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors]qnq f ing. etal connectors approved for contact with the new types of pressure treated material. X ,(J( (yl 21) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these struefures t the setback conditions listed. X 22) Landings apd stair must meet the same setback conditions as any permitted structure, and, must be shown on your site plan. Please check your "Approvei :_I$7'to ensure these structures are shown and meet the setback conditions listed. X � (K 23) The proposed project must be consistenVWi h ill icable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline Master Program.X � . J(_ 24) Work pe do i the dry to hel ent disturbance of unstable soil layers and uncontrollable mass wasting. X e(,u. 25) Temporary erospq control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be install i ar at would discharge construction stormwater to surface water and maintained until upland vegetation has become established. X 26) PlacednX pf►str c re must comply with standards set forth per the international codes regarding descending and/or ascending slopes. X '(�/ (,(J BLD2007-01346 Please referto the following pages for conditions of this permit. 4 of 5 27) The approval of this project is subject to the recommendations and specifications outline n the attached geotechnical report or assessment. Structures and/or land modifications (grading, cuts, fills, etc.) required in the geotechnical report)/ sessment, may require a seperate permit. The geotechincal report/assessment shall remain attached to the approved building plans. X , l - 28) This#T, i o ated in a smoke management zone. Please contact a fire warden at(360)427-9670 ext. 459 for further information. X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property a structure f r view and inspection. OWNERORAGENT. DATE: D BLD2007-01346 Please refer to the following pages for conditions of this permit. 5 of 5 o CONCRETE MECHANICAL MANUFACTURED HOME m Date By of Footings J Setbacks Gas Piping Ribbons v o Interior Date\ By,—,O� Interior-Date By Date By D Exterw DateJ) By Exterior-Date By Set-up rn Point Load/Isolated Footings INSULATION - Date By 0 Date By Data SLAB INSULATION By FIRE DEPARTMENT Foundation Walls Floors k c v Date By Date By Data By DECKS FRAMING Walls Date By Date I I/3 6�' By , Data ory By PROPANE TANKS PLUMBING vautt Data .By Date °Y - OTHER Groundwork Attic Type-5�w­rw- 9,,-, Date By Date By Date ByL�1v DRYWALL 3�2K(lU D.W.V Type: Date It 13 D� By Int.Brace Wall Date By Date q 0 By l FINAL INSPECTION 0 n i Water LineL Fire Separation 4 C Date By Date By Date ! Z Q By / O CD V `° Pans or Request Inspect. o Type of Insp. n Fail Date Date Done By Comments C4 CD EP a�� P`'s 5 to z3 vz (0 ZS cri i:.r41C 0 7 N / -1,�/ �i uL l�iiCL 1 ram• t "I- Pi,1�"1 (0 Il V y r�.lr�X z s 61s o OVA iA 1 1!I a�J Qetu.( 3 v.ef p CD LAP- ��� rye to�� A lLe' ti5 off. LA& ro,.- L u o w y 6� a--01 t t�G t yz I r n MASON COUNTY PERMIT NO�DW - BUILDING PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner A t E" Company Name CW t7 ritns4ru c�tolJ + Sa tC.. Mailing Address 1616 , :] Mailin Address ?.a. laox 1 52- City E State�_Zip Code City _ TpN State At Zip Code 98S Phone - ! 5-30�7 Other Ph.? -310J Phone 3(bQ-12(,t -5831Q Other POG o-78 -` Ie Lien/Title Holder QQNCH Contractor Reg. *oil K•t:-xp. E mail address d e W _,NI`-aN�CQM E Mail Address Drivers Lic. # L" WX G%! 'Ga3 EjBOB 7 Drivers Lic.#WEArVE"CL39g58DOB a j SEPTIC /WATER SYSTEM I FORMATION -'Connect to New Sep tic - Existing Septic Connect to ater System Name of Water System t7E W-s S WiS �187c)TV-3 Well Sewer System Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. 