Loading...
HomeMy WebLinkAboutSPI2003-00061 - SPI Inspections - 6/11/2003 oN srgrF MASON COUNTY BPS c Ir- DEPARTMENT OF COMMUNITY DEVELOPMENT M o r ° S N Planning Division N Y y P O Box 279, Shelton, WA 98584 (360)427-9670 1864 Site Inspection June 11, 2003 JEANNE FOERSTER TO BE KEPT IN THE 1240 NE NORTHSHORE ROAD BELFAIR WA 998528 PARCEL FILE Case No.: SP12003-00061 Parcel No.: 322352100030 Project Description: INSPECTION TO ASSESS POTENTIAL BUILDING LOCATION ON LOT Dear Applicant: Pursuant to your application, a site pre-inspection (SPI)was performed on your property. Below you will find comments made regarding the proposed development and its critical values. In some cases, setbacks for development from shorelines, steep slopes, streams, and wetlands must be included in your specific proposal; these setbacks are included as part of the comments listed below. This information is based on County and State regulations as they exist to date. These regulations may change and may affect the requirements for development of the subject property. Please contact me at(360) 427-9670, ext. 577 if you have questions. Sincerely, Rick Mraz --- Land Use Planner Mason County Planning Department 6/11/2003 1 of 2 SP12003-00061 Site Inspection 6/11/2003 Case No.: SP12003-00061 Comments: A field inspection of the subject property was conducted on 5/20/03 to assess critical areas issues related to the placement of a well to serve the subject parcel. Two locations were considered. One site is characterized by steeps slopes and would be subject to the regulatory requirements of the Landslide Hazard Areas (LHA) chapter of the Mason County Resource Ordinance. A well in this location would require a Mason Environmental Permit (MEP) and a geotechnical report to support the permit application. A copy of the MEP application and the LHA chapter are enclosed. The second location is adjacent to a type V stream and would also require an MEP. The Resource Ordinance requires a minimum 90setbacyp k from Type V streams. The setback is comprised of a 75' undisturbed vegetative buffer + a 15' building setback. If well construction encroached more than 50' into the buffer a Habitat Management Plan (HMP), prepared by a qualified biologist, would be required to support the permit request. The HMP addresses impacts to the buffer and offers measures to preserve and protect the buffer or mitigate impacts. A copy of the Fish and Wildlife Habitat Conservation Areas chapter is enclosed. It includes details on the contents of an HMP. If you have questions or require clarification of these issues, please contact me. 6/11/2003 2 of 2 SP12003-00061 r MASON COUNTY PLANNING DEPT. PRE-INSPECTION APPLICATION PLEASE PRINT $200.00 Fee Required 1. Owner: Nk A -eowzsllt Applicant: F"Oti�Tl:,W_ Tkwy Site Address:L CT Nd LbMflisthW ^ tIIt-Applicant Address:07.10 t4~ Owner Address:0.18 144A&JA kid KW'Y _ City. AL>V4L-r1,.b St WA Zip CM-15 City: # i,)KJ VV St Loft Zip q4(1,1 Phone:_( XOfo ) 3 6 day Phone:_ q14 day Phone:_ L evening 2. Parcel No. 3ZZ 'S S - Z/ - oom /,o Parcel No. - - Legal Description: Planner: GBM RAM PBC SAL 3. Purpose of Pre-Inspection : �60LLV I-Dr-K11Ow OW T 4. Use of Building: 5. Do any of the following exist on or adjacent to property? slope L] saltwater❑ lake ❑ river❑ pond ', wetland seasonal runoff! other '. stream Ll seasonal creek ❑ Directions toSite: r MALAOS V=JeDW4- t4(L U If the information is incompl ason County must disclaim any errors resulting from deficiencies in the original application. Pre pection report remain valid only until development changes occur in the vicinity which affect the lot evaluat in this inspection, r the laws regula ng develooment of the site change after the time of inspection. Applicant Signature: Date: / p If you would like to be on site during inspection, please check here: i I Return application to: Department of Community Development, Planning Division R E C E I d E P.O. Box 279 Shelton, WA 98584 =APR2 03 (360) 427-9670 Please include a $200.00 check or money order payable to Mason County Treasurer MCCD - PLANNING When completed, this form becomes part of the parcel file./ r/ , FOR OFFICE USE ONLY: Accepted by: --'� Date: Please illustrate below the proposed building site in relation to water &0roperty lines: SRGANortlMtyD---,lsrrYPMStuN/P--Insged-n RECEIVED APR 2 8 2003 426 W. CEDAR „,', Please illustrate below the proposed building site in relation to water and property lines: r flnr�artrr�Antal RQ��iP�n/ (For Office Use Only) Planning Department Findings: