SHORELINE, CRITICAL AREAS, FEMA AND ESA
ASSESSMENT REPORT AND HABITAT MANAGEMENT
PLAN
PORT OF GRAPEVIEW DOCK- GRAPEVIEW LOOP ROAD
& GRISWOLD AVENUE
JUNE 2017
Soundview
Consultants
Envnonmental AssessmenL
Planning+Land Use Solutions
SHORELINE, CRITICAL AREAS, FEMA AND ESA
ASSESSMENT REPORT AND HABITAT MANAGEMENT
PLAN
PORT OF GRAPEVIEW DOCK- GRAPEVIEW LOOP ROAD
& GRISWOLD AVENUE
JUNE 29,2017
PROJECT LOCATION
GR.Wi.,vir.W Loop Rau)&GmsWoi.0 AvFNUP.
GR;\Pl Xll'W,WA 98546
PREPARED FOR
PORT OF GRAPEVIEW
ATTN:GLENN CARLSON
PO Box 3
Giuprv'iryv,«'A 98546
PREPARED BY
SOUNDVIEW CONSULTANTS LLC
2907 H.\RB0Rv'n,.W DRIFT,Surrr.D
Gic Hr1RBOR,Xvv'.\SI IINGTON 98335
(253) 514-8952
Soundview
Consultants
Environmental Assessment
Planning+Land Use Solutions
Executive Summary
Soundview Consultants LLC has been hired by HHJ Architects, PLLC and the Port of Grapeview
(Applicants) to provide a Shoreline and Critical Areas Assessment, Federal Emergency Management
Agency (FEMA) Floodplain Assessment and Endangered Species Act (ESA) Assessment, and
Habitat Management Plan for a 164-linear foot floating community dock with an access gangway
and sidewalk on an approximately 0.44-acre parcel located at Grapeview Loop Road and Griswold
Avenue in Grapeview, unincorporated Mason County, Washington (subject property). The subject
property is situated in the Southwest 1/4 of Section 5, Township 21 North, Range 01 West, W.M.
(Mason County Tax Parcel Number 12105-51-00900).
Soundview Consultants LLC investigated the subject property for wetlands,waterbodies, potentially
regulated fish and wildlife habitat, and/or priority species in the spring of 2017. Site investigation
identified the shoreline of Case Inlet, Puget Sound and a FEMA mapped flood zone along the
shoreline. A flood zone habitat assessment and mitigation plan is necessary to ensure the project
avoids, minimizes and/or compensates for impacts to the flood zone. No other streams, wetland,
drainages or sensitive Fish and Wildlife habitats or species were identified during site investigation.
The Washington Department of Fish and Wildlife (WDFW) has identified estuarine/marine aquatic
habitat in the vicinity of this shoreline area (Appendix 134). WDFW SalmonScape data does not
identify any priority species at the site's shoreline or any nearby tributaries with fish presence. The
marine shoreline is likely regulated by the U.S. Army Corps of Engineers (USACE), Washington
State Department of Ecology (WSDOE),and Mason County.
Impacts of a new overwater structure will be mitigated by avoiding and minimizing impacts to the
extent practicable. The overwater portions of the elevated and floating dock sections will be at
least 50% grated, to allow light to penetrate to the water. The joint use community dock will
minimize the need for additional individual or joint use docks for water access in the vicinity of the
Fair Harbor Marina. Unavoidable impacts will be compensated by restoring currently disrupted
intertidal shoreline habitat.
Regulatory requirements for the proposed community dock were carefully considered and identified
under Mason County Code (MCC) 17.50—Shoreline Master Program Use and Regulations and Title
8—Environmental Policy. Additionally, the subject property is within a 100-year flood zone,which
is regulated under MCC 14.22 — Flood Damage Prevention and 17.50.060 — Flood Protection and
Shoreline Stabilization. The marine shoreline is also likely regulated by the U.S. Army Corps of
Engineers (USACE) and Washington State Department of Ecology (WDOE).
1267.0004-Port of Grapeview Dock i Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Table of Contents
Chapter1. Introduction...................................................................................................................................1
Chapter2. Proposed Project...........................................................................................................................2
2.1 Project Location......................................................................................................................................2
2.2 Purpose and Need.................................................................................................................................3
2.3 Project Description................................................................................................................................3
2.4 Construction Techni ques.................................................................................................................3
2.5 Action Area.............................................................................................................................................4
Chapter3. Methods..........................................................................................................................................8
Chapter4. Existing Conditions.......................................................................................................................9
4.1 Landscape Setting..................................................................................................................................9
4.2 Soils..........................................................................................................................................................9
4.3 Vegetation...............................................................................................................................................9
4.4 Hydrology.............................................................................................................................................10
4.5 Priority Habitat and Species...............................................................................................................10
Chapter5. Case Inlet Shoreline....................................................................................................................11
5.1 Side-Yard Setback................................................................................................................................12
Chapter 6. Regulatory Considerations and FEMA Analysis....................................................................13
6.1 Mitigation Sequencing.........................................................................................................................13
6.2 Regulated Shoreline.............................................................................................................................14
6.3 FEMA Analysis....................................................................................................................................15
Chapter7. Species Information....................................................................................................................16
Chapter 8. Project Effects on ESA-Listed Species....................................................................................17
8.1 Direct and Short-Term Effects..........................................................................................................17
8.2 Short-Term Effects...............................................................................................................................18
8.3 Long-Term Effects..............................................................................................................................19
8.4 Determinations of Effect....................................................................................................................19
Chapter 9. Conceptual Habitat Management Plan....................................................................................26
9.1 Project Impacts....................................................................................................................................26
9.2 Construction Sequencing and Best Management Practices...........................................................26
9.3 Shoreline/Habitat Management Recommendations......................................................................27
Chapter10. Closure........................................................................................................................................28
Chapter11. References..................................................................................................................................29
1267.0004-Port of Grapeview Dock ii Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Figures
Figure 1. Vicinity Ma 2
Figure 2. Terrestrial Project Noise Attenuation to Ambient Levels. ................................................... 5
Tables
Table 1. Terrestrial Noise Attenuation Calculations............................................................................... 5
Table 2. Underwater Noise Attenuation Calculations............................................................................ 6
Table 3. Shoreline Information Summary..............................................................................................11
Table 4. ESA-Listed Species Potentially Found in Mason County and in Project Action Area.... 16
Table 5. Species Determination Summary.............................................................................................17
Appendices
Appendix A—Methods and Tools
Appendix B—Background Information
Appendix C—Site Plans
Appendix D—Action Area Map
Appendix E—Author Qualifications
Appendix F—Eelgrass and Macroalgae Survey Results Technical Memorandum
1267.0004-Port of Grapeview Dock iii Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 1. Introduction
Soundview Consultants LLC has been hired by HHJ Architects, PLLC and the Port of Grapeview
(Applicant) to provide a Shoreline and Critical Areas Assessment, Federal Emergency Management
Agency (FEMA) Floodplain Assessment and Endangered Species Act (ESA) Assessment, and
Habitat Management Plan for a 164-linear foot floating community dock with an access gangway
and sidewalk on an approximately 0.44-acre parcel located at Grapeview Loop Road and Griswold
Avenue in Grapeview, unincorporated Mason County, Washington (subject property). The subject
property is situated in the Southwest 1/4 of Section 5, Township 21 North, Range 01 West, W.M.
(Mason County Tax Parcel Number 12105-51-00900).
The purpose of this assessment is to identify the presence of potentially-regulated wetlands,
waterbodies, fish and wildlife habitat, and/or priority species that may be found on or near the
subject property; assess potential impacts upon any such critical areas and/or species from the
proposed project;and provide impact avoidance,mitigation,and management recommendations.
This report will be used to satisfy the following review processes and/or obtain the following
permits:
• U.S. Army Corps of Engineers Section 10 and Section 404 permits;
• Washington State Department of Ecology (WSDOE) Section 401 Water Quality
Certification;
• WDOE Coastal Zone Management(CZM) Consistency;
• Washington Department of Fish and Wildlife (WDFW) Hydraulic Project Approval;
• Mason County Environmental Permit;
• Mason County State Environmental Policy Act(SEPA) Review;and
• Mason County Shoreline Management Master Program — Shoreline Substantial
Development and Shoreline Variance Permits.
This report provides conclusions and recommendations regarding:
• Site description,project description,and area of assessment;
• Identification and assessment of potentially regulated wetlands, water bodies, fish and
wildlife habitat,and/or priority species located on or near the subject property;
• Site maps detailing existing site conditions, identified critical areas, and the proposed dock
construction;
• Identification of potential impacts to potentially-regulated features, priority habitat and
species,or associated buffers;and
• Potential regulatory considerations and habitat management recommendations.
1267.0004-Port of Grapeview Dock 1 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 2. Proposed Project
2.1 Project Location
The subject property is located at Grapeview Loop Road and Griswold Avenue in the town of
Grapeview, Mason County, Washington. The subject property is situated in the Southwest V4 of
Section 5, Township 21 North, Range 01 West, W.M. (Mason County Tax Parcel Number 12105-
51-00900).
To access the subject property from US-101 North, take the WA-3 North exit toward
Shelton/Bremerton and proceed for 3 miles. Turn right onto East Railroad Avenue and continue
for 299 feet. Turn left at the 1"cross street onto North Front Street and proceed for 0.2 mile. Turn
right onto WA-3 N/E Pine Street and continue for 5.1 miles. Turn right onto East Grapeview
Loop Road and proceed for 1.8 miles. Turn left and stay on East Grapeview Loop Road and
continue for 0.7 mile and your destination will be on the right.
Figure 1. Vicinity Map.
a
¢
SUBJECT PROPERTY `'°"°"
(Approximate)
6
o Rea Chi
Island
9nt,h
Pont
V i Pn4
Grapatriew
z' E Eckert Qa
Stretch
Island
N
W �
II
Source:Soundview Consultants LI-C
1267.0004-Port of Grapeview Dock 2 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
2.2 Purpose and Need
The proposed project will provide the community with a floating dock that provides public water
access and temporary moorage for individual and commercial users that will be launching boats at
the Port of Grapeview public boat ramp. The floating dock is not intended for overnight moorage
as it will bottom out at low tides, due to the bathymetry of this narrow channel; it will provide a
short term, temporary facility for boaters to moor while awaiting their turn to take out their boat or
to park their vehicle after launching.
