HomeMy WebLinkAboutMIS99-0512 ReRoof - MIS Permit / Conditions - 8/19/1999 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
M 1 :':;C F L. L.A N E C')U E; P 1E R M T e i 1 Y. T f.!'•i �..1- "� r "Z f.Y
M I S99-0512 PARCEL :322353100000 PLAT : D I V : 81_K t LOT :
JOB ADDRE:SSt 4181 E STATE ROUTE 106 UNION
APPL. I CANT t DON CIIF..NOWETH
OWNER t DON CHENOWIF TH
LEGAL : E 5/' 1 Of NT AND T.L. OF LOT 3
PROJECT DESCRIPTIONc
RE—ROOF TOURCH DOWN \��
PROJECT 1 JCAT I ON
TAKE 101 NORTH EAST ON 106 ABOUT 10 MILES ON LEFT \�
PROJECT NOTES :
�Y
&l 8l l
TYPE AMOUNT BY DATE RECEIPT
'SOGY.tvS:-6':R::::..YK1'=" •�••.•..^�••t'r..C]¢:'O: S`3GS.E.:'J.Fa.i�AL. C►S'.B e1G'.�!
STFE * 4 .50 TW 08/ 19/99 51301
RERF $ 42 .00 TW 08/ 14/99 51301
TOTAL a 46 .E30 OWNFO OR A.(IEN'T OWTE
. ,.» rx-c:r.-.aza+�•.a.:s..-^:.sse,-:�x:ro�:ss_s+ze:.;xc.•�c=sc:urs.as:m
MIS FlUt rev: 94!01191 COMPLIANCE TO ATTACHED CONDITIONS IS
REQUIRED
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date b date by
FRAMING Walls y FIRE DEPT.
date by date b date by
PLUMBING y OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
I date by date by date by
I
(
I
I _ _
I
I -
I
I
I -
I
I
I
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
PERM I -f- C3 N D 1 -r I C:) N *3
Case No . , MIS99-0512
For , DON CHENOwFTfi
Page : I
1 ) ALL ('.ONSTRUCTI(',)N MUST MEET OR EXCEED ALL LOCAL CODES AND UBC
REQUIREMENTS
X
2 ) CONSTRUCTION PROCESS TO BE FIFLO CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE .x
3 ) PURSUANT TO 1997 LINIFORIA BUILDING CODE , ALL SITF MtIST BF MARKED WITH APPROVED NUMBERS
OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE:
STREET OR ROAD FPONTING THE PROPFRTY , MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT
THIS BE COMPLETED PRIOR 'To CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , BASED
ON RATES ADOPTED FEE SCHEDULES AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF
OWNERICONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR 'TO REQUESTING INSPECTIONS .
4 ) SINGLE RAFTER JOIST ROOF REPLACEMENT SHALL. BE INSULATED TO A MINIMUM OF R- 30 ALLOWING
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date by
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by , date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
x
5 ) ENCLOSED ROOF' SYSTEMS THAT ARE EXPOSED TO THE SHEATHING SHALL BE INSULATED 'TO A MINIMUM �
P-30 AND INSPECTED PR 1017 TO COVER . X
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by I date by date by
FRAMING Wads FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
d date by
ate by
D W WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
Late by date by _ date by
w
C&se summary for Case No. : MIS99-0512 Date: 08/19/99'
MISCELLANEOUS PERMIT
:MIS99 -0512 : PROJECT: #: 27705 : MASTER:MIS99-0512 :
NAME. . . . . :DON CHENOWETH STAT: I 08/19/99 NJP
SITE ADDRESS:E4181 STATE ROUTE 106 UNION
PROJECT DESCRIPTION
RE-ROOF TOURCH DOWN
PROJECT LOCATION
TAKE 101 NORTH EAST ON 106 ABOUT 10 MILES ON LEFT
RESPONSIBLE DEPT.BLD RCCAPO DESIG. . . . . . . . . : ? : STAFF. : :
