HomeMy WebLinkAboutBLD2007-01346 SFR - BLD Permit / Conditions - 9/13/2007 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Ir Shelton, WA 98584
flo
RESIDENTIAL BUILDING PERMIT BLD2007-01346
OWNER: DAVID DEW RECEIVED: 7/26/2007
CONTRACTOR: CW CONSTRUCTION (360) 789-4873 LICENSE: CWCONI"031K4 EXP: 5/15/2008
ISSUED: 9/13/2007
SITE ADDRESS: 8940 E STATE ROUTE 106 UNION EXPIRES: 3/13/2008
PARCEL NUMBER: 322353100240
LEGAL DESCRIPTION: E 75' OF W 125' GOVT LOT 3 S OF HIWAY& E 15' OF W 125' N OF HIWAY&T/L
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
NEW SFR APPROX 3 MILES EAST OF ALDERBROOK ON HWY 106. NOT ON WATER
SIDE. ADDRESS 8940 E HWY 106
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: 1 Type of Constr.: V-B
Type of Use: SF Insp.Area: No. of Bathrooms: 2 Occ. Group: R-3 U-1 Lot Size: Deck:
Type of Work: NEW Fire Dist.: 6 No. of Stories: 2 Occ. Load: Building:1,552 Garage-Attached 672
Valuation: Building Height: 26 Occ. Status: Basement: cov deck 209
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: N 48.0 Ft. Shoreline: 200.0 Ft. Water Body: none
Rear: S 214.0 Ft. Slope: Ft. SEPA?: Unkn
Model: Width: Ft. Side 1: E 5.0 Ft. Shoreline Desig.: bWtlApplicable
Year: Serial No.: Side 2: W 21.0 Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Dishwasher 1 Exhaust Hood 1 Plan Check Fee KS 7/26/2007 $769.70 S12007000
Hosebibs 2 Furnace<100K 1 Planning Review Fee KS 7/26/2007 $170.00 S12007000
Kitchen Sink 1 Ventilation Fan 2 EH Plan Review TW 8/7/2007 $75.00 S12007000
Lavatories 2 Dryer Vent 1 Building State Fee RTB 8/30/2007 $4.50 sizbbiboo
Water Closets (Toilets) 2 Building Permit Fee RTB 8/30/2007 $1,189.75 S12007000
Water Heaters 1 Mechanical Fee RTB 8/30/2007 $52.00 512007000
Bath Tubs 1 Mechanical Base Fee RTB 8/30/2007 $25.30 S12007000
Clothes Washer 1 Plumbing Fee RTB 8/30/2007 $74.80 S12007000
Plumbing Base Fee RTB 8/30/2007 $22.00 S12007000
Geotechnical Asses. Report BKD 9/5/2007 $240.00 S12007000
Total $2,623.05
BLD2007-01346 Please referto the following pages for conditions of this permit. 1 of 5
CASE NOTES FOR
BLD2007-01346
CONDITIONS FOR
BLD2007-01346
1) A WAIVER WAS APPROVED TO REDUCE SETBACK BETWEEN DRAINFIELD AND WELL THE FOLLOWING CONDITIONS ARE REQUIRED.
1. Annual nitrate testing
2. Quarterly bacteriological analyses
3. Nos iz
required along roadway.
X .
2) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X
3) All other necessary permits from Mason County, Washington State and/or Federal Agencies tha �re r uired for this proposed development and
construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X
4) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800 J ti82. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
5) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be grant": In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Depa nt p for to any further inspections being performed or approvals granted.
X
6) Own-A t�s responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X
7) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official The per "t holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
rerr12 f a r d documents will result in failure of required building inspections.
X
8) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X �Y•w
BLD2007-01346 Please referto the following pages for conditions of this permit. 2 of 5
9) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" site plan is not on site, then
approval will t be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Build' D,e ment prior to any further inspections being performed or approvals granted.
X " lI
10) Washington State Energy Code Compliance has been approved using the following:
Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors
(Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab
Insulation R-10.
Exception: R- insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the
underiQ of a oof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation.
X , (,{/
11) Concrete used for basement walls, foundation walls, exterior walls, ar ort slabs, steps exposed to the weather, garage floor slabs and other
vertical con r//ete,, rk exposed to the weather shall have a um compressive stre 6-ps+{ Iab1eB4II
XJ
00
ure is imi - e s, an a ncu uray other tise well e
oun y egu a ions unless a"Change of Use" permit is applied or, roved.
X
13) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Wash gton. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
perttjo&
n.
X
14) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located wit"25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project. ()(,,t Jf
X
15) All chan es to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinan qr f/e ation, must be reviewed and approved by Mason County prior to construction.
X GLJ
BLD2007-01346 Please refer to the following pages for conditions of this permit. 3 of 5
16) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the internati al codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspetrom
ade prior to requesting additional inspections.