2.3 Project Description
The proposed project is to construct a new 165-linear foot community dock consisting of a 48-foot
by 5-foot gangway and a 121-foot by 8-foot floating dock. The floating dock will consist of six (6),
20-foot by 8-foot pre-fabricated fiberglass sections with more than 50% grating. Each float section
will be supported by a 10-inch diameter steel pile.The waterward end of the dock will reach-4.3 feet
in elevation with the furthest waterward steel pile placed at -4 feet. A 48-foot by 5-foot grated
aluminum gangway with metal railings will be attached to the floating dock and supported by one
(1), 10-inch steel pile. A total of seven (7) piles are proposed for the entire dock. An 8-foot wide
section of the existing concrete bulkhead located at Ordinary High Water (OHW) will be replaced
with a new concrete wall section and footing (the "platform bulkhead"). Immediately landward of
OHW and the new bulkhead section, the gangway will connect to a new 8-foot by 8-foot, ADA
compliant, concrete platform with underground supports and wood railings. This platform will
connect further landward to a new 128-square foot concrete sidewalk,which will provide pedestrian
access (including ADA) from Griswold Avenue.
2.4 Construction Techniques
All pilings will be installed from the water, with a vibratory hammer mounted on a barge. Six (6),
prefabricated 20-foot by 8-foot floats with fiberglass grating will be floated in, connected, and
attached to the pilings after they are set in their final position. The landward end of the aluminum
gangway will attach, at OHW, to the pier platform. The waterward end will attach to the floating
dock. Installation of in-water elements will occur from a floating barge,during high tide.
Approximately 19 cubic yards of native soil/sediment will be removed immediately landward of
OHW to construct the pier foundation. Three concrete walls with footings will be poured in place;
one will be at the existing bulkhead (at OHW), and will replace the existing bulkhead (see section A
of sheet AP2.3). Two additional walls with footings will be poured perpendicular to the new
platform bulkhead. These three walls will form the foundation for the new pier platform. This will
be backfilled with clean, free draining, compacted gravel or CSBC (Crushed Surface Base Course),
and capped with compacted CSBC and a 4-inch thick concrete surface. The new ADA compliant
sidewalk will be poured in place concrete,over a prepared bed.
Best management practices (BMP) include the following:
1. Construction of over-water elements and installation of the piles will occur from a barge and
so will be completed during high tides. No grounding of the barge will be allowed. The
contractor will be required to submit a Construction/Tides Plan outlining possible work
dates and times that allow construction during the most desirable tidal period.
1267.0004-Port of Grapeview Dock 3 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
2. A coir log barrier shall be placed around the perimeter of the upland work area to prevent
sediments and debris from migrating waterward. This will be removed when the work is
completed or when the tide is flooding.
3. Work below OHW will only occur from January 1 through March 14 and July 1 through
December 31 of any consecutive year (i.e. a non-work window exists from March 15 and
June 30 for the protection of migrating salmonids potentially in the project vicinity during
that period).
4. The contractor shall develop and implement a site-specific spill prevention,containment and
control plan (SPCCP).
5. The movement and use of heavy or tracked machinery is restricted to the staging area.
6. Beach area grades disturbed during construction will be reshaped to pre-project conditions
upon project completion.
7. All construction equipment will be inspected daily for fluid leaks and no equipment will
leave the staging area until any leaks are repaired.
8. Fueling and maintenance of equipment will occur in upland staging areas only.
9. No excavated materials will be stockpiled below the OHW mark.
10.No materials shall be stockpiled outside of the staging area unless they will be used in that
day's work.
2.5 Action Area
The "Action Area" encompasses the locations where project activities will occur (the Project Area),
plus areas that may be directly or indirectly affected by the proposed project either through physical,
chemical, or biological mechanisms. The geographic limits of the Action Area were defined by
considering the potential spatial extent of mechanisms that may lead to impacts on listed species.
Mechanisms identified as having potential for impacting ESA-listed species or species habitat
include noise from construction equipment and a potential increase in turbidity from sediment in-
water suspension caused by construction activities. The Action Area for these potential impact
mechanisms is depicted in Appendix D.
2.5.1 Calculating Terrestrial Noise Attenuation
Calculations for the distance to terrestrial noise attenuation to ambient levels were conducted using
WSDOT Biological Assessment preparation methods (WSDOT, 2015). Terrestrial construction
noise sources will consist of a vibratory pile driver, an excavator, and a concrete pump truck.
Vibratory pile drivers are estimated to have a terrestrial noise level of 101 dB at 50 feet,and both an
excavator and concrete pump truck have a noise level of 81 dB per Table 7-4 of the WSDOT
Guidance (WSDOT,2015). Using decibel addition,it was determined that the combined noise level
of all construction equipment is 101 dB. The normal attenuation rate of 6 dB per doubling distance
for a hard site was applied to provide a conservative estimate because the site is adjacent to water,
residential areas, and a main road (East Grapeview Loop Road) that are considered reflective
surfaces that do not provide much attenuation.
Using 101 dB as the noise impact level along with an ambient level of 61 dB (WSDOT, 2015)
considering the noise level for traffic volume for East Grapeview Loop Road that has a speed limit
of 40 miles per hour (mph) and a likely traffic volume (vehicles/hour) of 250, the following table
and graph present the estimated construction noise attenuation distance. This analysis results in
attenuation to ambient noise levels at 5,000 feet from the Project Area, which is demonstrated in
Table 1 and graphically depicted in Figure 2. From the table and trend line equation on the chart an
1267.0004-Port of Grapeview Dock 4 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
estimated perimeter for the terrestrial action area would denoted by a radius of 5,482 feet beyond
the Project Area.
Table 1.Terrestrial Noise Attenuation Calculations.
Terrestrial Attenuation Table and Sites
Distance from Source Construction Noise Background Noise Measured Noise Pressure
Feet (Miles) dBA) (dBA (Micro-Pascals) (arm)
50 0.009469697 101 61 2244036.909 2.27359E-07
100 0.018939394 95 61 1124682.65 1.1395E-07
200 0.037878788 89 61 563676.5863 5.71101E-08
400 0.075757576 83 61 282507.5089 2.86228V?08
800 0.151515152 77 61 141589.1569 1.43454E-08
1600 0.303030303 71 61 70962.67785 7.18973E-09
3200 0.606060606 65 61 35565.5882 3.6034E-09
6400 1.212121212 59 61 17825.01876 1.80598E-09
12800 2.424242424 53 61 8933.671843 9.05134E-10
25600 4.848484848 47 61 4477.442277 4.53642E-10
Figure 2. Terrestrial Project Noise Attenuation to Ambient Levels.
Terrestrial Attenuation for Hard Sites
120
100
q 80 _
u
> 60
--*-Background Noise
c -*-Construction Noise
to 40
20
y= -8.6561n(x)+ 134.86
0
30 500 5000 50000
Distance (feet)
2.5.2 Calculating In-Water Noise Attenuation
To minimize in-water impacts, only vibratory pile driving methods will be used for in-water pile
installation and only seven, 10-inch in diameter pile will be used. To determine the Action Area
impacted by the sound from the vibratory hammer, an in-water sound area model was created. The
aquatic sound Action Area occurs in Case Inlet, South Puget Sound,where it is constrained by land
1267.0004-Port of Grapeview Dock 5 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
masses on all sides. Calculations were conducted using noise methods outlined in the WSDOT
Biological Assessment preparation manual (WSDOT,2015).
In-water construction will consist of vibratory pile driving of seven, 10-inch diameter steel pile.
Using WSDOT Biological Assessment preparation methods,vibratory pile drivers emit sound levels
10-20 dB below that of impact pile drivers. The WSDOT guidance document, for a 12-inch steel
pile,recommends a value of 173 dB (RMS) at a distance of 10 meters (32.81 feet) for a vibratory pile
driver. This is used here as conservative comparison, as the guidance does not provide noise
estimates for driving 10-inch pile using vibratory pile driving methods. WSDOT guidance suggests
that background sound levels be compared to that of previous WSDOT noise analysis studies within
the Puget Sound. The ambient underwater noise level for the project site will be estimated using the
ambient underwater noise level for a site on Vashon Island,which has an underwater noise level of
128 dB.
Applying the normal attenuation rate of 4.5 dBA per underwater doubling distance results in an
attenuation line as demonstrated below in Table 2 and displayed in Figure 3. From the table, the
calculated perimeter for the in-water Action Area would extend to approximately 33,592 feet (6.4
miles); however, the underwater noise will reach land on all sides prior to this calculated distance.
The underwater noise Action Area would be constrained by land rather than attenuated in all
directions to a maximum distance of approximately 12,000 feet (2.3 miles) to the northeast, just
north of Rocky Bay.
Table 2. Underwater Noise Attenuation Calculations.
Vibratory Water Attenuation Table
Construction Noise Background Noise
Distance from Source Measured Noise Pressure
Feet Miles dB (dB) (Micro-Pascals) atm
32.81 0.006214015 173 128 8933671843 0.000905134
65.62 0.01242803 168.5 128 5321450120 0.000539154
131.24 0.024856061 164 128 3169786385 0.000321154
262.48 0.049712121 159.5 128 1888121753 0.000191299
524.96 0.099424242 155 128 1124682650 0.00011395
1049.92 0.198848485 150.5 128 669930878.3 6.78755E-05
2099.84 0.39769697 146 128 399052463 4.04308E-05
4199.68 0.795393939 141.5 128 237700445.5 2.40831E-05
8399.36 1.590787879 137 128 141589156.9 1.43454E-05
16798.72 3.181575758 132.5 128 94339300.69 8.54502E-06
33597.44 6.363151515 128 128 50237728.63 5.08994E-06
67194.88 12.72630303 123.5 128 29924713.12 3.03189E-06
134389.76 25.45260606 119 128 17825018.76 1.80598E-06
1267.0004-Port of Grapeview Dock 6 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Figure 3. Underwater Project Noise Attenuation to Ambient Levels.
Underwater Attenuation Table
200 _
180
160
- 140
b
120
100
—*--Construction Noise
c80 --*—Background Noise
0) 60 -
7 { _ s i _ -6.4921n(x) + 195.66
20
50 500 5000 50000 500000
Distance(feet)
2.5.3 Turbidity
The proposed construction activities may incidentally suspend sediment materials in the marine
waters adjacent to the project site. Such occurrences, if at all, would be temporary in duration. To
avoid or minimize potential temporary increases in turbidity, all appropriate temporary erosion and
sediment control (TESC) measures and construction best management practices (BMPs) will be
implemented.
The Washington Administrative Code (WAC 173-201A-210(1)(e)) makes allowances for temporary
turbidity in marine waters due to construction activities. Temporary mixing is subject to constraints
of WAC 173-201A-400(4) and (6). A 150-foot plume limit is being included in the Action Area to
account for possible temporary increases in turbidity. Any turbidity impacts are expected to be
temporary due to the conservation measures and BMPs that will be in place for the project, and will
comply with WAC 173-201A-400(4) and (6).
