SHX2017-00054 Port Grapeview Dock, Bulkhead - SHX Application - 6/29/2017
r----------� NLY -------i 6 SIATr I M 1 I ' 2017 ' WAS H I N GTON STATE oSE 9 orps Date received: JUN 2 g 1 S.tt.Dlsind 1 I I Joint Aquatic Resources Permit G15 Wed Street Agency reference#: •�1Q0 ; Application (JARPA) Form',2 [help] I 1 1 I USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. Tax Parcel#(s): 1Z105-57l • LVLV00I 1 1 I ------------------------------------- Part 1—Project Identification 1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) ltgid Port of Grapeview Floating Community Dock and Bulkhead Part 2—Applicant The person and/or organization responsible for the project. [L@!PJ 2a. Name (Last, First, Middle) Carlson, Glenn (Commissioner) 2b. Organization (If applicable) Port of Grapeview 2c. Mailing Address (Street or PO Box) PO Box 3 2d. City, State, Zip Grapeview, WA 98546 2e. Phone(1) 2f. Phone(2) 2g. Fax 2h. E-mail (360) 275-5020 (206) 200-5452 Portofgrapeview2@gmail.com Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at http//www nws usace army mil/Missions/CivilWorks/Requlatory/PermitGuidebook/EndangeredSpecies.aspx. • Not all cities and counties accept the JARPA for their local Shoreline permits. If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to hftr)://www.epermitting.wa.gov/site/alias reSourcecenterharpa iarpa form/9984/iarpa form.aspx. For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or help oria.wa.4oy. ORIA-16-011 Page 1 of 15 Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) [help] 3a. Name (Last, First, Middle) Boeholt, Ann 3b. Organization (If applicable) Soundview Consultants, LLC 3c. Mailing Address (Street or PO Box) 2907 Harborview Dr., Suite D 3d. City, State, Zip Gig Harbor, Washington, 98335 3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail (253) 514-8952 (253) 514-8954 ann@soundviewconsultants.com Part 4—Property Owner(s) Contact information for people or organizations owning the property(ies) where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [help] ❑x Same as applicant. (Skip to Part 5.) © Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for each additional property owner. ❑x Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First, Middle) 4b. Organization (If applicable) 4c. Mailing Address (Street or PO Box) 4d. City, State, Zip 4e. Phone(1) 4f. Phone(2) 4g. Fax 4h. E-mail ORIA-16-011 Page 2 of 15 Part 5—Project Location(s) Identifying information about the property or properties where the project will occur. hel ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (Check all that apply.) [t@!PJ ❑ Private ❑ Federal Z Publicly owned (state,county, city, special districts like schools, ports, etc.) ❑ Tribal Z Department of Natural Resources (DNR) —managed aquatic lands (Complete JARPA Attachment E) 5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) hel West End of Griswold Avenue 5c. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) hel Grapeview, WA 98546 5d. County hel Mason 5e. Provide the section, township, and range for the project location. hl elp] '/.Section Section Township Range NE 5 21 N 1 W; WM 5f. Provide the latitude and longitude of the project location. [hem • Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees-NAD 83) 47.33806/-122.82275 5g. List the tax parcel number(s)for the project location. [t@jpi • The local county assessor's office can provide this information. 12105-51-00900 5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) hel Name Mailing Address Tax Parcel #(if known) Fair Harbor Marina (Vernon and PO Box 160 12105-51-65001; and ..................... Susan Nelson Grapeview, WA 98546-0160 12105-51-64001; and 12105-41-64003 The Pitman Family Trust 2253 Martin Apt. #203 12105-51-63004; and ...................................... Irvine, CA 92612-1446 12105-51-63005 ORIA-16-011 Page 3 of 15 5i. List all wetlands on or adjacent to the project location. nei None 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. n[ eM Case Inlet 5k. Is any part of the project area within a 100-year floodplain? nei ® Yes ❑ No ❑ Don't know 51. Briefly describe the vegetation and habitat conditions on the property. h[ eip Upland areas of the subject property consist of an asphalt road leading to the existing concrete boat ramp and Case Inlet. Remaining surface areas consist of mud, sand, and small rocks. Washington Department of Ecology background data suggests the potential presence of patchy eelgrass fringes, patchy salt marsh fringes, and low marsh fringes on the shoreline of the subject property; however, an aquatic vegetation assessment during a low tide on May 27, 2017 concluded that no macroalgae or eelgrass was present within the project area. 5m. Describe how the property is currently used. nl elo The Port of Grapeview property is used as a boat launch primarily by recreational boaters and commercial shellfishers. The upper area of the property is used as a driveway to back boats onto the boat launch ramp. 5n. Describe how the adjacent properties are currently used. h[ ell The adjoining properties to the north are developed with single-family residences. The properties to the south are occupied by buildings associated with the Fair Harbor Marina, which provides boat moorage for recreational boaters, fuel for motorized boats and grocery/gift shopping. To the east of the subject property is Case Inlet. 5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current condition. n[ elpl The subject property is currently developed with an asphalt road leading to an existing concrete 24' X 137' boat ramp and Case Inlet. The existing boat ramp is approximately 60 years old and deteriorating to a point that requires replacement. The boat ramp is used primarily by recreational boaters and commercial shellfishers for boat launching and product transfer (transfer of shellfish from boats to refrigeration trucks). An application is currently under review by the U.S. Army Corps of Engineers for reconstruction of the existing boat ramp, an independent but related project; it is expected that the Corps of Engineers will issue a Nationwide Permit#36 boat rams for this boat ramp replacement project. 5p. Provide driving directions from the closest highway to the project location, and attach a map. of eM Starting from Allyn, WA drive South 0.8 miles on State Route 3. After crossing Sherwood Creek Bridge turn left onto Grapeview Loop Road and travel 3.0 miles. Turn left onto Griswold Avenue. The Port of Grapeview boat launch next to Fair Harbor Marina. ORIA-16-011 Page 4 of 15 Part 6—Project Description 6a. Briefly summarize the overall project. You can provide more detail in 6b. hf giPJ The proposed project is to construct a new 165-linear foot dock consisting of a 121.5-foot floating dock and a 43.5-foot. gangway. The floating dock will consist of six (6), 20-foot by 8-foot pre-fabricated fiberglass sections with more than 50% grating. Each float section will be supported by a 10-inch diameter steel pile. The waterward end of the dock will reach -4.3 feet in elevation with the furthest waterward steel pile placed at -4 feet. A 48-foot by 5-foot grated aluminum gangway with metal railings will be attached to the floating dock and supported by one (1), 10-inch steel pile. A total of seven (7) piles are proposed for the entire dock. An 8- foot wide section of the existing concrete bulkhead located at OWH will be replaced with a new concrete wall section and footing (the "platform bulkhead"). Immediately landward of Ordinary High Water (OHW) and the new bulkhead section, the gangway will connect to a new 8-foot by 8-foot, ADA compliant, concrete platform with underground supports and wood railings. This platform will connect further landward to a new 128-square foot concrete sidewalk, which will provide pedestrian access (including ADA) from Griswold Avenue. 6b. Describe the purpose of the project and why you want or need to perform it. hel The proposed project will provide the community with a floating dock for short term water access and limited duration mooring of boats before and after use of the boat ramp. 6c. Indicate the project category. (Check all that apply) [hel ® Commercial ❑ Residential ❑ Institutional ❑ Transportation ® Recreational ❑ Maintenance ❑ Environmental Enhancement 6d. Indicate the major elements of your project. (Check all that apply) [help] ❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall ❑ Bank Stabilization ❑ Dam/Weir ❑ Floating Home (upland) ❑ Boat House ❑ Dike/ Levee/Jetty ❑ Geotechnical Survey ❑ Road ❑ Scientific ❑ Boat Launch ❑ Ditch ❑ Land Clearing Measurement Device ❑ Boat Lift ® Dock /Pier ❑ Marina / Moorage ❑ Stairs ❑ Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility ❑ Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool ❑ Buoy ❑ Ferry Terminal ® Piling/Dolphin ❑ Utility Line ❑ Channel Modification ❑ Fishway ❑ Raft ❑ Other: 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. hel • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. ORIA-16-011 Page 5 of 15 Approximately 19 cubic yards of native soil/sediment will be removed immediately landward of OHW to construct the pier foundation. Three concrete walls with footings will be poured in place; one shall be at the existing bulkhead (at OHW), and will replace the existing bulkhead (see section A of sheet AP2.3). Two additional walls with footings shall be poured perpendicular to the new platform bulkhead. These three walls will form the foundation for the new pier platform. This will be backfilled with clean, free draining, compacted gravel or CSBC (Crushed Surface Base Course), and capped with compacted CSBC and a 4-inch thick concrete surface. The new ADA compliant sidewalk will be poured in place concrete, over a prepared bed. A prefabricated 48-foot by 5-foot grated aluminum gangway with metal railings will be attached to the pier platform. It will be supported by one (1), 10-inch steel pile at the waterward end of the gangway. All pilings will be installed from the water, with a vibratory hammer. Six (6), prefabricated 20-foot by 8-foot floats with fiberglass grating will be placed together and attached to the waterward end of the gangway. Installation will occur from a floating barge. All activities will take place within a 100-year floodplain. 