HomeMy WebLinkAboutBLD2014-00315 Replace Dock and Ramp - BLD Permit / Conditions - 6/5/2014 Inspection Line (360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County Bldg. III 426 W. Cedar P.O. Box 279
ir Shelton, WA 98584
f;4
RESIDENTIAL BUILDING PERMIT BLD2014-00315
OWNER: JAMES MATTHEIS RECEIVED: 4/3/2014
CONTRACTOR: LAKESHORE CONSTRUCTION 275-5029 LICENSE: LAKESC'155JA EXP: 4/4/2015 ISSUED: 6/5/2014
SITE ADDRESS: 9141 ESTATE ROUTE 106 UNION EXPIRES: 12/5/2014
PARCEL NUMBER: 322353100040
LEGAL DESCRIPTION: W 50' OF E 150' N HY&T.L. OF LOT 3
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
Replace existing joint-use dock and ramp structure: new 24 ft. long ramp HALF WAY BETWEEN TWANOH AND ALDERBROOK
attached to bulkhead; four 20 ft. long by 6 ft. wide floats; 92 feet total length
structure is secured by existing wooden piling.
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.:
Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: ACC Fire Dist.: 6 No. of Stories: Occ. Load: Building:
Valuation: $ 20,528.00 Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline& Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: HOOD CANAL
Rear: Ft. Slope: Ft. SEPA?: Yes
Model: Width: Ft. Side 1: Ft. Shoreline Desig.: Urban
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee TW 4/3/2014 $217.91 S2201400000001
Planning Review Fee TW 4/3/2014 $205.00 S2201400000001
Building State Fee LDK 4/22/2014 $4.50 S120140000000i
Building Permit Fee LDK 4/22/2014 $335.25 S1201400000001
Total $762.66
BLD2014-00315 Please refer to the following pages for conditions of this permit. Page 1 of 4
CASE NOTES FOR
BLD2014-00315
CONDITIONS FOR
BLD2014-00315
1) The surface of floating structures shall be a minimum of eight inches above the surface of the water. X
2) Owner shall provide pile drivers report on all piles. Any pile supporting structure and over 10' in height rom floor of body of water shall require engineered
design and special inspection. Engineer of record (or certified special inspector) shall provide verification at time of inspection that piles are driven to point
M
I and/or installed per design.
3) �'ne'wtreated piling to be used for this project shall recieve a post treatment vacuum of two hours at not less than 22 inches of mercury. Subsequent to
Yontractc
of the vacuum, the piling shall be steamed for a two hour period, followed by a second vacuum of four hours at 22 inches of mercury.
4) r registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1- -647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
5) At time of final a full set of Engineered plans and details will need to be onsite for inspector. Engineering must be site specific for ramp
installed.
6) 111approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building
D ment prior to any further inspections being performed or approvals granted.
7) #he
/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
8) an review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
r I of approved documents will result in failure of required building inspections.
BLD2014 O0315 Please refer to the following pages for conditions of this permit. Page 2 of 4
9) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be
a nd shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
10) 1 construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
p evocation.
11) 7rov'isio'ns for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to a located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your roj
12) All chang o"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
or r regulation, must be reviewed and approved by Mason County prior to construction.
13) STRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENTAND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
I p shall be made prior to requesting additional inspections.
14) property lines shall be clearly identified at the time of foundation inspection.?Mason
15) All building permits shall have a final inspection performed and approved by th County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
16) Founty ordinances and building regulations.
Iplermits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
ac. n for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
h Id r prevented action from being taken. No more than one extension may be granted.
BLD2014-00315 Please refer to the following pages for conditions of this permit. Page 3 of 4
17) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
Fetaininga
ct rs, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
18) walls needed to support a s h r e such as structures, roads, or to support slopes, shall require a separate building permit and approval prior
to construction of the retaining wall.
19) Phe
e per dimensions and setb s on submitted site plan. Setbacks are measured from the furthest projection of the structure.
20) roposed project must be cons' en ,� t II applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason
County Shoreline Master Program.
21) A Hydraulic Project Approval fro a Washington State Department of Fish &Wildlife must be granted prior to construction. For more information
?cact abitat Biologists Leonard Machut at 360-602-0364 (Saltwater).
22) g uctures shall include intermittent supports and/or stops which run parallel to the shoreline to keep structures elevated over the tidelands at
low tide.
23) FI t i for the structure shall be entirely enclosed and contained to permanently prevent the breakup or loss of the floatation material into the water.
24) All construction and demolition debris must be removed from the site after project completion. er disposal of construction debris must be on land in
such a manner that debris cannot enter or cause water quality degradation of State waters.