1267.0004-Port of Grapeview Dock 7 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 3. Methods
SVC investigated and assessed shoreline conditions and potentially-regulated wetlands, waterbodies,
and other fish and wildlife habitat within the subject property and identified critical areas within 250
feet of the subject property, according to the standards set forth in Mason County Code (MCC)
Title 8.52.
In January, April, and June of 2017, qualified SVC staff conducted onsite assessments. All
determinations were made using observable vegetation,hydrology,and soils in conjunction with data
collected from the U.S. Geographic Survey (USGS) topographic map, the Natural Resources
Conservation Service (MRCS) Soil Survey, National Wetlands Inventory (NWI), U.S. Fish and
Wildlife Service (USFWS), Washington Department of Fish and Wildlife (WDFW), Department of
Natural Resources (DNR), Washington Department of Ecology (WSDOE), Mason County
Geographic Information Systems (GIS), local precipitation data (NOAA), and various
orthophotographic resources. Appendix A contains further details for the methods and tools used
to prepare this report.
Wetland presence/absence was determined in accordance with MCC 8.52.110,and as outlined in the
U.S. Army Corps of Engineers'Wetlands Delineation Manual (Environmental Laboratory, 1987) as
modified according to the guidelines established in the Regional Supplement to the Corps of
Engineers Wetland Delineation Manual: Western Mountains,Valleys,and Coast Region,Version 2.0
(USACE,2010).
The fish and wildlife habitat assessment was conducted during the same site visits by qualified fish
and wildlife biologists. Experienced biologists made visual observations using stationary and
walking survey methods for both aquatic and upland habitats noting any special habitat features or
signs of fish and wildlife activity.
A low tide beach survey for submerged aquatic vegetation and other aquatic organisms and features
was completed on May 27, 2017, per WDFW guidance, entitled Eelgrass/Macroalgae Habitat
Interim Survey Guidelines (06/16/2008) (Appendix F).
The OHW mark was made using the Washington State Department of Ecology's (Ecology) method
detailed in Anderson, P.S., S. Meyer, P. Olson, and E. Stockdale, 2016, Determining the Ordinary High
Water Mark for Shoreline Management Act Compliance in Washington State (Anderson, P.S., et al.) and the
definitions established in the Shoreline Management Act (Revised Code of Washington [RCW]
90.58.030(2)(b) and Washington Administrative Code (WAC) 173-22-030(11)).
1267.0004-Port of Grapeview Dock 8 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 4. Existing Conditions
4.1 Landscape Setting
The subject property is in an urban residential setting, in unincorporated Mason County and
includes approximately 28 linear feet of nearly horizontal marine shoreline located along Case Inlet
of Puget Sound. A community concrete ramp is currently on the subject property shoreline
extending out into Case Inlet and encumbering portions of the south adjoining property. Existing
upland features include a paved access road (Griswold Avenue) to the existing ramp. The shoreline
consists of a coarse pebble substrate in the upper intertidal zone transitioning to very coarse, rocky
substrate in the lower intertidal zone. Quarry spalls have been placed on the shoreline on the north
of the existing concrete ramp. The intertidal area shows signs of sorting and shifting of finer
substrate, suggesting there is a moderate degree of tidal energy being exerted. The shoreline is
moderately populated with small mollusks and other macroinvertebrates (red rock crab, ghost
shrimp, mud snail, moon snail). Sea lettuce (Ulva sp) was observed attached to and growing within
the beach substrate, but the shoreline lacks any significant rooted, vascular plant species. Adjacent
properties to the north are developed with single-family residences, to the east by Case Inlet, to the
south by Fair Harbor Marina and associated structures, which provides boat moorage for
recreational boaters, fuel for motorized boats and grocery/gift shopping, and to the west by East
Grapeview Loop Road. The adjoining properties that abut Case Inlet to the north and south
contain hardened shorelines encumbered by concrete bulkheads with upland vegetation consisting
predominantly of ornamental grass with some ornamental trees and shrubs. A storm drainage pipe
extends out from the north adjoining concrete bulkhead, just north of the existing ramp with water
draining out onto the surface of the shoreline and into Case Inlet.
Topography on the upland is approximately 20 feet above mean sea level (amsl) with a gentle slope
to the east toward Case Inlet. A topographic map is provided in Appendix B1.
4.2 Soils
The Natural Resource Conservation Service identified one soil series on the subject property,
Alderwood gravelly sandy loam, 8 to 15 percent slopes. This soil formed in ridges and hills with a
parent material consisting of glacial drift and/or glacial outwash over dense glaciomarine deposits.
In a typical profile, the surface consists of gravelly sandy loam from 0 to 7 inches below ground
surface (bgs). The subsurface consists of very gravelly sandy loam from 7 to 59 inches bgs. A soil
map is provided in Appendix B2.
4.3 Vegetation
Upland portions of the subject property do not contain any vegetation, as it consists primarily of a
paved road (Griswold Avenue). Shoreline areas at the subject property lack any significant rooted,
vascular plant species although there is a small patch of salt tolerant emergent vegetation in the
vicinity of the stormwater outfall: an area measuring approximately 30 square feet contains small
clumps of pickleweed (Salicornia tirginica) and seaside plantain (Plantago maritima). Several species of
marine algae were observed including sea lettuce (Ulna sp) and red algae (Odonthalia floccose).
1267.0004-Port of Grapeview Dock 9 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
4.4 Hydrology
4.4.1 Streams and Wetlands
The Mason County Streams and Wetlands map and the USFWS NWI map identifies estuarine and
marine wetlands within Case Inlet adjacent to the site (Appendix's B3 and B4); however, the site
investigation did not observe such habitats. The DNR Stream Typing map and WDFW
SalmonScape map did not identify any potentially regulated streams within the subject property or
vicinity (Appendix's B5 and B6).
4.4.2 FEMA Mapped Flood Area
The Mason County Flood Zone map indicates that a portion of the project is within a special flood
hazard area, subject to inundation by the 1% annual chance of flood (100-year flood). A Mason
County Flood Zone map is provided in Appendix B7.
4.5 Priority Habitat and Species
The WDFW Priority Habitat and Species (PHS) map and data identify the potential for estuarine
and marine wetlands and a purple martin breeding area. One purple martin breeding area location
was identified at the Fair Harbor Marina, which is the south adjoining property and is listed with a
candidate status, which is not identified as endangered, threatened, or sensitive. For management
recommendations for the purple martin, the PHS map and data has a link that will direct to habitat
management documentation written by WDFW(Appendix B8). WDFW Forage Fish and Spawning
map and SalmonScape map did not identify any fish species or spawning areas within the subject
property or vicinity (Appendix B6 and B9). The WSDOE Shoreline Biology map identified patchy
eelgrass fringes, patchy salt marsh fringes, and patchy low marsh fringes on the shoreline of the
subject property (Appendix B10). The site investigations did not indicate any estuarine and marine
wetlands or any significant plant species within the shoreline area of the subject property.
1267.0004-Port of Grapeview Dock 10 SOund47ew Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 5. Case Inlet Shoreline
The subject property abuts approximately 28 linear feet of the marine shoreline of Case Inlet within
Puget Sound. The shoreline environment for this area is designated by Mason County as Urban
Residential, with requirements found under MCC Title 17.50.074. Although background
information (Appendix B-4- NWI Map and Appendix B10—WSDOE Shoreline Biology Map)
indicates estuarine and marine wetlands, patchy eelgrass fringes, patchy salt marsh fringes, and
patchy low marsh fringes located within the shoreline at the subject property, the site investigations
did not observe such habitats. The shoreline at the subject property consists of a coarse pebble
substrate in the upper intertidal zone transitioning to very coarse, rocky substrate in the lower
intertidal zone. The intertidal area shows signs of sorting and shifting of finer substrate, suggesting
there is a moderate degree of tidal energy being exerted. The shoreline is moderately populated with
small mollusks and other macroinvertebrates,but lacks any significant rooted,vascular plant species.
Several species of marine algae were observed including sea lettuce (Ulva sp) and red algae
(Odonthalia floccose). The subject property has been used as a community ramp extending out into
Case Inlet for at least 60 years. Case Inlet is used as a boat thruway with Fair Harbor Marina located
on the south adjoining property. Such uses of Case Inlet have caused significant degradation to
ecological functions within the shoreline of the subject property and surrounding areas. No priority
species or potential spawning habitat for forage fish (sand lance, surf smelt, and Pacific herring) is
identified in the project vicinity. Table 3 provides a detailed summary of the shoreline at the site.
Table 3. Shoreline Information Summary.
REGULATED SHORELINE HABITAT INFORMATION SUMMARY
Location: Along the northeastern boundary of the subject property.
Water Body Case Inlet,Puget Sound
WRIA 14—Kennedy-
Goldsborou h
_ Local jurisdiction Mason County
Shoreline Urban Residential
Desi ation
Side-Yard Setback 5 feet
Potential estuarine and
PHS Documented marine wetlands and
Habitat associated aquatic habitat
along the shoreline to the
east of the project area
Location of Shoreline The shoreline is located on the east portion of the subject property where the
Relative to Project proposed project is to take place.
The side-yard consists of a coarse pebble substrate in the upper intertidal zone
Side-Yard Condition transitioning to very coarse, rocky substrate in the lower intertidal zone.
uar s alls were added directly abutting the existing concrete ramp.
Priority Species Present Purple Martin
1267.0004-Port of Grapeview Dock 11 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
5.1 Side-Yard Setback
The shoreline at the site is regulated under MCC Title 17.50. Pursuant to MCC 17.50.060 - Use
Regulations and the Case Activity Listing issued by Mason County, commercial development at the
site requires a 5-foot side-yard setback beginning at OHW and extending into upland areas.
1267.0004-Port of Grapeview Dock 12 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 6. Regulatory Considerations and FEMA
Analysis
The site investigation identified the shoreline of Case Inlet within Puget Sound on the subject
property. The project proposes to develop a new 165-linear foot dock. Regulatory requirements
within Mason County Code (MCC) Title 17.50 — Shoreline Master Program Use Regulations and
MCC Title 8 — Environmental Policy were considered with respect to the proposal. Additionally,
the subject property is within a 100-year flood zone, which is regulated under MCC 14.22 — Flood
Damage Prevention and 17.50.060 — Flood Protection and Shoreline Stabilization. The marine
shoreline is also regulated by USACE and WSDOE.
6.1 Mitigation Sequencing
MCC 8.52.170 requires that a sequence of actions be taken for proposals that have the potential to
impact shorelines. Projects should first attempt to avoid impacts altogether by not taking certain
actions. If a project cannot eliminate those actions, then the project should reduce impacts by
limiting the degree of the action, using different technology or by taking steps to minimize impacts.