2- 5- Fire District Legal Description '� 12•� -r-�� Z 4V 4 Site Address (Please include street name, s reet number and city) WY O Directions o site W � ^ Q Will timber be cut and sold in parcel preparation?Yes/ o Is property within 200' of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/ o TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE RISEASONAL ❑ Use of Building escribe,yVork IGN'TtE autL"T AQME _ No. of Bedrooms No. of Bathrooms 1 2y Square Footage- 1st Floor 1180 2nd Floor �U7� 3rd Floor Basement Deck (9 7 Covered Deck Other Sq. ft. Garage Attached ✓� Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price$ Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or the contractor. I further declare that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 1 0 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS FAPROGRE INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF180 DAYS WI LINVALIDATETHEAPPLICATION. X Date: 7 267 Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date DEPARTMENTAL REVIEW APPROVE DENIED 11 NOT Building Department P oo,Planning Department Environmental Health Department Fire Marshal FEES Building Permit Fee Site Inspection Plan Review Fee 73• 3 EH Review Fee Plumbinq & Base Fee ?*0 Planning Review Fee i Mechanical & Base fee 30 Other Wood /Gas/ Pellet Stove Fee U State Fee ly, J-0 Violation Fee 0 0 7 Pre-Paid at Submittal Valuation $ TOTAL FEES MASON COUNTY PERMIT NO. PLUMBING/MECHANICAL PERMIT APPLICATION 426 W.Cedar• P.O. Box 186, Shelton,WA 98584 Shelton (360) 427-9670• Belfair(360) 275-4467• Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR I FORMATION Owner AV10 vi Company Name r-VIICnIJ6TQ L-Tt0Q MW c- Mailing Address(98 J 1 `y l g VG Mailin Address City E = -State UU l4 Zip Code C)8�!5 City �_L to IQ 'State- A Zip Code Phone"�' S 5 3U� a Other Ph.1O�-fl5� -3(04(o Phone 3lor-)-�f�.4-S83(o Other h. 6 - 3 Lien/Title Holder N+i Contractor Reg. P. E mail address Ew W,K 5 Q,CDW E Mail Address 1, CoM Drivers nSM606 '7 Drivers Lic.# C- L3 DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic: Connect to Sewer System Name of Sewer System PARCEL INFORMATIQN r 12 Di it Pprcel No. Fire Distr t Legal Description" T oWY I(Y.. Site Address (Please Pclude stre t name, s reet um er and cit ) Directip n t item O Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% �' TYPE OF JOB - New Add Alt Repair Other Use of Building _... Location of Fixtures/Units - 1 st Floor �d Floor ✓ Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Type of Fixture No. of Fixtures Fees Fuel Type:Electric V LPQ Natural Gas,_ Heat Pump_ Toilets _ — Type of Unit No. of Units Fees Bathroom Sink Furnace l Bath Tubs Heatpumps Showers Spot Vent Fan �i.. Water Heater —L_ Propane Tank Clothes Washer Gas Outlets Kithen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood 1 Hosebibs Dryer Vent 1 Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL 01MVER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF0 CONTINYA719N OF WORK IS BY MEANS OF A PROGRESS INSPECTION. X . �01 Date: 7 Z Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYONDTHIS POINT Accepted by: Planning Pd Ck# Date Bld Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group—Type Constr. Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Inspection Mechanical & Base fee UFC Plan Review Fee Wood/Gas/Pellet Stove Fee Other Violation Fee TOTAL FEES fop 0 Property continues up steep slope at approx 45 — ,`0 degrees to south property Forested hillside °fi� line 75'-0" - - - - - - -Base of Hill- - - - - - - - - - o 1 r .111 IF S-0"_ 25'-0" 24'-0" -7_9._O_ 1 0,_O. Proposed new c structure footprint i o Drain 4 N Field N i Resv , I Drain Field I 33'4" Driveway �n Wei 42'-0" L PROVED o MASON ONTY DCD PLANNING E � SITE PLA o REQUIRED TO BE ON SITE Uj CHANGES SUBJECT TO APPROVAL By --- Date I I i Dew Property State Highway 106 E.8940 Hwy 106,Union WA Tax Parcel#32235-31-00240 Site Plan N . ppdPlotPlan :�_:#EearPlp�Planf P 1 scale: 1"=15' /2007