Loading...
HomeMy WebLinkAboutMIS99-0206 Replace Marine Railway System - MIS Permit / Conditions - 8/9/1999 MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 PA 1 S.C E L_ l.. A N E C7 LJ r--, F-1 E R M 1 T" FOR INSPECTIONS CALL 427-9670 � MI :399-0206 PARCEL :322352190050 PLAT - DIV : BLKs LOT - JOB ADDRESS : 12421 NE NORTH SHORE RD BELFAIR APPLICANT : BRADLEY THORSON 277-3715 OWNER : RRADLEY THORSON 277--3715 LEGAL. : TO 5 Of 60VT LOT 6 3 TAX $721-1 It 6 4F SF 1112.6 SEE Sl19V1 1 6;156 PROJECT DESCRIPTION = PIRATION IJtJLL & REPLACE MARINE RAILWAY SYSTEM BY i DA PRoJEcT LOCATION : 12 .6 MILES WEST FROM CLIFTON DR INTERSECTIN IN BEL-AIR THORSON NAME SIGN ON LEFT PROJECT NOTES : T"PE AMOUNT BY DATE RECEIPT F'RMT $ 216 .75 KW 04/26/99 50022 PLCK t 137 .96 KW 04/26/99 50022 SEPA 1' 110 .00 KW 04/26/99 50022 P STFE $ 4 50 KS 06109/99 51165 TOTAL : 469 21 _- OWNER, OR AGENT DATE MIS FAIT, r ev i ,1111 t 92 COMPLIANCE TO ATTACHED CONDITIONS IS REOLI I RrD CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Final Floors date by date by date by FRAMING Walls FIRE DEPT. date by date by PLUMBING date by OTHER Groundwork Attic date b date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O, Box 186 Shelton, Washington 98584 PE_' Ft 1 T CC3NIJ I T I C3N :3 Case No . : MIS99-0206 For : BRADLEY THORSON Page : 1 1 ) Apiaroved per dimensions and setbacks on :submitted s,✓t a MDA 9 2 ) The Vroposed protect must be consistent with all applicable policies and other pro islons of the Shoreline Management Act , its rules , and the Mason County Shoreline ltAa ter,✓ r��gr am__ 3 ) AlI " e:orstruction and demolition debris must be removed front the beach after project curr}�i lotion . Prober disposal of construction debris must be on land in such a manner tl t ri's cannot enter or cause water qua 1 i ty de q. r adat i on of State waters . x , 4 ) Con,�rete 1eachate must be contained during pouring, such that water quality degradation of(a aoPt waters does not occur . X 1..�-�L r CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by 77 MASON COUNTY `- Mason County Bldg, III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 5 ) A Hy�lr,aulic Project Approval from the Washington State Department of Fish 8 Wildlife mint b granted prior to construotlon . (contact Doris Small ( 360)895-4756 ) X ,` �._. 6 ) Proposed structures or any portion thereof greater than 30" in height from grade line, mus , maintain a minimum of 5 ' setback from all property tines and easement lines and 10 ' fr ill ;`/County and State Road right of ways . X 7 ) All approved plans are required to be on-site for Inspection purposes . If inspection is called for and plans are not on site, Approval WILL. NOT be: granted . In addition . a Re- Inspection fee, In the amount of $42 .00 per hour ,minimum 1 hour ) will be charged and must be collected by this department prior to any further inspections being performed or approva I granted . Z.:L 8) PURSUANT TO 1994 UNIFORM BUILDING CODE , ALL SITE MUST BE MARKED WITH APPROVED NUM131 RS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , L:kA':"ED ON;RA TES IN TABLE 3A OF THE 1994 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWR/ ONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS ., 44 9) ALL /CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC R F QA) i TEX. l�Jf S 10) Changes' tc approved bulidluig plans that effect compliance to the 1991 Washington State Fre'rgv Code. 1991 Vont i I at I on and i nda r Air Quality . 1 CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by — BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING Attic OTHER Groundwork date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by I i I I PERMIT NO.: MIS MASON COUNTY -� MISCELLANEOUS PERMIT APPLICATION to 426 W.Cedar/P.O.Box 186,Shelton,WA 98584 Shelton 360 427-9670 Belfair 360 275-4467 Elma 360 482-5269 Seattle 206 464-6968 APPLICANT INFORMATION r l71, — CONTRACTOR INFORMATION Owner S -/y / Contractor Name//4R/A/E FZ047-S 1/D Mailing Address 76 Mailing Address/ ,0 &_ "dD" S572REEZ- City CL yu StateGud Zip C9de Sd / 7v City c State4 /. _ Zip Code /. Phone ,97-371 Other ) *17--- 67 Ph. o Other Ph.(� Lien/Title Holder NdA/e Contractor Reg. Address Expiration PARCEL INFORMATION-12 digit Tax Parcel No. /A 9ezos-, 6 Fire District Legal Descriptiont�*DU LD7" *d kA-1 y SEC 3S' 7ZUPA&4A� R .;?Ly Site Address(include street name and city 447/ .UE Zbp7H JW4ga .,WA.4 . 7;gvq&VA Directions to site: 6 !LEST. FRdi`l L'L/Fr29VJ Z)R, ,z.-Al SGi^T/nmj /A/ REc.Sc1/4 117744PS&O" XUA< /c< o.0 t _ Will timber be cut and sold in parcel preparation? (Yes/No) �/� /f� Is your property within 200' of the following: Body of Water (Name) /` .dz 4—JV-(/.CIL Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs i TYPE OF JOB New Add Alt Repair OtherX- Use of Building fc' Describe proposed construction PLX& 4A1ST/.Ul ^d///.UG II RI E' �F4/LLU�CIV rVS7=H SHORELINE PROJECTS New Replacement Repair Expansion Bulkhead Material (concrete, rock, wood, etc.) Length Height A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF PERMIT. NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection of this project. Acknowledgment of such is by signature below: OWNER AFFIDAVIT-1 certify that I am exempt from the requirements of CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a the Contractor Registration Law RCW 18.27 and am aware of the contractor in the State of Washington and that I am aware of the ordinance requirements for which this permit is issued and that all work ordinance requirements regulating the work for which this permit is issued will be done in conformance therewith. No changes shall be made without and all work shall be done in conformance therewith. No changes shall first obt Wing approval. G be made without first obtaining approval. Date "7 X Date FOR OFFICIAL USE BEYOND THIS POINT Accepted by ` Date*Submittal Amount Due, Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED CONDITION CODES Building Department Occ Grp Type of Const. Planning Department Environmental Health Department Public Works Department Fire Marshal Valuation $ 19 , 600 FEES Building Permit Fee -off` Site Inspection Plan Review Fee Other UFC Plan Review Fee Other ST Violation Fee Pre-Paid at Submittal ( r3T--- ) FE S `.> TOTAL E