For impacts that cannot be avoided or reduced, projects should propose measures for rectifying and
minimizing the adverse impacts through compensation by replacing, enhancing, or providing
substitute resources or environments. Mitigation actions should also be monitored and appropriate
corrective measures taken. The sections below describe the mitigation sequencing steps conducted
for this project.
Avoidance
The proposed dock is a water-dependent use consisting of an overwater structure, for which impacts
cannot be avoided. As a result, reduction and compensation measures will be implemented to
minimize impacts caused by the proposed project.
Minimization
To reduce potential long-term impacts to shoreline functions, the gangway and floating dock
sections will by grated to allow sunlight to penetrate to the surface water and shoreline bed under
the structure. The number (7) and diameter (10-inches) of piles are the minimum necessary to
support the gangway and floats. The piles will be steel rather than creosoted or treated wood, and
they will be driven by vibratory, rather than impact hammer. Furthermore, because the proposed
dock is a community-use dock,it will likely reduce the need for individual and joint-use docks in the
area.
Compensation
To compensate for the unavoidable impacts to shoreline habitat, drift logs will be installed and
anchored south of the boat ramp, in an area measuring approximately 1,600 square feet. Native
shoreline vegetation will be installed among the drift logs. In addition, approximately 200 square
feet of the upper shoreline (landward of OHW) will be planted with native shore-friendly shrubs and
emergent plants. The removal of the existing angular rock (approximately 1,538 square feet) will
restore the beach substrate to natural conditions that will be better able to support marine
macroinvertebrates and migrating fishes.
1267.0004-Port of Grapeview Dock 13 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
6.2 Regulated Shoreline
The shoreline environment for the subject property and surrounding area is designated Urban
Residential under MCC 17.50.074. Docks are regulated under MCC 17.50.060,which indicates that
a recreational community dock length may not exceed the lesser of 15 percent of the fetch or 115
feet from the OHW mark and will not exceed a depth of-5 feet as measured at the mean lower low
water (MLLW) mark. The width of the dock will not exceed 8 feet.
Floating structures will be a minimum of 8 inches above the surface of the water and will include
intermittent supports to keep structures off the tidelands at low tide. Community use docks may be
permitted on the property line without a side yard setback. Recreational development under MCC
17.50.060 requires that recreational facilities will make adequate provisions, such as screening, buffer
strips, fences, and signs, to prevent overflow and to protect the value and enjoyment of adjacent or
nearby private properties. All permanent recreational structures and facilities will be located outside
officially mapped floodways; however, the county may grant exceptions for non-intensive accessory
uses. The shoreline at the site is regulated under MCC Title 17.50. Pursuant to MCC 17.50.060 -
Use Regulations and the Case Activity Listing issued by Mason County, commercial development at
the site requires a 5-foot side-yard setback beginning at OHW and extending into upland areas.
The project proposes a dock that is 8 feet wide but that would extend 165-linear, exceeding the
maximum length allowed for a community dock by approximately 45 feet. To achieve reasonable
use at the community dock, the dock must be long enough to reach water levels deep enough to
sustain a docked boat for a sufficient period of time. According to a topographic survey conducted
at the subject property, the dock will need to be extended out to 165-linear feet from OHW in order
to reach a depth of-4.3 feet (HHJ Architects PLLC 2017). The dock will still completely ground
during the lowest of tides, but this length of dock will provide reasonable (temporary) moorage
opportunities while not extending out so far as to impact navigation or to extend beyond that
afforded neighboring docks (at Fair Harbor Marina to the south). A Shoreline Variance will be
necessary to grant relief from the dimensional standards set forth in the shoreline master program
(MCC 17.50.090).
The proposed dock will require a Shoreline Substantial Development Permit and a Shoreline
Variance. According to MCC 8.52.170, granting of a Mason County Environmental Permit is
predicated upon the project incorporating measures to mitigate and compensate for impacts through
a Habitat Management Plan. Additionally, a SEPA determination, a Hydraulic Project Approval,
and Federal Clean Water Act(CWA),Sections 10 and 404 permits will be required.
WSDOE documented a leaking underground storage tank (LUST) on the south adjoining property
at Fair Harbor Marina and approximately 80 feet southwest of the proposed dock (Cleanup Site ID
6309, per WSDOE's online Cleanup Site Search). The LUST was first identified with leaking 200
gallons of diesel fuel and contaminating soils in 1990. The fuel was reported to have migrated to an
eastern retaining wall in a 4-foot by 4.5-foot area where bioremediation took place. In 1992,
approximately 75 cubic yards of contaminated soil was removed after a 2,000-gallon underground
storage tank (UST) was removed. Soil and groundwater samples were collected after the
contaminated soil excavation and all contaminants were below detection levels. In 2007, a
subsurface investigation conducted by Sound Environmental Strategies reported the historic
removal of two 1,000-gallon USTs and one current 4,000-gallon UST containing gasoline. Seven
soil samples were collected up to a depth of 16 feet bgs. Contaminants within the soil samples were
1267.0004-Port of Grapeview Dock 14 Soundview•Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
identified below clean-up levels. Groundwater was collected; however, an insufficient quantity was
collected. In 2008,WSDOE changed the site status to "Reported Cleaned Up".
A previous SEPA determination for the installation of a ramp at the subject property raised concern
about the potential to disturb any potential contaminated soils from the past LUST at Fair Harbor
Marina (south adjoining property). Best Management Practices (BMPs) regarding special handling
with regards to the previous LUST were recommended. These BMPs are addressed in the mitigation
section of this report (see Chapter 9).
Bedland below Mean Low Water (MI..W) is owned by the Washington State Department of Natural
Resources (DNR). The proposed dock will encroach over DNR bedlands and will require an
Aquatic Lands Lease.
6.3 FEMA Analysis
The shoreline at the subject property consists of coarse pebble substrate in the upper intertidal zone
transitioning to very coarse, rocky substrate in the lower intertidal zone. Quarry spalls are upon the
shoreline, directly adjacent to the existing concrete ramp to the north and south. Adjoining
shoreline areas contain hardened shorelines encumbered by concrete bulkheads. A portion of the
subject property is described as a frequently flooded area per MCC 8.52.130 (Appendix B7), and
because development of the proposed dock is below the base flood elevation, a floodplain
development permit is required before construction begins within any area of special flood hazard
areas. Under provisions for flood hazard reduction, all new construction will be anchored and
constructed using methods and practices that minimize flood damage (MCC 14.22.160). According
to MCC 8.52.170, permits will only be granted if the project takes appropriate measures to mitigate
and compensate for impacts through a Habitat Management Plan.
The proposed project will not have an adverse effect upon shoreline resources and uses at the
subject property or any adjoining properties. The proposed project will not result in increased flood
heights,additional threats to public safety,extraordinary public expense,or create any nuisances.
1267.0004-Port of Grapeview Dock 15 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 7. Species Information
Based on data from National Oceanic and Atmospheric Administration (NOAA) Fisheries,US Fish
and Wildlife Service (USFWS),and the Washington State Department of Fish and Wildlife (WDFVi)
Priority Habitats and Species (PHS) and SalmonScape data, several species listed under the
Endangered Species Act (ESA) are found in Mason County and were considered when investigating
listed species presence for the proposed project.
Soundview Consultants LLC has prepared a BE (detailed in Chapter's 7 and 8) on behalf of the
Applicant in order to fulfill requirements of MCC 8.52.170 and Section 7 of the Endangered Species
Act (ESA), which requires that Federally approved actions do not jeopardize ESA-listed species or
Critical Habitat. Table 4 outlines ESA-listed species that may be found within Mason County and
within the action area for subject proposal. The recommended determination of effect due to the
proposed project actions are discussed in Chapter 8.
Table 4. ESA-Listed Species Potentially Found in Mason County and in the Project Action
Area.
Species Name Common Name Federal Listing Status Likely within
Action Area
Me
gaptera novaeangliae Humpback Whale Endangered Yes
Oninus orca Southern Resident Killer Endangered Yes
Whale
Oncor nchus m kiss Puget Sound Steelhead Threatened Yes
Oncorbyncus tshanytscba Puget Sound Chinook Threatened Yes
Salmon
Salvelinus con uentus Bull Trout Threatened Yes
Sebastes pa&ispinis Bocaccio Rockfish Endangered Yes
Sebastes ruberrimus Yelloweye Rockfish Threatened Yes
Dermoche s conacea Leatherback Sea Turtle Endangered No
Strix occidentalis caurina Northern Spotted Owl Threatened No
Brach ram bus marmoratus Marbled Murrelet Threatened Yes
Canis lupus Gray wolf Endangered No
Lynx canadensis Canada 1 nx Threatened No
Eupb
ydr)w editha to Lori Taylor's checkers of Threatened No
Enmopbila a!estns strigata Streaked Homed Lark Threatened No
Coc ryus americanus Yellow Billed Cuckoo Threatened No
Rana ntiosa Oregon Spotted Frog Threatened No
Tbomo s maryama spp. Mazama Pocket Go her Threatened No
1267.0004-Port of Grapeview Dock 16 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 8. Project Effects on ESA-Listed Species
This chapter includes an analysis of project affects to ESA-listed species that have potential for
presence in the project action area. The species assessed include marbled murrelet, humpback
whale, steelhead trout (Puget Sound distinct population segment), chinook salmon (Puget Sound
evolutionary significant unit), killer whale (southern resident distinct population segment),bull trout,
bocaccio rockfish,and yelloweye rockfish.
Potential project impacts are evaluated based upon specific habitat components that would be
altered or removed and the degree to which such alteration may occur; the abundance and
distribution of the habitat components; the distribution and population levels of the species (if
known); the possibility of direct or indirect impacts to the species and/or habitat, and the potential
to mitigate for adverse effects. These determinations are summarized in Table 5.
Table 5. Species Determination Summary.
Determination
Species Name Common Name Determination of of Effects upon
Effects Critical
Habitat
Megaptera novaeangliae Humpback Whale No Effect -----
On anus orca Southern Resident Killer Whale MA/NLAA MA/NLAA
Oncorbyncbus mykiu Puget Sound Steelhead MA/NLAA No Effect
Oncorhyncus tsbauytscba Puget Sound Chinook Salmon MA/NI,AA MA/NLAA
Salvelenus confluentus Bull Trout No Effect -----
Sebastes paudspinis Bocaccio Rockfish MA/NLAA -----
Sebastes ruberrimus Yelloweye Rockfish MA/NLAA -----
Dermocbe s con'acea Leatherback Sea Turtle No Effect -----
Stnx ocadentalis caunna Northern Spotted Owl No Effect -----
Braebyrampbus marmoratus Marbled Murrelet MA/NLAA No Effect
Canis lupus Gray wolf No Effect ----
Lynx canadensis Canada lynx No Effect ----
Euphydgas editba taylori Taylor's checkerspot No Effect -----
Eremopbila a5estns stngata Streaked Homed Lark No Effect -----
Coeg-,us americanus Yellow Billed Cuckoo No Effect -----
Rana pretiosa Oregon Spotted Frog No Effect -----
Tbomomys matiama spp. Mazama Pocket Gopher No Effect -----
8.1 Direct and Short-Term Effects
The proposed project actions have three mechanisms for direct and short-term impacts to the
Action Area: temporary increases in terrestrial and underwater noise and a potential increase in
turbidity from in-water suspension of sediment from construction activities (primarily pile driving).