6f. What are the anticipated start and end dates for project construction? (Month/Year) [help] If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or stage. Start Date: October 1, 2017 End Date: March 14, 2019 ❑ See JARPA Attachment D Project will begin 120 days after issuance of all permits and in water work will occur during the fish window of July 1 to March 14 (of any consecutive years). The project will require less than 60 working days. 6g. Fair market value of the project, including materials, labor, machine rentals, etc. heI $250,000 6h. Will any portion of the project receive federal funding? Leipj • If yes, list each agency providing funds. ❑ Yes N No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) h[ g1p 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. heI N Not applicable 7b. Will the project impact wetlands? hf elgI ❑ Yes N No ❑ Don't know 7c. Will the project impact wetland buffers? heI ❑ Yes N No ❑ Don't know 7d. Has a wetland delineation report been prepared? [help] • If Yes, submit the report, including data sheets,with the JARPA package. ❑ Yes N No 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? h[ pip] ORIA-16-011 Page 6 of 15 • If Yes, submit the wetland rating forms and figures with the JARPA package. ❑ Yes ❑ No ❑ Don't know Not Applicable 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? [help] • If Yes,submit the plan with the JARPA package and answer 7g. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes ❑ No ❑ Don't know Not Applicable 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. ELgipi Not Applicable 7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below)where we can find this information in the plan. [heir] Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area flood, etc.) rating ft. or type (sq. ft. or category' Acres) acres) If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents, such as a wetland delineation report. z Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms with the JARPA package. 'Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable. 4 Creation C ,Re-establishment/Rehabilitation R,Enhancement E ,Preservation P ,Mitigation Bank/In-lieu fee B Page number(s) for similar information in the mitigation plan, if available: 7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. [help] Not Applicable 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. hel ] Not Applicable Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) hf elal © Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) ORIA-16-011 Page 7 of 15 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. h[ elpl ❑ Not applicable Most of the construction associated with this project shall occur landward of the OHW. Intertidal work is limited to demolition of the existing bulkhead and replacement with a new platform bulkhead, and installation of seven (7) 10-inch diameter pilings. Bulkhead work shall occur during low tides; installation of pilings will occur from a floating barge, during high tides. Installation of the gangway and floating dock sections will be accomplished by floating in these pre-fabricated elements and attaching them, while working from a floating barge. The contractor will be required to submit a Construction/Tides Plan outlining possible work dates and times that allow construction of all portions of the project during the applicable tide. It is possible that some work may need to be conducted during the evening hours, as that is when low tides occur during the proposed construction window. A coir log barrier shall be placed around the perimeter of the work area to prevent sediments and debris from migrating waterward. This will be removed when the work is completed or tide is flooding. Work below the Ordinary High Water mark (OHW) shall only occur from January 1 through March 14 and July 1 through December 31 of any consecutive year. The contractor shall develop and implement a site- specific spill prevention, containment and control plan. The movement and use of heavy or tracked machinery is restricted to the staging area. Beach area grades disturbed during construction will be reshaped to pre- project conditions upon project completion. All construction equipment will be inspected daily for fluid leaks and no equipment will leave the staging area until any leaks are repaired. Fueling and maintenance