TYPE OF PERMIT. .RR SHORELINE DESIG. . . . . . : ? : ISSUED. . : 08/19/99 :
INSPECTION AREA. . . . 0 : SEPA. . . . . . . . . . . . . . . . . : ? : EXPIRE. . : 02/15/00 :
NOTES
Memo field #1
RE-ROOF TOURCH DOWN
Memo field #2
--------------------
TAKE 101 NORTH EAST ON 106 ABOUT 10 MILES ON LEFT
Memo field #3
---------------------------------------
None
Related cases in project group 27705
-----------------------------------------
MIS99-0512 DON CHENOWETH
. 3aa-3s-3 i.-oo 000
Case summary for Case No. : MIS99-0512 Date: 08/19/99t
MISCELLANEOUS PERMIT
:MIS99-0512 : PROJECT: # : 27705 : MASTER:MIS99-0512 :
NAME. . . . . :DON CHENOWETH STAT: I 08/19/99 NJP
SITE ADDRESS :E1181 STATE ROUTE 106 UNION
PROJECT DESCRIPTION
RE-ROOF TOURCH DOWN
PROJECT LOCATION
TAKE 101 NORTH EAST ON 106 ABOUT 10 MILES ON LEFT
RESPONSIBLE DEPT.BLD RCCAPO DESIG. . . . . . . . . : ? : STAFF. :
TYPE OF PERMIT. .RR SHORELINE DESIG. . . . . . : ? : ISSUED. . : 08/19/99 :
INSPECTION AREA. . . . 0 : SEPA. . . . . . . . . . . . . . . . . : ? : EXPIRE. . : 02/15/00 :
NOTES
Memo field #1
RE-ROOF TOURCH DOWN
Memo field #2
TAKE 101 NORTH EAST ON 106 ABOUT 10 MILES ON LEFT
Memo field #3
None
Related cases in project group 27705
MIS99-0512 DON CHENOWETH Xr::7-Roof
Names and addresses for project group 27705
-------------------------------------------------
--------------------
MIS99-0512 . . . . . . . . . . . . . . . . . . . . . .APL
DON CHENOWETH
9181 E HWY 106
UNION WA 98592
PH:
Actions for case no. MIS99-0512
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
------- ------------------------------ -------- -------- -------- --------------------------------------- ---- --- -------- ---
MISA010 Application received 08/19/99 / / 08/19/99 DONE TW 08/19/99 NJP
MISA050 Approved For Issuance / / / / 08/19/99 DONE TW O8/19/99 NJP
MISA500 (F) Issue permit / / / / 08/19/99 DONE TW 08/19/99 NJP
MISB008 Clerical Review & Approval 08/19/99 / / 08/19/99 DONE TW O8/19/99 NJP
MISB135 RLC Checklist Review / / / / / / 08/19/99 NJP
Conditions for case no. MIS99-0512
1) ALL CONS T 1 0 - ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS
X
2) Field Correct -- CONSTRUCTION PROCESS TO BE FI CO TED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE.x
3) POST ADDRESS -- PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITE MUST BE MARKED WITH APPROVED
NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE
STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE
COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES ADOPTED
FEE SCHEDULES AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST
ADDRESS ,SITE PRIOR TO REQUESTING INSPECTIONS.
X
4) ROOF REPLACEMENT -- SINGLE RAFTER JOIST ROOF REPLACEMENT SHALL BE INSULATED TO A MINIMUM OF R-30
ALLOWI FOR MINIMUM OF ONE INCH CONTINUOUS VENTED AIRSPACE ABOVE THE LEVEL OF INSULATION.
X
5) ROO REPLACEMENT/EXPOSED DECKING -- ENCLOSED ROOF SYSTEMS THAT FOSED TO THE SHEATHING SHALL
BE INSULATED TO A MINIMUM R-30 AND INSPECTED PRIOR TO COVER.
Notes for case no. MIS99-0512
No notes found for this case