1267.0004-Port of Gnpeview Dock 17 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
BMP's will be utilized during construction actions, including installation and maintenance of silt
fencing, controlling sediment movement out of construction accesses, and covering disturbed soils
when not being worked. Noise from construction activities could directly impact terrestrial and
aquatic ESA-listed species if present.
8.2 Short-Term Effects
8.2.1 Sound
As previously discussed in Section 2.5.1, impacts to the local environment from project noise may
occur within a 5,000-foot terrestrial radius of the Project Area. The estimated sound level from the
use of project machinery is higher than the estimated ambient sound level for the traffic volume
from East Grapeview Loop Road. Noise from project activities can adversely affect wildlife with
various behavioral and/or health-related consequences (WSDOT, 2015). Sounds affect marine
species differently. Pulse noise, such as impact pile driving, has a greater likelihood of affecting fish
behavior when compared to continuous noise. Vibratory hammers produce noise levels that are
typically 10-20 dB less than an impact hammer(WSDOT,2015).
The ambient underwater noise level for the project site is estimated using the ambient underwater
noise level for a site on Vashon Island, which has a background underwater noise level of 128 dB.
As previously discussed in Section 2.5.2, the underwater construction noise will attenuate at 33,592
feet (6.4 miles); however, the underwater noise will reach land on all sides prior to this calculated
distance. The underwater noise Action Area would be constrained by land rather than attenuated in
all directions to a maximum distance of approximately 12,000 feet (2.3 miles) to the northeast, just
north of Rocky Bay.
Per WSDOT's 2015 Biological Assessment preparation guidance, the current threshold for fish
injury is 206 dB peak. The threshold for impacting fish behavior is 150 dB RMS (Root Mean
Square); for cetaceans and pinnipeds, vibratory pile driving methods can disturb individuals at 120
dB RMS. The WSDOT underwater sound impacts fish calculator is applicable to impact pile driving
strike peaks. This model is not applicable to this project as only vibratory pile driving methods will
be used for driving in-water pile. Noise for vibratory pile driving will not exceed the threshold for
injury to fish, cetaceans, or pinnipeds; however, if a fish or marine mammal is within the Action
Area during pile driving actions the species could be exposed sound levels that may impact behavior.
8.2.2 Turbidity
Increased turbidity due to pile driving activities is expected to be localized and temporary. The
proposed construction activities may incidentally suspend sediment materials in the marine waters
adjacent to the project site. WAC 173-201A-210(1)(e) makes allowances for temporary turbidity in
marine waters due to construction activities. Temporary mixing is subject to constraints of WAC
173-201A-400(4) and (6). A 150-foot plume limit is being included in the Action Area to account
for possible temporary increases in turbidity. Any turbidity impacts are expected to be temporary
due to the conservation measures and BMPs that will be in place for the project, and will comply
with WAC 173-201A-400(4) and (6).
1267.0004-Port of Grapeview Dock 18 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
8.3 Long-Term Effects
The project is located on a portion of a parcel that is approximately 0.44-acres in size and located on
the shoreline of Case Inlet in Puget Sound. The overall effect will involve the installation of seven,
10-inch steel pile, permanently displacing 12.36 square feet of upper intertidal beach substrate and
approximately 483 square feet of new overwater shading from the 48-foot by 5-foot gangway and
121-foot by 8-foot dock, both with 60 percent grated surfaces in the upper intertidal shoreline. No
other long-term impacts to species or species habitat are anticipated.
8.4 Determinations of Effect
8.4.1 Critical Habitat
Critical Habitat is defined as: (1) The specific areas within the geographical area occupied by the
species, at the time it is listed in accordance with the Act, on which are found those physical or
biological features (a) essential to the conservation of the species and (b) which may require special
management considerations or protection, and (2) Specific areas outside the geographical area
occupied by the species at the time it is listed, upon a determination such areas are essential for the
conservation of the species. Critical Habitat for a listed species contains Primary Constituent
Elements (PCEs),as defined below.
8.4.2 Primary Constituent Elements
In accordance with Section 3(5)(A)(i) of the ESA,and regulations at 50 CFR 424.12(b),to determine
which were areas occupied at the time of listing (for Critical Habitat designation), we consider the
physical or biological features (known as the PCEs) essential to the conservation of the species and
that may require special management considerations or protection. These include, but are not
limited to: (1) space for individual and population growth for normal behavior; (2) food, water, air,
light, minerals, or other nutritional or physiological requirements; (3) cover or shelter; (4) sites for
breeding, reproduction, or rearing(or development) of offspring; and (5) habitats that are protected
from disturbance or are representative of the historical,geographical, and ecological distributions of
a species.
8.4.3 Species Determinations
The Action Area is in Tidal Reference Area 2 (Olympia) in Case Inlet. The work window for
salmon is July 2-March 2 and Bull trout is July 16—February 15. The work window for all fish is July
16 through February 15. Construction of all project elements will occur within that window—
between July 16 and February 15 of any consecutive years. The following ESA-listed species may
experience project effects as described below.
Marbled Munelet and Marbled Murrelet Critical Habitat
Brachyrhampus marmoratus—Threatened,listed 1992
Critical Habitat designated May 1996(SO CFR Part 17.11)
Marbled murrelet are members of the Alcidae family of seabirds, which includes puffins, murres,
and auklets. In the state of Washington, they are year-round residents on coastal waters. They
primarily feed in waters within 500 feet of the shore out to 1.2 miles from shore, at depths of less
than one hundred feet. Preferred prey includes small fish and crustaceans. Nestlings may be fed
larger fish. Nests and roosts are found in mature and old growth forests of western Washington.
1267.0004-Port of Grapeview Dock 19 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Nest trees are typically greater than thirty-two inches diameter at breast height, with nesting
preference on large flat conifer branches, often covered with moss (WDFW, 1991) and found in old
growth forests. Marbled murrelets have been found in the largest numbers in marine waters near
the coastal waters surrounding the Olympic Peninsula(Pearson and Lance,2010). Marbled murrelet
are more sparsely distributed elsewhere in this region. Prey species predominantly include the forage
fish sand lance, surf smelt, and Pacific herring. Critical habitat has been designated in Oregon and
California. USFWS, 2011, discusses Primary Constituent Elements of Critical Habitat for marbled
murrelets: (1) trees with potential nesting platforms and, (2) forested areas within '/2 mile of potential
nest trees with a canopy height of at least'/2 of the site potential tree height.
The Action Area contains no suitable nesting habitat for the marbled murrelet. Foraging habitat
may be found in the Puget Sound as marbled murrelet are opportunistic feeders. However,lack of
suitable habitat and the high level of human use of the Action Area make marbled murrelet presence
in the Action Area unlikely. Neither species presence nor supporting habitat is identified within the
subject property. The most likely presence of marbled murrelet would be from the species passing
over the Action Area en-route to foraging sites.
Noise resulting from project activities will be below precautionary harassment/injury guidelines for
ESA-listed species that may be present in the proposed project area. The estimated threshold of
harassment/injury for marbled murrelets is approximately 92 dBA at nest sites and at a nesting site
the disturbance threshold is an estimated 70 dBA (WSDOT,2015). Noise levels from the proposed
construction may be as high as 174 dBA at 107 feet from project activities but will attenuate to
background noise levels at 995,344 feet. The proposed actions May Affect, but are Not Likely to
Adversely Affect the Marbled Murrelet. No critical habitat or essential habitat elements are found
within the vicinity of the Action Area (USFWS, 2011); there will be No Effect on Marbled
Murrelet Critical Habitat.
Humpback Whale
Megapten novaeanglise—Endangered,listed June 2, 1970.
Humpback whales range from southern California, north through the Aleutian Islands while feeding
in the Pacific Ocean (NMFS, 1991). While humpback whales are more likely to remain in waters on
the outer coast during their migration, there have been several sightings within Puget Sound as
recently as May 27, 2017. However, due to the unlikelihood of humpback whales entering this far
into Case Inlet and the complete lack of suitable habitat in the vicinity of the Action Area, the
project will have No Effect on Humpback Whale.
Puget Sound Steelhead Trout
Oncotbynchus mykiss--Threatened,listed May 11,2007.
Critical habitat designated February 2016(81 FB9251).
Puget Sound steelhead trout are documented within Puget Sound. National Oceanic and
Atmospheric Administration (NOAA) Fisheries identified fifteen (15) Distinct Population Segments
PPS) of steelhead trout in Washington, Oregon, and California, divided into two (2) basic
reproductive ecotypes, based on the state of sexual maturity at the time of river entry (summer or
winter) and duration of spawning migration. Steelhead trout are iteroparous, meaning they can
spawn more than once. Steelhead trout can spend up to seven (7) years in freshwater prior to
smoltification (USACE, 2007). The Distinct Population Segment (DPS) in the Puget Sound
includes all naturally spawned anadromous winter-run and summer—run steelhead populations in
streams in the river basins of the Strait of Juan de Fuca,Puget Sound,and Hood Canal,Washington
1267.0004-Port of Grapeview Dock 20 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
bounded to the west by the Elwha River and to the north by the Nooksack River and Dakota Creek,
as well as the Green River natural and Hamma Hamma winter—run steelhead hatchery stocks.
Puget Sound Steelhead trout populations are considered "Depressed". Therefore, due to depressed
populations, the presence of steelhead trout in the Action Area during proposed project activities is
likely minimal.
Per WSDOT's 2014 Biological Assessment models, the current threshold for fish injury is 206 dB
peak. The threshold for impacting fish behavior is 150 dB RMS. Due to the lack of presence of
steelhead trout from depleted species and the proposal to complete all work during periods when
the project area is dry, the proposed project actions May Affect, but are Not Likely to Adversely
Affect Puget Sound Steelhead Trout.
Critical Habitat has been designated for Puget Sound steelhead trout as of February, 2016.
Ecological features that support steelhead trout habitat include (i) water quality and quantity
conditions and forage,including aquatic invertebrates and fishes, supporting growth and maturation,
and (ii) natural cover such as submerged and overhanging large wood,aquatic vegetation,large rocks
and boulders, and side channels. These habitat characteristics are not currently present at the
existing Port of Grapeview boat ramp and Fair Harbor Marina area. The proposed actions will have
No Effect on Critical Habitat for Puget Sound Steelhead Trout.
