HomeMy WebLinkAboutMIS98-0047 Dock and Bulkhead - MIS Permit / Conditions - 6/11/1998 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
t-._ t- n N V Cy U -c-:; i-' If." If t M I f :,/H
MIS98-0047 PARCEL :322353100030 PLAT : B[._K : LOT :
JOB ADDRESS : 9091 F STATE ROUTF 106 UNION
APPLICANT : KATHLEEN HICKS 360--533--5465
OWNER .- KATHL.EEN HICI'S 360- 533 -5465
i_Ec,AI. : TR 3 OF IOT 3 8 T.I. FM
PROJECT DESCRIPTION ,
DOCK AND BULKHEAD
PROJECT I.00ATION :
2- 3 M 1 LFS EAST FROM UNION ON ST HWY 106 ON THE LEFT HAND SIDE OF HIGHWAY . ACROSS t11 rl-IWAY 14101A T
g090 ST HWY 106
PROJECT NOTES :
Submitted plans do not comp i Y with Mason County Shoreline Master Program qu i de l i nee: ftnd
requ I a t i ons of Chapter 7 .16 . 170, PIERS AND DOCKS .
TYPE: AMOUNT BY DATE RECEIPT
PRMT $ 97 .50 K 06/ 11 /98 47342
PICK S 39 .00 KS Of;/ 11 /98 41342 `
STFE $ 4 .50 KS 06/ 11./Q8 47342
TOTAL : 1 4 1 ,t�0 OWNS:R OR AGE DATE
r_�arszrwvr_r�-�:x-z:—..a;.:-x.-.:rx:as�va.—ac:-r_.i••�:t•..--:.•-.:s-c:..
MIS 1111, rev: 04101192 COMPLIANCE TO. ATTACHED CONDITIONS IS
it
RF00I RFD
i
Y .
7
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date b date by
D.W.V. WALLBOARD NAILING
date date b
Water Line by FINAL INSPECTION y
date by date �- 7- �j8 by date by
i
7
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
PF FtRn I -T- CUNF0 1 -1 1 1"1
Case No . : MIS98-0047
For .- KATHLEEN HICKS
Page : 1
1 ) All approved plans are required to be on- site for inspection purposes . If Inspeotion
Is called for and plans are not on site, Approval WILL. NOT be granted . In addition , a
Red- Inspection fee in the amount of $34 .00 per hour, (minimum 1 hour ) w i 11 be chhrged and
must be collected by this department prior to any further inspections being performed or,
approval granted .
2 ) PURSUANT TO 1 491 UNIFORM Rtl 1 L D I Nr CODE , SECTION 3ff-(C ) AND SECTION 513 , nL I S. I TES Mt1,,T
HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE
AND LEGIBLE FROM THE S7RFET OR ROAD FRONTING THE PROPFHTY . MASON COUNTY BUILDING,
DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A
RF I NSPFCT I ON FEC , BASF D ON RATES IN TABLE 3A OF THE 1994 ON 1 FORM 110 1 t D 1 NG CODE WILL BE
ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPECTIONS .
I�
i
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
� . v
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
3 ) changes 'to approved bai ldinq glans iiirai effeu( c.ompi iaric:tl ku Lite 1991 wtashingioll state
Energy Code, 1991 Ventilation and Indoor Air Quality
Code, the Uniform Eau i I d i ng (:ode and/or Ma%on Goun t y Regulation,., must be approved by
Masan County prior to constructionx ,—:z// '
4 ) CONSTRUCTION PROOFS; T-U BF F I FF.C) CORRECTED .AS REQUIRED PER MASON COUNTY SU i t V I NG
DEPARTMENT AND UNIFORM BUILDING CODE x
9 ) Water- quality Is not being degraded to the detriment of the aquat I c: ell i ronment as a
re ,tr I t of th i s pro ject .
6 The proposed prole(.-,t merst be cons i -.tent with a 1 appI ioable pot iCie�; find cat her
provisions of the Shoreline Management Act , Its rules , and the Mason County Shoreline
Master Program .
7 ) Proper disposal of oonstruc;t i on debris must be (in uplands , irk such a mariner that deter i s
cannot enter, wetlands or ca.rase water quality degradation of adjacent: waters .
8 ) Applicant acknowledge-, that this development 1 subject to policies and requ1atiotl,:, of
Mason County Comprehensive Plan and Development Regulations .
I'I
i
i
i
i
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b _
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date b date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
I