of equipment will occur in upland staging areas only. If barge equipment is to be used, no grounding will be allowed. No excavated materials will be stockpiled below ordinary high water (OHW). No materials shall be stockpiled outside of the staging area unless they will be used in that day's work. The proposed pilings are the minimum necessary to secure the proposed floating dock, given the currents within this waterway and the anticipated tension and pressure from boat usage. Minimizing piling diameter will significantly reduce potential underwater construction noise during piling installation. The floating dock will be comprised of fiberglass grating that allows more than 50% of the light to penetrate (i.e more than 50% grated). 8b.Will your project impact a waterbody or the area around a waterbody? h[ do ❑x Yes ❑ No 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? [heip] • If Yes, submit the plan with the JARPA package and answer 8d. • If No, or Not applicable,explain below why a mitigation plan should not be required. ❑x Yes ❑ No ❑ Not applicable Avoidance and minimization measures are proposed, as detailed in Section 8a, above. Avoidance, minimization, and compensatory mitigation measures are further discussed within the Shoreline, Critical Areas, FEMA and ESA Assessment Report and Habitat Management Plan. 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your answer here. h[ elk] Mitigation of the proposed floating dock begins with avoiding and minimizing impacts. Minimal work will occur over or within the water, because the pier to which the gangway attaches, will be landward of OWH. Only the gangway and floating dock (together comprising a dock that is 165-feet long) will extend into the water of Case Inlet. The new floating dock will be grated, to allow light penetration. The presence of a community dock will minimize the need for additional joint-use and individual docks within the vicinity of Grapeview and Reach (Treasure) Island, Case Inlet. Additional compensatory mitigation will include shoreline planting, installation and anchoring) of large woody debris, and removal of angular rock currently I ORIA-16-011 Page 8 of 15 upon the beach at this location. Together these measures will improve the quality of shoreline habitat at the Port of Grapeview property. 8e. Summarize impact(s) to each waterbody in the table below. hei Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of drive, etc.) relative to placed in or removed waterbody MLLW2 from waterbody directly affected Remove existing bulkhead section Not applicable; this and install new Case Inlet At and above 14 days work is landward of 8 linear feet of cast in place OHW (16'+) shoreline concrete wall and OWH. footing. Install 7, 10" diameter 3.78 sq. ft. (each galvanized steel Case Inlet 10 to -4 7 days piling has an area of .54 sq. ft. pile Install 6 Pre-cast Case Inlet 10'to -4.3' 1 day 960-square feet 960-square feet floatingdocks overwater Install Pre-cast grated aluminum 217-square feet gangway with Case Inlet 16'to 10' 1 day overwater 217-square feet metal railings If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. 2 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3 Indicate the days, months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount(in cubic yards) you will use, and how and where it will be placed into the waterbody. [t@jPJ • Installation of seven (7), 10-inch galvanized steel pile (3.78-square feet total) at elevation of 10 feet to -4 feet (MLLW). *Installation of six (6), 20-foot by 8-foot floats (960-square feet total) at elevations of 10 feet to-4.3 feet. • Installation of pre-fabricated 240-square foot aluminum gangway with metal railings at elevations of 16 feet (OHW) to 10 feet. 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. LLeld Approximately 19-cubic yards of soil/sediment will be removed to prepare site for an access sidewalk and platform at elevations of 18 feet to 16 feet (OHW). This work will be done from the existing access road; by hand and with a wheeled excavator. Material will be disposed at an approved upland location. ORIA-16-011 Page 9 of 15 Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. [heI Agency Name Contact Name Phone Most Recent Date of Contact DNR Donald Olmsted (360) 902-1071 04/20/2017 WDFW Margie Bigelow (360)427-2179 05/31/2017 Ecology (Fed Lori Kingsbury (360) 407-6926 11/12/2015 Permitting) Army Corps Jacalen Printz (206) 764-6901 06/08/2017 Mason County Ron Buckholt (360) 427-9670 x287 03/20/2017 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington Department of Ecology's 303(d) List? h( elpi • If Yes,list the parameter(s)below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: http://www.ecy.wa.gov/programs/wq/303d/. M Yes M No The Washington State Department of Ecology's (WSDOE) on-line Water Quality Atlas identifies this portion of Case Inlet as having a water quality assessment of Category 2, due to potentially elevated levels of bacteria. Category 2 waters are not 303-d listed but these are areas where there is some evidence of a water quality problem, but not enough to require production of a water quality improvement project (including total maximum daily load [TMDL]). 