Puget Sound Chinook Salmon
Oncorh7ncbus tscbswytsba --Threatened,listed (reaffirmed)June 28,2005 (70FR37160).
Critical habitat designated September 2,2005(70FR52630).
Puget Sound Chinook Salmon are anadromous fish, meaning adults migrate from the ocean to
spawn in freshwater lakes and streams where their offspring hatch and rear prior to migrating back
to the ocean to forage until maturity. Fry and smolts will stay in freshwater environments for up to
eighteen (18) months before moving to downstream estuaries. They will spend up to one-hundred
and ninety days in estuaries before moving into ocean waters. Juvenile Chinook out-migrating from
outlying watersheds could also potentially use the Action Area from late March to mid July, as
indicated by sampling studies from the Tacoma Narrows and Commencement Bay.
Chinook salmon spend an average of three to four years in marine waters before returning to their
natal streams to spawn, which occurs in late summer to late fall. Their range is from Kotzebue
Sound,Alaska down to Santa Barbara, California. Many of the rivers located within their range are
used for Chinook spawning and rearing. Major runs can be found on the Columbia River, Rogue
River and within Puget Sound.
As juveniles, Chinook feed on insects, amphipods, and other crustaceans and will feed primarily on
other fish as adults. During early life stages mortality is high due to natural predation and
anthropogenic habitat changes including siltation, increases in water temperature, low oxygen, and
reduced stream flows. Fall Chinook populations in the Central and South Puget Sound regions are
primarily sustained through hatchery production (NMFS, 2012b). Indigenous populations have
diminished from habitat degradation, over-fishing, and the use of hatchery fish in the ecosystem.
Chinook are highly valued by the commercial fishery.
Due to the low likelihood of juvenile Chinook salmon in the Project Area during the proposed
actions,the ability of adults to avoid the area during the actions,the brief duration of sound impacts,
1267.0004-Port of Grapeview Dock 21 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
and the minimization measures, the proposed project actions May Affect, but are Not Likely to
Adversely Affect Puget Sound Chinook Salmon.
Turbidity is expected to be localized and temporary. The project effects are not likely to result in
any adverse effects to habitat for Chinook salmon. The proposed project actions May Affect, but
are Not Likely to Adversely Affect Puget Sound Chinook Salmon Critical Habitat.
Southern Resident Killer Whale—
Orcinus orca--Endangered,listed November 15,2005.
Critical Habitat designated November 2006.
Southern resident killer whale may be found in the Puget Sound or the Straits of Georgia and Juan
de Fuca during spring through fall. The website, www.orcanetwork.org, lists sightings near the
vicinity of the Action Area as "infrequent", however, killer whale may be found in South Puget
Sound from November through January and sightings have been reported in Carr Inlet as recently as
May 2017. A southern resident killer whale sighting compilation between 1990 and 2008 (Osborne,
2008) has compiled data regarding the average number of killer whale sightings per month over an
eighteen (18) year period. Due to unlikely presence of Southern Resident Killer Whales in the
Action Area, the short duration of sediment and noise impacts, and because turbidity is expected to
be localized and temporary, the proposed actions May Affect, but are Not Likely to Adversely
Affect Southern Resident Killer Whales.
Almost the entire Puget Sound has been designated as Critical Habitat for southern resident killer
whale, excluding areas that are less than twenty (20) feet deep during periods of high tide (NMFS,
2012a). Under the ESA "Critical habitat" is defined as: (1) specific areas within the geographical
area occupied by the species at the time of listing, if they contain physical or biological features
essential to conservation, and those features may require special management considerations or
protection; and (2) specific areas outside the geographical area occupied by the species if the agency
determines that the area itself is essential for conservation". It is unlikely that a southern resident
killer whale will enter this far north within Case Inlet or come this close to shore unless it is sick or
dying. Therefore, the proposed project May Affect, but is Not Likely to Adversely Affect
Southern Resident Killer Whale Critical Habitat.
Bull Trout
Salvelinus conBuentus--Threatened,listed November 1, 1999.
Critical Habitat designated October 2010 (75FR63898).
Bull trout are documented within Mason County, but have not been documented in any streams
within the Action Area. Moreover, bull trout are not known to use Puget Sound waters west of the
Nisqually Reach. Due to the lack of presence of bull trout in the action area, project actions will
have No Effect on Bull Trout.
Bocaccio Rockfish Sebastes paucispinis—listed Endangered July 27,2010;and
Yelloweye rockfish Sebastes entomelas—listed Threatened July 27,2010.
Presence of adult rockfish within the Action Area is unlikely as no habitat features are present to
attract these fish. Rockfish larvae are pelagic, often occupying the surface of open waters, under
floating algae, detached seagrass, and kelp. Juvenile bocaccio rockfish settle onto nearshore water
habitats with rocky or cobble substrate that support kelp growth at three (3) to six (6) months of
age, and move to progressively deeper waters as they grow (Love et al. 1991;Love et al. 2002). The
likelihood of juveniles or adults of ESA-listed rockfish within the relatively shallow and non-rocky
1267.0004-Port of Grapeview Dock 22 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
habitats of the project is discountable. Juvenile yelloweye rockfish do not typically occupy intertidal
waters and shallow habitats (Love et al. 1991). Adult bocaccio rockfish and yelloweye rockfish
typically occupy waters deeper than 120 feet (Love et al. 2002) and are unlikely to occur at the
project location.
Bocaccio rockfish have not been documented in the Puget Sound since 2001,although it is assumed
that an extant population exists (NMFS 2008a). Yelloweye rockfish are considered relatively rare in
the Puget Sound,observed more frequently in north Puget Sound than in southern areas (Miller and
Borton 1980). Juvenile rockfish recruitment is likely to be found in areas with shallow high —relief
zones with crevices and sponge gardens (Love et al 2002). Juveniles move from shallow rocky reefs
to deeper pinnacles and rocky habitats as they mature (NMFS 2008a). Adults are most common
between 300 to 600 feet water depth, sometimes associated with depths between 40 to 1,560 feet
deep (Love et al 2002). The existing substrate along the shoreline of the project is not ideal habitat
for rockfish recruitment and juvenile rearing which is typically associated with vegetated
(recruitment) and deeper hard substrate (rearing) high-relief deep-water habitat. The proposed
Project Area water quality conditions also likely limit the habitat suitability for juveniles. Deeper
portions of Puget Sound provide suitable habitat for adult and juvenile rockfish.
The limited potential for occurrence of rockfish within the Action Area may include drift larval and
small juvenile forms that could potentially be present within the Puget Sound waters during the
summer months. Any project effects to larval forms of rockfish are anticipated to be highly unlikely.
Due to lack of rockfish habitat features and minimal, temporary nature of sediment impacts
proposed, the proposed project May Affect, but is Not Likely to Adversely Affect these
Distinct Population Segments of Rockfish.
Several ESA- listed species listed in Tables 4 and 5 will not be found on or near the vicinity of the
Action Area. The proposed project is surrounded by moderately developed areas within a rural
residential area. Even though the species in Tables 4 and 5 may occur in Mason County,it is highly
unlikely that these animals will be found in the vicinity of the Action Area. The ESA-listed species
clearly not affected due to project location and surrounding environment conditions include,
streaked horned lark, yellow-billed cuckoo, Oregon spotted frog, Northern spotted owl, gray wolf,
Canada lynx,Taylor's checkerspot,leatherback sea turtle,and Mazama pocket gophers.
• The streaked horned lark (Eremophila a pestris strigata) is found primarily in prairie habitat or
unvegetated to sparsely-vegetated open habitats (WSDOT,2015). They can be found in
developed areas such as airports and agricultural lands. No habitat for this species is found
in the vicinity of the project;therefore,the project will have No Effect on Streaked
Horned Lark.
• Yellow-billed cuckoo (Coat'.Zus americanus) are migratory birds and historically ranged from
British Columbia to northern Mexico. Approximately 17 sightings in Washington have been
reported between 1956 and 2012, 13 of those sightings were east of the Cascades (WDFW,
2012). The yellow-billed cuckoo generally prefers riparian habitat of 50 acres or more
(WDFW,2012). Due to a lack of suitable habitat within the vicinity of the project area, the
project will have No Effect on Yellow-Billed Cuckoo.
• The Oregon spotted frog (Rana pretiosa) is endemic to the Pacific Northwest and spends the
majority of life in water. Often the Oregon spotted frog can be found in emergent wetlands
1267.0004-Port of Grapeview Dock 23 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
with willow, standing water. Warm, marshy areas are preferable, with an abundance of
emergent or floating vegetation, which is used for cover and forging (Watson, et.al. 2000).
As the Oregon spotted frog appears to be a freshwater species primarily associated with
wetland habitat and as no suitable habitat exists within the vicinity of the project area, the
project will have No Effect on Oregon Spotted Frog.
• Northern spotted owl (Strix occidentalis caurina) preferred habitat is found in mature
coniferous forests. Habitat for northern spotted owl was not identified within the subject
property (USFWS, 2008). It is more likely that Northern spotted owl would be encountered
within the North Cascades National Park where approximately 18,200 acres of habitat areas
for northern spotted owl habitat exist (University of Washington, 2006). No habitat for this
species is found in the Action Area;therefore,the project will have No Effect on Northern
Spotted Owl.
• Gray wolf (Canis lupus) generally inhabits temperate forests, mountains, tundra, taiga and
grassland environments. While they are somewhat habitat generalists, Gray Wolves do
require ungulate prey or other wild animals for scavenging. In addition, they require a large
amount of space (minimum of 10,000 to 13,000 square km)with low road density to support
a viable population (USFW, 2017). Because the Action Area and vicinity are highly
populated and densely urbanized areas, no habitat for the Gray Wolf exists in Action Area;
therefore,the project will have No Effect on Gray Wolf.
• The Canada lynx (Lynx Canadensis) in North America follows the distribution of boreal forest
ecosystems and ranges the south up into the subalpine forest of the western U.S. as well as
into the boreal/hardwood forests of the eastern U.S. Their populations persist in areas with
deep snow and have a large population of snowshoe hares, which is the main prey of the
lynx (USFW, 2017). No habitat for this species is found in the Action Area; therefore, the
project will have No Effect on Canada Lynx.
• The Taylor's checkerspot (Euphydryas editha taylorz) is found primarily in open prairie and
grass/oak woodland habitat (WSDOT, 2015). Taylor's checkerspot habitat is dependent
upon food sources for larvae and nectar sources for adults. No habitat for this species is
found in the vicinity of the project; therefore, the project will have No Effect on Taylor's
Checkerspot.