25) Dock facilities (new or reconstructed) must be maintained in a safe and sound condition. X
OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by
signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the
work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property
and structure(s)for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if
construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS
P MIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
51
gnature Dat
rlwes Z OWNER - REPRESENTATIVE - CONTRACTOR
Print Name (Circle one to indicate)
BLD2014-00315 Please refer to the following pages for conditions of this permit. Page 4 of 4
00 -
o CONCRETE MECHANICAL MANUFACTURED HOME D
0
Date By
A Footings!Setbacks Gas Piping Ribbons
o Interior Date By Interior•Date By Date By rTl
C,? _ __-
� Exterior Date By Exterior-Date B .� U)
Point Load I Isolated Footings INSULATION Date By D
BG!SLAB INSULATION __..__._. ._...._.. >
Date By Data By FIRE DEPARTMENT m
Foundation Walls Floors Date By Cl)
Date By Data By DECKS
FRAMING Walls Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date a
Date By OTHER
Groundwork Attic
Type.
Date By Date By Date By
D.W.v DRYWALL Type_
Int Brace Wall Date B y
Date By Date By r
m FINAL INSPECTION
v
y Water Line Firs Seperation N
m
Date By Date By Date 5_ �-� By C
CD
�
m 44.
s Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By Comments w
o � �
m
cn
(D
N
O
0
O
7
0.
O
I
U)
O
'O
(D
3
0)
(0
fD
0
MASON COUNTY PERMIT NO. 4�
~.L DEPARTMENT OF COMMUNITY DEVELOPMENT
1 BUILDING•PLANNING•FIRE MARSHAL c�
WWW.CO.MASON.WA.US (360)427-9670 Shelton ext352
-- -_} Mason County Bldg. III,426 West Cedar Street (360)275-4467 Belfair ext. 352
lxci PO Box 279, Shelton,WA 98584 (360)482-5269 Elma ext 352
BUILDING PERMIT APPLICATION
OWNER INFORMATION: CONTRACTOR INFORMATION:
NAME:J G,lv,e s m ai 4 e;5. NAME:L,044e5461-e �Yt l:rG7�i n
MAILING ADDRESS: 9/y/ �'. �(P rf /OCR MAILING ADDRESS: P.
CITY: STATE:_ZIP: 9£r59� CITY: e STATE:/,y,4 ZIP: `T'e5S -,r
PHONE:253- -�1Y6 CELL:253-1773-0!/6 PHONE: 6d TELL:
EMAIL:EMAIL: EMAIL :
L&I REG# EXP.
PARCEL INFORMATION:
PARCEL NUMBER(12 DIGIT NUMBER) 32%�3 5-2 —000Y0 FIRE DISTRICT
LEGAL DESCRIPTION(ABBREVIATED): �n�j-aU ,r>t�, 3S-2-2--3 f T.G..
SITE ADDRESS �l tf/ �. ��,- /L�-/61 CITY �,n;z,
DIRECTIONS TO SITE ADDRESS r� �' —.�
IS PROPERTY WITHIN 200 FT:
SALTWATER X LAKE❑ RIVER/CREEK❑ POND ❑ WETLAND ❑ SEASONAL RUNOFF❑ STREAM❑
DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROTECT-GREATER THAN 14% YES❑ NO❑
TYPE OF JOB: NEW ❑ ADDITION ❑ ALTERATION❑ REPAIR;K OTHER Pear -rrlc„
USE OF STRUCTURE(RESIDENCE,GARAGE ETC.) b6ela
IS USE: PRIMARY❑ SEASONAL NUMBER 0 BEDROOMS NUMBER OF BATHROOMS
DESCRIBE WORK r_P�p_l„e p
J
SQUARE FOOTAGE: #ia
1ST FLOOR sq.ft. 2ND FLOOR sq.fL 3RD FLOOR sq.ft. BASEMENT sq.fL
DECK sq.ft. COVERED DECK sq.ft.STORAGE sq.ft. OTHER sq.ft.
GARAGE sq.ft. ATTACHED❑ DETACHED❑ CARPORT sq.ft. ATTACHED❑ DETACHED❑
MANUFACTURED HOME INFORMATION: NlA *4 COPIES OF THE FLOOR PLAN
MAKE MODEL YEAR LENGTH
WIDTH BEDROOMS BATHS SERIAL NUMBER
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further
declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary
parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for
review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180
day or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF
IN ECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS W`LL INVALIDATE THE APPLICATION.
f / _
x �.ti AEI
Signa ure of Applicant ate
OWNE REPRESENTATIVE/CONTRACTOR
Print Name (CIRCLE TO INDICATE)
DEPARTMENTAL REVIEW- APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS
BUILDING DEPARTMENT /JIL ti ZTi i
PLANNING DEPARTMENT
FIRE MARSHAL
1
m
Y
h
IN
� > tin -
' o
i -------------
t � R.
€E{{ F
S C
1
R
0
.: ,�PPROVED
' MASON COUNTY DCD PLANNING
mE
SITE PLAN REQUIRED TO BE ON SITE
}� CHANG •S SUBJECT TO APPROVAL
BY— ,Date
lI.
PLA
:HE
NIN
ALL SETBt
ARE MEASURED ] i
FRO <'' I FURTHEST PROJECTF THE BUILDING
_w
R
PLANNING
V