X n l J
17) All property lines shall be clearly identified at the time of foundation inspection. X
18) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a fi al inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Maso n ordinances and building regulations.
X
19) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period of exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder ha prely ed action from being taken. No more than one extension may be granted.
X (i(�
20) Pressure treated wqtqd manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors]qnq f ing. etal connectors approved for contact with the new types of pressure treated material.
X ,(J( (yl
21) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these struefures t the setback conditions listed.
X
22) Landings apd stair must meet the same setback conditions as any permitted structure, and, must be shown on your site plan. Please check your
"Approvei :_I$7'to ensure these structures are shown and meet the setback conditions listed.
X � (K
23) The proposed project must be consistenVWi h ill icable policies and other provisions of the Shoreline Management Act, its rules, and the Mason
County Shoreline Master Program.X � . J(_
24) Work pe do i the dry to hel ent disturbance of unstable soil layers and uncontrollable mass wasting.
X e(,u.
25) Temporary erospq control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be
install i ar at would discharge construction stormwater to surface water and maintained until upland vegetation has become established.
X
26) PlacednX pf►str c re must comply with standards set forth per the international codes regarding descending and/or ascending slopes.
X '(�/ (,(J
BLD2007-01346 Please referto the following pages for conditions of this permit. 4 of 5
27) The approval of this project is subject to the recommendations and specifications outline n the attached geotechnical report or assessment. Structures
and/or land modifications (grading, cuts, fills, etc.) required in the geotechnical report)/ sessment, may require a seperate permit. The geotechincal
report/assessment shall remain attached to the approved building plans. X , l -
28) This#T,
i o ated in a smoke management zone. Please contact a fire warden at(360)427-9670 ext. 459 for further information.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property a structure f r view and inspection.
OWNERORAGENT. DATE: D
BLD2007-01346 Please refer to the following pages for conditions of this permit. 5 of 5
o CONCRETE MECHANICAL MANUFACTURED HOME m
Date By
of Footings J Setbacks Gas Piping Ribbons v
o Interior Date\ By,—,O� Interior-Date By Date By D
Exterw DateJ) By Exterior-Date By Set-up
rn Point Load/Isolated Footings INSULATION - Date By 0
Date By Data SLAB INSULATION By FIRE DEPARTMENT
Foundation Walls Floors k c v Date By
Date By Data By DECKS
FRAMING Walls Date By
Date I I/3 6�' By ,
Data ory By PROPANE TANKS
PLUMBING vautt Data .By
Date °Y - OTHER
Groundwork Attic Type-5�wrw- 9,,-,
Date By Date By Date ByL�1v
DRYWALL 3�2K(lU
D.W.V Type:
Date It 13 D� By Int.Brace Wall Date By
Date q 0 By l FINAL INSPECTION 0
n i Water LineL Fire Separation 4 C
Date By Date By Date ! Z Q By / O
CD V
`° Pans or Request Inspect. o
Type of Insp. n Fail Date Date Done By Comments C4
CD
EP a�� P`'s 5 to z3 vz (0 ZS cri i:.r41C
0
7
N / -1,�/ �i uL l�iiCL 1 ram• t "I- Pi,1�"1
(0 Il V
y r�.lr�X z s 61s
o OVA iA 1 1!I
a�J Qetu.( 3 v.ef
p
CD
LAP-
��� rye to��
A lLe' ti5 off. LA& ro,.- L u
o w y 6� a--01 t t�G t yz I
r n
MASON COUNTY PERMIT NO�DW -
BUILDING PERMIT APPLICATION
426 W. Cedar• P.O. Box 186, Shelton, WA 98584
Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner A t E" Company Name CW t7 ritns4ru c�tolJ + Sa tC..
Mailing Address 1616 , :] Mailin Address ?.a. laox 1 52-
City E State�_Zip Code City _ TpN State At Zip Code 98S
Phone - ! 5-30�7 Other Ph.? -310J Phone 3(bQ-12(,t -5831Q Other POG o-78 -` Ie
Lien/Title Holder QQNCH Contractor Reg. *oil K•t:-xp.
E mail address d e W _,NI`-aN�CQM E Mail Address
Drivers Lic. # L" WX G%! 'Ga3 EjBOB 7 Drivers Lic.#WEArVE"CL39g58DOB a j
SEPTIC /WATER SYSTEM I FORMATION -'Connect to New Sep tic - Existing Septic
Connect to ater System Name of Water System t7E W-s S WiS �187c)TV-3
Well Sewer System Name of Sewer System
PARCEL INFORMATION - 12 Digit Parcel No. 2- 5- Fire District
Legal Description '� 12•� -r-�� Z 4V 4
Site Address (Please include street name, s reet number and city) WY O
Directions o site W � ^
Q
Will timber be cut and sold in parcel preparation?Yes/ o
Is property within 200' of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15%
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/ o
TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE RISEASONAL ❑
Use of Building escribe,yVork IGN'TtE autL"T AQME _
No. of Bedrooms No. of Bathrooms 1 2y Square Footage- 1st Floor 1180 2nd Floor �U7�
3rd Floor Basement Deck (9 7 Covered Deck Other Sq. ft.