9c.What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? heI • Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC. Puget Sound Watershed - 17110019 9d. What Water Resource Inventory Area Number (WRIA#) is the project in? [heipi • Go to http://www.ecv.wa.gov/water/wria/index.html to find the WRIA#. 14 Kennedy— Goldsborough 9e.Will the in-water construction work comply with the State of Washington water quality standards for turbidity? heI • Go to http://www.ecy.wa.gov/programs/wg/swas/criteria.htmI for the standards. M Yes ❑ No ❑ Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? h( eM • If you don't know, contact the local planning department. • For more information,go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html. ❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy M Other: Urban Commercial 9g. What is the Washington Department of Natural Resources Water Type? he[�]I • Go to http://www.dnr.wa.gov/forest-practices-water-typing for the Forest Practices Water Typing System. ORIA-16-011 Page 10 of 15 M Shoreline © Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 91h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? hel • If No, provide the name of the manual your project is designed to meet. ❑ Yes © No Name of manual: Mason County Countywide Stormwater Management Plan 9i. Does the project site have known contaminated sediment? [helpi • If Yes, please describe below. ❑ Yes © No The Washington State Department of Ecology (WSDOE) database shows a confirmed or suspected contaminated site (ID#6309) on the adjacent Fair Harbor Marina parcel, due to the presence of petroleum products in soil and groundwater(from a leaking underground storage tank). However, this is on an upland location on the adjacent parcel to the south (the Fair Harbor Marina) and this area will not be disturbed during soil removal and construction of the platform bulkhead, pier foundation, or sidewalk. Also, The WSDOE noted the site as "reported cleaned up" in February 2008. Nonetheless, best management practices will be employed during construction to prevent the unintentional release of petroleum products that may be contained within the excavated material. BMPs will consist of coir logs, silt curtains, and conducting all intertidal work during low tide. A Spill Prevention, Control, and Countermeasure Plan (SPCCP) will be developed by the contractor and the contractor will be responsible for containment and removal of any toxicants released. A spill kit will be immediately available onsite for use in the event of any inadvertent release. 9j. If you know what the property was used for in the past, describe below. heI Uses are unknown at the subject property prior to its current use, which has been a boat ramp for approximately 60 years. 91k. Has a cultural resource (archaeological) survey been performed on the project area? LbLeM • If Yes, attach it to your JARPA package. ❑ Yes M No Excavation for the pier platform footing will involve excavation to about 8 feet, along a section of shoreline that is 8 ft. wide. This is immediately behind an existing concrete bulkhead at landward edge of the existing boat ramp. The native beach soil/sediment was likely been disturbed when the boat ramp and bulkhead were initially installed and this area has received continuous disturbance from human use for the last 60 years. 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. hf elpl Humpback Whale (Megaptera novaeangliae) Southern Resident Killer Whale (Orcinus orca) Puget Sound Steelhead Trout (Oncorhynchus mykiss) Puget Sound Chinook Salmon (Oncorhyncus tshawytscha) Bull Trout(Salvelinus confluentus) Bocaccio Rockfish (Sebastes paucispinis) Yelloweye Rockfish (Sebastes ruberrimus) Marbled Murrelet (Brachyramphus marmoratus) 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. hel Estuarine and Marine wetlands ORIA-16-011 Page 11 of 15 Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://ar)ps.oria.wa.gov/opas/. • Governor's Office for Regulatory Innovation and Assistance at (800) 917-0043 or help(cD-oria.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. 10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) he[�I ] • For more information about SEPA,go to www.ecy.wa.gov/programs/sea/sepa/e-review.htmi. ❑ A copy of the SEPA determination or letter of exemption is included with this application. ❑ A SEPA determination is pending with (lead agency). The expected decision date is ❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.)[help] ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. 