• Leatherback sea turtles (Dermochelys coriacea)are the most migratory and widely distributed of
all sea turtles,adult females require sandy beaches with vegetation and a short distance to dry
sand for nesting, and in general, the species prefer beaches that have close proximity to
rough seas and deep water. (USFW, 2017). Because the species is so migratory, critical
habitat has been designated in areas as far as the U.S. Virgin Islands, and has also been
designated along the shores in areas of California,Oregon and Washington,all the way up to
British Columbia but due to the urbanization of the area and lack of preferred habitat or
nesting beaches in the project area, their presence is highly unlikely; therefore, the project
will have No Effect on Leatherback Sea Turtle.
• Mazama pocket gophers (Thomomys maZama gladalis, Thomomys maZama pugetensis, Thomomys
maZama tumuli and Thomomys maZamayelmensis) require specific types of soils for their habitat.
1267.0004-Port of Grapeview Dock 24 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
These soils must allow them to tunnel into the ground and must be well-drained and easily-
crumbled. Soil types identified onsite by an NRCS survey identify Harstine gravelly sandy
loam and Hydraquents onsite,none of which are suitable soil types for Roy Prairie, Olympia,
Tenino and Yelm pocket gophers. In addition, the area surrounding the subject property is
fully developed and occupied by residential uses. Fragmentation of suitable habitat for
Mazama pocket gophers in historically occupied areas means that populations are not able to
move around easily, so even if suitable habitat existed onsite, it would be isolated and
surrounded by development; therefore, the project will have No Effect on Mazama
pocket gophers.
1267.0004-Port of Grapeview Dock 25 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 9. Conceptual Habitat Management Plan
This Habitat Management Plan assures that the proposed dock will not degrade the functions and
values of any associated critical areas.
Pursuant to MCC 8.52.170(g)(1), bank stabilization projects require a Habitat Management Plan
(HMP). MCC 8.52.1700) Habitat Management Plan Requirements states:
A HMP shall consider measures to preserve and protect the wildlife habitat and shall consider effects of land
use intensity, buffers, setbacks, impervious surfaces, erosion control and retention of natural vegetation on the
functions and values of the FWHCA. This report shall idenfifi, how the impacts from the proposed use or
activity will be avoided or mitigated through habitat mitigation which meets the purposes of this
chapter... For those projects requiring the preparation of a biological assessment (BA) or biological
evaluation (BE)as part of the application for a Corps of Engineers permit, the approved BA or BE meets
the requirements of a HMP.
9.1 Project Impacts
The proposed project could adversely affect Fish and Wildlife Habitat Conservation Areas or
Priority Species with direct and short-term actions: temporary increases in terrestrial and underwater
noise and a potential increase in turbidity from in-water suspension of sediment from construction
activities (primarily pile driving).
Long term adverse impacts could result from a new overwater structure shading a portion of the
intertidal zone and interfering with fish migration along the shoreline. The floating dock could also
impede natural sediment transport processes. The proposal will involve the installation of seven, 10-
inch steel pilings, permanently displacing 12.36 square feet of upper intertidal beach substrate and
approximately 483 square feet of new overwater shading from the 48-foot by 5-foot gangway and
121-foot by 8-foot dock,both with 60 percent grated surfaces in the upper intertidal shoreline.
9.2 Construction Sequencing and Best Management Practices
Most of the construction associated with this project shall occur landward of the OHW. Intertidal
work is limited to demolition of a section of the existing bulkhead and replacement with a new
platform bulkhead,and installation of seven (7) 10-inch diameter pilings. Bulkhead work shall occur
during low tides; installation of pilings will occur from a floating barge, during high tides.
Installation of the gangway and floating dock sections will be accomplished by floating in these pre-
fabricated elements and attaching them,while working from a floating barge.
The contractor will be required to submit a Construction/Tides Plan outlining possible work dates
and times that allow construction of all portions of the project during the applicable tide. It is
possible that some work may need to be conducted during the evening hours, as that is when low
tides occur during the proposed construction window.
A coir log barrier shall be placed around the perimeter of the work area to prevent sediments and
debris from migrating waterward. This will be removed when the work is completed or tide is
1267.0004-Port of Grapeview Dock 26 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
flooding. Work below the Ordinary High Water mark (OHW) shall only occur from January 1
through March 14 and July 1 through December 31 of any year. The contractor shall develop and
implement a site-specific spill prevention, containment and control plan. The movement and use of
heavy or tracked machinery is restricted to the staging area. Beach area grades disturbed during
construction will be reshaped to pre-project conditions upon project completion.
All construction equipment will be inspected daily for fluid leaks and no equipment will leave the
staging area until any leaks are repaired. Fueling and maintenance of equipment will occur in upland
staging areas only. If barge equipment is to be used, no grounding will be allowed. No excavated
materials will be stockpiled below ordinary high water (OHW). No materials shall be stockpiled
outside of the staging area unless they will be used in that day's work.
The proposed pilings are the minimum necessary to secure the proposed floating dock, given the
currents within this waterway and the anticipated tension and pressure from boat usage. Minimizing
piling diameter will significantly reduce potential underwater construction noise during piling
installation.
The floating dock will be comprised of fiberglass grating that allows more than 50% of the light to
penetrate (i.e more than 50%grated).
9.3 Shoreline/Habitat Management Recommendations
Mitigation of the proposed floating dock begins with avoiding and minimizing impacts. Minimal
work will occur over or within the water, because the pier to which the gangway attaches, will be
landward of OHW. Only the gangway and floating dock (together comprising a dock that is 165-
feet long) will extend into the water of Case Inlet. The new floating dock will be grated, to allow
light penetration. The presence of a community dock will minimize the need for additional joint-use
and individual docks within the vicinity of Grapeview and Reach (Treasure) Island, Case Inlet.
Additional compensatory mitigation will include shoreline planting, installation (and anchoring) of
drift logs, and removal of angular rock currently upon the beach at this location. Together these
measures will improve the quality of shoreline habitat at the Port of Grapeview property.
1267.0004-Port of Grapeview Dock 27 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 10. Closure
The findings and conclusions documented in this report have been prepared for specific application
to this project. They have been developed in a manner consistent with that level of care and skill
normally exercised by members of the environmental science profession currently practicing under
similar conditions in the area. Our work was also performed in accordance with the terms and
conditions set forth in our proposal. The conclusions and recommendations presented in this
report are professional opinions based on an interpretation of information currently available to us
and are made within the operation scope, budget, and schedule of this project. No warranty,
expressed or implied, is made. In addition, changes in government codes, regulations, or laws may
occur. Due to such changes,our observations and conclusions applicable to this site may need to be
revised wholly or in part.
1267.0004-Port of Grapeview Dock 28 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Chapter 11. References
Anderson,P.S., S. Meyer,P. Olson,and E. Stockdale, 2016. Determining the Ordinary High Water Mark
for Shoreline Management Act Compliance in Washington State. Publication No. 16-06-029. Final
Review Draft. Shorelands and Environmental Assistance Program, Washington State
Department of Ecology. Olympia,Washington.
Brinson,M. M., 1993. "A hydrogeomorphic classification for wetlands,"Technical Report WRP-
DE-4,U.S.Army Engineer Waterways Experiment Station,Vicksburg,MS.
Cooke, S.S. 1997. Wetland Plants of Western Washington. Seattle Audubon Society. Seattle,
Washington.
Cowardin, L.M., V. Carter, F. Golet, and E.T. LaRoe. 1979. Classification of Wetlands and
Deepwater Habitats of the United States. U.S. Fish&Wildlife Service.Washington D.C.
Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual. Technical
Report Y-87-1,US Army Engineer Waterways Experiment Station,Vicksburg,Mississippi.
Granger,T.,T. Hruby,A. McMillan, D. Peters,J. Rubey,D. Sheldon, S. Stanley,E. Stockdale,2005.
Wetlands in Washington State - Volume 2: Guidance for Protecting and Managing Wetlands. Washington
State Department of Ecology. Publication#05-06-008. Olympia,WA. [April 2005].
GeoResources,LLC,2016. Draft Geotechnical Engineering Report.July 15,2016.
Hitchcock,C.L. and A. Cronquist. 1973. Flora of the Pacific Northwest. University of Washington
Press. Seattle,Washington.
HHJ Architects PLLC, 2017. Record of Survey - Topographical Map for the Grapeview Boat
Ramp.
Hruby,T,2014. Washington State Wetland Rating System for Western Washington—2014 Update.
Washington State Department of Ecology Publication# 14-06-029.
Lichvar,R.W.,M.Butterwick,N.C.Melvin,and W.N. Kirchner,2014.The National Wetland Plant
List: 2014 Update of Wetland Ratings. Phytoneuron 2014-41: 1-42.
Mason County,2017. Case Activity Listing-Case#: PAR2017-00007—Parcel#: 121055100900.
Mason County Code,2016. Data accessed from website: http://rvww mrsc.org/codes aspx.
Munsell® Color,2000. Munsell soil color charts. New Windsor,New York.
Natural Resources Conservation Service, 2015. Hydric Soils List Mason County, Wasbington. U.S.
Department of Agriculture. Washington D.C.
National Marine Fisheries Service (NMFS),2017. Data accessed from website:
http://www.nmfs.rioaa.gov/pr/species/.
1267.0004-Port of Grapeview Dock 29 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Ness, A.O., 1960. Soil Survey of Mason County, Washington. Natural Resources Conservation
Service. September 1960.
Reed,P.B.,Jr., 1988. National List of Plant Species That Occur in Wetlands.•National Summary. U.S. Fish
&Wildlife Service. Biol. Rep. 88 (26.9).
Reed, P.B.,Jr., D. Peters,J Goudzwaard, I. Lines, and F. Weinmann, 1993. Supplement to National
List of Plant Species That Occur in Wetlands. Northwest Region 9. U.S. Fish & Wildlife Service.
Supplement to Biol. Rep. 88 (26.9).
Sheldon, D., T. Hruby, P. Johnson, K. Harper, A. McMillan, T. Granger, S. Stanley, and E.
Stockdale, 2005. Wetlands in Washington State - Volume 1: A Synthesis of the Science. Washington
State Department of Ecology. Publication#05-06-006. Olympia,WA. [March 2005].
U. S. Army Corps of Engineers, 2008. Clean Water Act Jurisdiction Following the U.S. Supreme Court's
Decision in Rapanos v. United States&Carabell v. United States. EPA/USACE. December 2,2008.
U.S. Army Corps of Engineers. 2010. Regional Supplement to the Corps of Engineers Wetland Delineation
Manual• Western Mountains, Valleys, and Coast Region (Version 2.0), ed.J. S. Wakeley,R. W. Lichvar,
and C. V. Noble. ERDC/EL TR-10-3. Vicksburg, MS: U.S. Army Engineer Research and
Development.