Garage Attached ✓� Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price$ Replacement Unit? Yes/ No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or the contractor. I further declare
that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all
the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work
proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or
agent on owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above
described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is
not commenced within 1 0 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY
MEANS FAPROGRE INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF180 DAYS WI LINVALIDATETHEAPPLICATION.
X Date: 7 267
Owner/Owners Representative/Contractor (indicate which one)
FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date
DEPARTMENTAL REVIEW APPROVE DENIED 11 NOT
Building Department P
oo,Planning Department
Environmental Health Department
Fire Marshal
FEES
Building Permit Fee Site Inspection
Plan Review Fee 73• 3 EH Review Fee
Plumbinq & Base Fee ?*0 Planning Review Fee
i
Mechanical & Base fee 30 Other
Wood /Gas/ Pellet Stove Fee U State Fee ly, J-0
Violation Fee 0 0 7 Pre-Paid at Submittal
Valuation $ TOTAL FEES
MASON COUNTY PERMIT NO.
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W.Cedar• P.O. Box 186, Shelton,WA 98584
Shelton (360) 427-9670• Belfair(360) 275-4467• Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR I FORMATION
Owner AV10 vi Company Name r-VIICnIJ6TQ L-Tt0Q MW c-
Mailing Address(98 J 1 `y l g VG Mailin Address
City E = -State UU l4 Zip Code C)8�!5 City �_L to IQ 'State- A Zip Code
Phone"�' S 5 3U� a Other Ph.1O�-fl5� -3(04(o Phone 3lor-)-�f�.4-S83(o Other h. 6 - 3
Lien/Title Holder N+i Contractor Reg. P.
E mail address Ew W,K 5 Q,CDW E Mail Address 1, CoM
Drivers nSM606 '7 Drivers Lic.# C- L3 DOB
SEPTIC INFORMATION - Connect to New Septic Existing Septic: Connect to Sewer System
Name of Sewer System
PARCEL INFORMATIQN r 12 Di it Pprcel No. Fire Distr t
Legal Description" T oWY I(Y..
Site Address (Please Pclude stre t name, s reet um er and cit )
Directip n t item O
Is property within 200'of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% �'
TYPE OF JOB - New Add Alt Repair Other Use of Building _...
Location of Fixtures/Units - 1 st Floor �d Floor ✓ Basement Garage Closet
PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS
Type of Fixture No. of Fixtures Fees Fuel Type:Electric V LPQ Natural Gas,_ Heat Pump_
Toilets _ — Type of Unit No. of Units Fees
Bathroom Sink Furnace l
Bath Tubs Heatpumps
Showers Spot Vent Fan �i..
Water Heater —L_ Propane Tank
Clothes Washer Gas Outlets
Kithen Sinks Wood/Gas/Pellet Stove
Dishwasher Kitchen Exhaust Hood 1
Hosebibs Dryer Vent 1
Other Other
Base Fee Base Fee
TOTAL PLUMBING TOTAL MECHANICAL
01MVER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.
PROOF0 CONTINYA719N OF WORK IS BY MEANS OF A PROGRESS INSPECTION.
X . �01 Date: 7 Z
Owner/Owners Representative/Contractor (indicate which one)
FOR OFFICIAL USE BEYONDTHIS POINT
Accepted by: Planning Pd Ck# Date Bld Pd Receipt No.
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Occ Group—Type Constr.
Planning Department
Environmental Health Department
FEES
Plumbing & Base Fee Site Inspection
Mechanical & Base fee UFC Plan Review Fee
Wood/Gas/Pellet Stove Fee Other
Violation Fee TOTAL FEES
fop 0
Property continues up
steep slope at approx 45 —
,`0 degrees to south property
Forested hillside °fi� line
75'-0"
- - - - - - -Base of Hill- - - - - - - - -
-
o 1 r
.111
IF
S-0"_
25'-0" 24'-0"
-7_9._O_ 1 0,_O.
Proposed new c
structure footprint i o Drain
4 N Field
N
i
Resv ,
I Drain
Field
I
33'4"
Driveway �n Wei 42'-0"
L
PROVED o
MASON ONTY DCD PLANNING E
� SITE PLA o REQUIRED TO BE ON SITE Uj
CHANGES SUBJECT TO APPROVAL
By --- Date
I
I i
Dew Property
State Highway 106 E.8940 Hwy 106,Union WA
Tax Parcel#32235-31-00240
Site Plan
N . ppdPlotPlan :�_:#EearPlp�Planf P 1 scale: 1"=15' /2007