10b. Indicate the permits you are applying for. (Check all that apply.) h[ el LOCAL GOVERNMENT Local Government Shoreline permits: ® Substantial Development ❑ Conditional Use ❑x Variance ❑ Shoreline Exemption Type (explain): Other City/County permits: ® Floodplain Development Permit ❑x Critical Areas Ordinance STATE GOVERNMENT Washington Department of Fish and Wildlife: ❑x Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —Attach Exemption Form You must submit a check for $150 to Washington Department of Fish and Wildlife, unless your project qualifies for an exemption or alternative payment method below. Do not send cash. Check the appropriate boxes ❑ $150 check enclosed. Check# Attach check made payable to Washington Department of Fish and Wildlife. ❑ My project is exempt from the application fee. (Check appropriate exemption): ❑ HPA processing is conducted by applicant funded WDFW staff. Agreement# ❑ Mineral prospecting and mining ❑ Project occurs on farm and agricultural land. (Attach a copy of current land use classification recorded with the county auditor,or other proof of current land use) ❑ Project is modification of an existing HPA originally applied for, prior to July 10, 2012. HPA# ORIA-16-011 Page 12 of 15 Washington Department of Natural Resources: ® Aquatic Use Authorization Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources. Do not send cash. Washington Department of Ecology: ❑x Section 401 Water Quality Certification FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ® Section 404 (discharges into waters of the U.S.) © Section 10 (work in navigable waters) United States Coast Guard permits: ❑ Private Aids to Navigation (for non-bridge projects) ORIA-16-011 Page 13 of 15 Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. h[�] 11 a. Applicant Signature (required) [help] I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby au tho a the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state th t I have the authority to grant access to the property. I also give my consent to the permitting agencies enteri the property where the project is located to inspect the project site or any work related to the project. (initial) Glenn Carlson, Commissioner 4404� GA-9 /-Avj Applicant Printed Name Applicant Signature Da e 11 b. Authorized Agent Signature hf elpl I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. Ann Boeholt June 28, 2017 Authorized Agent Printed Name Authorized Agent Signature Date 11 c. Property Owner Signature (if not applicant) hf elpl Not required if project is on existing rights-of-way or easements (provide copy of easement with JARPA). I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Art /", G aA'A) 6044"V J d�� 1 Property Owner Printed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious, or fraudulent statement or entry, shall be fined not more than $10,000 or imprisoned not more than 5 years or both. ORIA-16-011 Page 14 of 15 If you require this document in another format,contact the Governor's Office for Regulatory Innovation and Assistance(ORIA)at(800) 917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833- 6341. ORIA publication number: ORIA-16-011 rev. 09/2016 ORIA-16-011 Page 15 of 15 P�pN-STgT�coc` MASON COUNTY C DEPARTMENT OF COMMUNITY DEVELOPMENT Planning Division 2 oT z N Y ti 615 W Alder St, Shelton, WA 98584 �0 1864 (360)427-9670 MASON COUNTY ENVIRONMENTAL PERMIT October 10, 2017 PORT OF GRAPEVIEW PO BOX 3 GRAPEVIEW WA 98546 Parcel Number(s): 121055166001 Expiration Date: 10/10/2019 12:00:00 Date Issued: 10/10/2017 Case Number. MEP2017-00017 Project Description: PROJECT: FLOATING DOCK, ALUMINUM GANGWAY, CONCRETE BULKHEAD, DOCK EXTEND'S 16/' FROM CONCRETE WALL (FOR SHR2017-00004) The following critical areas are present on this property: Long-Term Commercial Forest xx FWHCA Ch. 17.10.060-1 Ch. 17.01.110-1 Mineral Resource Lands xx Frequently Flooded Areas Ch. 17.01.066-1 Ch. 17.01.090-1 Inholding Lands Landslide Hazard Areas Ch. 17.01.062-1 Ch. 17.01.100-1 Wetlands Seismic Hazard Areas Ch. 17.01.070-1 Ch. 17.01.102-1 Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080-1 Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. 10A)IH Authorized Local Government Official Date Conditions: 10/10/2017 Page 1 of 2 MEP2017-00017 MASON COUNTY ENVIRONMENTAL PERMIT 10/10/2017 Case No.: MEP2017-00017 No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of a development for which a permit has been granted has not begun within two years after approval, the Review Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon showing good cause, may extend the initial two year period by one year. No permit shall be extended unless the applicant has requested such review and extension prior to the exporation date. Signature Date OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) 10/10/2017 Page 2 of 2 MEP2017-00017