PERMIT# BLD2024-00563 PROJECT ADDRESS 7381 NE NORTH SHORE RD BEL, WA 98528
PARCEL# 222171190000 PROJECT DESCRIPTION Install 2 ductless heat pumps with 4 air handlers
OWNER ADDRESS PHONE
CONTRACTOR ESSENTIAL MECHANICAL LLC ADDRESS 1320 26TH ST NW#12 PHONE 253-576-7251
CONTRACTOR LICENSE ESSENML802LZ LENDER
INSPECTION INSP I DATE Comments INSPECTION INSP DATE Comments
Mechanical/Plumbing Final -1- I
Mason County
/1>
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
FRHANDLERS
4-00563 MECHANICAL - RESIDENTIAL
ESCRIPTION: INSTALL 2 DUCTLESS HEAT PUMPS WITH ISSUED: 05/06/2024
ESS: 7381 NE NORTH SHORE RD BEL EXPIRES: 11/02/2024
PARCEL: 222171190000
APPLICANT: TRANG THONG OWNER:
1226 181 ST PL SW
LYNNWOOD,WA 98037
CONTRACTOR: Essential Heating and Air
1320 26th ST NW Ste 12
Auburn,WA 98001
253-576-7251
GENERAL CONTRACTOR'S LICENSE: ESSENTIAL MECHANICAL LLC License: ESSENML802LZ
1320 26TH ST NW#12 Expires: 06/17/2024
AUBURN,WA 98001
253-576-7251
FEES: Paid Due
State Fee-Residential $6.50 $0.00
Mechanical Base Fee $30.00 $0.00
Final Inspection $80.00 $0.00
Technology Flat Convenience $5.00 $0.00
Fee
Mechanical Fees $75.00 $0.00
Totals : $196.50 $0.00
FIXTURES
City Mechanical Fixtures
2.0000 Ductless Heat Pump
REQUIRED INSPECTIONS
Printed by:Anna Schaffran on:06/17/2024 11:08 AM Page 1 of 5
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2024-00563
Mechanical/Plumbing Final Inspection
CONDITIONS
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency
(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos
containing materials have been identified and removed from the area to be demolished. Work shall not commence on an
asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B
Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
Printed by:Anna Schaffran on:06/17/2024 11:08 AM
Page 2 of 5
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2024-00563
To perform an inspection the Mason County Building Inspector will need to access the interior of the structure. An
electrical permit completed and approved by Washington State Labor& Industries must be available on-site during the
inspection.
The Mason County Building Inspector will inspect the following:Verify that the system is installed in accordance with
manufacturer specifications;The inspector will check to make sure that the exterior unit is permanently installed and
supported, the exterior unit complies with required setbacks to property lines, fuel tanks are located at least 10-ft from the
system, a source of ignition,all exterior penetrations are properly sealed,condensate lines are installed and are properly
supported, including proper material, slope, and that the condensate line terminates to a proper location outside of the
foundation, copper refrigerant lines are insulated with '/z°thick continuous closed-cell foam insulation or better, indoor units
are located at least 3-ft from smoke and carbon monoxide alarms,and that modifications made to the structure, to install the
unit, does not affect existing structural members.
Printed by:Anna Schaffran on:06/17/2024 11:08 AM Page 3 of 5
r �
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2024-00563
This property has been identified in a FEMA(AE) Flood Hazard Area. SUBSTANTIAL IMPROVEMENT as defined in the
2021 International Building Code is any repair,reconstruction, rehabilitation, alteration, addition or other improvement of a
building or structure, the cost of which equals or exceeds 50 percent of the market value of the structure BEFORE the
improvement or repair is started. If the structure has sustained substantial damage, any repairs are considered substantial
improvement regardless of the actual repair work performed. The term does not, however, include either:
1. Any project for improvement of a building to correct existing health, sanitary or safety code violations identified by the
building and that are the minimum necessary to assure safe living conditions.
2, Any alteration of a historic structure provided that the alteration will not preclude the structure's continued designation as a
historic structure.
When Substantial Development has been determined future work including such items as change of use, additions,
alterations, and repairs are subject to the requirements of the 2018 International Existing Building Code and 2021
International Building Code Section 1612.
Mason County Flood Prevention Ordinance definition (MCC 14.22.040):
"Substantial improvement" means any repair, reconstruction, or improvement of a structure, taking place DURING A TEN-
YEAR PERIOD, in which the cumulative cost equals or exceeds fifty percent of the market value of the structure either:
(1)Before the improvement or repair is started, or
(2) If the structure has been damaged and is being restored before the damage occurred. For this definition "substantial
improvement"is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building
commences, whether that alteration affects the external dimensions of the structure.
This term includes structures which have incurred "repetitive loss"or"substantial damage" regardless of the actual amount
of repair work performed.
The term does not, however, include either:
(1)Any project for improvement of a structure to comply with existing state or local health, sanitary, or safety code
specifications which have been identified by the local code enforcement official, and which was in existence prior to the
damage event or improvement, and which are solely necessary to assure safe living conditions, or
(2)Any alteration of a structure listed on the National Register of Historic Places or a State Inventory of Historic Places.
All future work will be evaluated at the time and by scope and value.
* Both exterior units must be elevated and anchored above the Base Flood Elevation of 15 ft.All components must be
protected from water intrusion.
Printed by:Anna Schaffran on:06/17/2024 11:08 AM
Page 4 of 5
� q
Mason Couniy
Mason County - Division of Community Development
615 W. Alder St.
Ok:
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MECHANICAL - RESIDENTIAL BLD2024-00563
hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Anna Schaffran on:06/17/2024 11:08 AM
Page 5 of 5