U.S. Department of Agriculture, Natural Resources Conservation Service, 2010. Field Indictors of
Hydric Soils in the United States, Version 7.0. L.M. Vasialas, G.W. Hurt, and C.V. Noble (eds.).
USDA,NRCS,in cooperation with the National Technical Committee for Hydric Soils.
Washington Department of Fish and Wildlife, 2008. Eelgrass/Macroalgae Habitat Interim Survey
Guidelines. Revised 06/16/008.
Washington Department of Fish and Wildlife, 1991. Management Recommendations for
Washington's Priority Habitats and Species. May 1991.
Washington Department of Fish and Wildlife, 2008. Priority Habitat and Species List. Olympia,
Washington. 177 pp.
Washington State Department of Ecology, 2016. Toxics Cleanup Letter for Fair Harbor Marina.
Washington State Department of Ecology.
Washington State Department of Ecology, 1997. Washington State Wetlands Identification and Delineation
Manual. Washington State Department of Ecology. Publication#96-94.
Washington State Department of Ecology, U.S. Army Corps of Engineers Seattle District, and U.S.
Environmental Protection Agency Region 10, (Ecology) 2006a. Wetland Mitigation in Washington
State—Part 1:Agency Policies and Guidance (Version 1). Washington State Department of Ecology.
Publication#06-06-011a. Olympia,WA.
1267.0004-Port of Grapeview Dock 30 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Washington State Department of Transportation,2015. Biological Assessment Preparation Advanced
Training Manual Version 02-2015. Data accessed from website:
http://wrvw wsdotwagovlEnvironment/Biology/BA/BAguidance.htm#Manual.
1267.0004-Port of Grapeview Dock 31 Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix A - Methods and Tools
Parameter Method or Tool Website Reference
Wetland Washington State http://www.ecy.wa. Ecology. 1997. Washington state wetland
Delineation Wetland gov/biblio/9694.ht identification and delineation manual. Publication
Delineation ml #96-94. Washington Department of Ecology,
Manual Olympia,WA.
USACE 1987 http://el.erdc.usace. Environmental Laboratory. 1987. Corps of
Wetland army.mil/elpubs/pd Engineers Wetlands Delineation Manual. Technical
Delineation f/wlman87.pdf Report Y-87-1,US Army Engineer Waterways
Manual Experiment Station,Vicksburg,Mississippi.
Western http://www.usace.a U.S.Army Corps of Engineers.2008.Interim
Mountains, rmy.mil/ew/cecwo Regional Supplement to the Corps of Engineers
Valleys,and Coast /reg/inte_aridwest_ Wetland Delineation Manual:Western Mountains,
Region Interim sup.pdf Valleys,and Coast Region,ed.J.S.Wakeley,R.W.
Regional Lichvar,and C.V.Noble.ERDC/EL TR-08-13.
Supplement Vicksburg,MS:U.S.Army Engineer Research and
Development Center.
Shoreline Federal Ordinary http://www.usace.a Congressional Federal Register 33 Part 328 Definition
Delineation High Water Mark nny.mil/inet/fiincti of Waters of the United States.
Definition ons/cw/cecwo/reg
/33cfr328.htm
Wetland Northwest(Region http://www.fws.go Reed,P.B.Jr. 1988. National list of plant species that
Indicator 9)(Reed,1988) v/nwi/bha/list88.ht occur in wetlands: Washington. Biological Report
Status and Northwest ml NERC-88/18.47 for National Wetlands Inventory,
(Region 9) Washington,D.C.
Supplement(Reed Reed,P.B.Jr.1993. Northwest supplement(Region
et al.,1993) 9)species with a change in indicator status or added to
the Northwest 1988 list,wetland plants of the state of
Washington 1988. U.S.Department of Interior Fish
and Wildlife Service WELUT-88(26.9),Washington,
D.C.
Plant Names USDA Plant http://plants.usda.g Website(see Appendix A)
Database ov/
Soils Data NRCS Soil Survey http://websoilsurve Website GIS data based upon:
y.nres.usda.gov/app Ness,A.O. 1960.Soil Survey of Mason County,
/WebSoilSurvey.asp Washington. United States Department of Agriculture,
x Soil Conservation Service in cooperation with
Washington State Department of Natural Resources,
and Washington State University,Agriculture Research
Center. Washington,D.C.
Hydric Soils Mason County http://www.nres.us Natural Resources Conservation Service.2015.
Data Hydric Soils List da.gov/wps/PA_N Hydric Soils List:Mason County,Washington. U.S.
RCSConsumption/ Department of Agriculture. Washington D.C.
download?cid=stelp
rdb1248596&ext=xl
sx
Threatened Washington http://wdfw.wa.gov Priority Habitats and Species(PHS)Program
and Priority Habitats /hab/phspage.htm (Data produced 08/13/2009). Map of priority habitats
Endangered and Species and species in project vicinity. Washington
Species Department of Fish and Wildlife(WDFW).
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Parameter Method or Tool Website Reference
WDFW GIS Data http://wdfw.wa.gov Website
/mapping/salmons
cape/
Species of Mason County http://www.mrsc.o Mason County Code Titles 8,14,and 17
Local Code rg/codes.aspx
Importance
Toxics Washington State https://fortress.wa. Website
Cleanup Department of gov/ecy/gsp/SiteSe
Ecology archPage.aspx
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix B - Background Information
This appendix includes a Mason County Topographic Map (B1), NRCS Soil Survey Map (B2),
Mason County Streams and Wetlands Map (B3), USFWS NWI Map (B4),DNR Stream Typing Map
(B5), WDFW SalmonScape Map (B6), Mason County Flood Zone Map (B7), WDFW PHS Map
(B8),WDFW Forage Fish and Spawning Map (B9),and WSDOE Shoreline Biology Map (B10).
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
A endix B1—Mason Coun To o ra hic Ma
r
t'
♦
r
t
a
Subiect Piapesn-
• i.�i�pra�:tt�lce
,T". 1
20 It Cc f11OUt5 jwtloleo
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix B3—Mason County Streams and Wetlands Map
k
i
l 1
.L
Y�
n
Firvers and Streams
National Wtellands
Inventory
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix B2-NRCS Soil Survey Map
Son Mai--manor.Courty.'Vastungton
G �
� R
,r JaL +"r,K a.av n/EO t�aL 6�� • 5'xY ��l[rJ �wU
Subject Propelm '
!-ipprOS1I11.1:P:
1
� P•sue � �, -�
I
r
Qaq k
P
.rn<h Idq Map Unit Legend
1,w0 D'A�0 lf6L 112a! C�29f 'J1.SD -
Ma1nn c o.nY.Mi++�,ngrnn iv.�t,a5.
4
J `rG"ot.1.1.OfGfPmmA IYYUNt/�bl J-N,m. n—:r,Ap tiwratolA01
fi
A .rase ,_ a�n e o I s p.aeti awps
L `w Im 3M Im Toter t-Ana d IM—a LA 1NlY
'app0�1 VAK"EIGOgI can moan"S'Nchm L�06 UrM dote!PI W-EN
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix B4—USFWS NWI Map
Soundview Consultants - USFWS NWI Map
i�
I"
Subject P'topeln-
a I
F 11*1
J t�
ss/
!1
r
I
Apul 13,2017 14514
u uuae t.0 L14 n
Wetlands Feshwdtei E^nelyenl Welland . Lake I— r x 1--.11 i, , ,, -4_ ,_ s
D 00425 OM U 17 kmEstLanneand Maine Deepwater .
F,eshwater FaresledLihruh VJedand ❑ CYhar
❑ :stt aloe and Ma-ire Aetland
❑ Freshwatnr Pond ■ Rverinc
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix B5—DNR Stream Typing Map
Soundview Consultants- DNR Stream Typing Map
t,
5uhj '
t Approxintaltt�'
4"A
r
r�inl 13,1U1 i 1:4,514
0 00]0 007 414 in
DNR•Stream Typing --�---
Type N.Np.Ns 0 0.0425 0085 01'bn
a.C...J,gr�U '�&'C—G—FAH-'CNqJAW..
fSS.LSCA.JSGS.b:rG 41D KN none M Unr C-to
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix B6—WDFW SalmonScape Map
Soundview Consultants- WDFW SalmonScape Map
EIect Property
prosimate)
i
I
Ppfil 13 2017 1:4.514
0 0.135 0.07 C14m
Ali SalmonScape 51v?nac '
0 00425 0085 0.17 bn
9w�a•fau,Kmfr CO.—,ne,"qs I,u amen P C.p.awco
UBM.GO,WS.NNCAN.CnW—Kf.eWa•10 N1.0-8.,n .
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix B7—Mason County Flood Zone Map
I-'0!)wCt plopexr;
��1pf0`'1321a CP
j
r
s -
a
a
X !
® 1%Chance Annual Flood
2011 NAIP Asnal Photos
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix B8—WDFW PHS Map
Soundview Consultants - WDFW PHS Map
..r
Ppnl 14,2017 1.9,D28
0 C.075 015 Dam
• pi POLY �—,
AS MAPPED o C075 0.15 03 M,
-N 5ana [r.,Dy.wA...C—iv =_...-Gmy4 Ica CNES'AI..
EX,JLA,VB35./ ARO.Cv/,—W,36 Uw,Cw—ItV
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Common Name i Scientific Name Priority Area Display Feature Full Record
Resolution Type
Purple martin show Progne subis Breeding Site AS MAPPED Point Show Full
Record
Estuarine and Marine Show Full
Wetland show Null Aquatic Habitat AS MAPPED Area Record
.....................................
Item ;Value
Common Name Purple martin
Scientific Name Progne subis
Priority Area Breeding Site
Display Resolution AS MAPPED
Federal Status N/A
State Status Candidate
SGCN Y
PHS Listing Status PHS LISTED OCCURRENCE
Source Date 8/14/2013
Source Dataset WS_OccurPoint
Source Record 79318
Source Entity WA Dept. of Fish and Wildlife
Source Name Null
Geometry Type Points
Accuracy 1/8 mile (Quarter/Quarter
Section)
Sensitive Data N
Site Name FAIR HARBOR MARINA
Mgmt Recommendations Click Here
More Info Null
Notes Null
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and habitat Management Plan .June 29,2017
Appendix B9 -WDFW Forage Fish and Spawning Map
Soundview Consultants - WSDFW Forage Fish and Spawning Map
Su-biecr Proper t"
Apprositxlnte
t
r
y
/+pnl 13,207 1:4.514
0 0.035 0of 0.14 nr
rr Savo Lanco Spawning Pro spa vnor Hoff ing Holoing A,eas
0 00425 00e5 0.1 T a
Srie1�pewninq .,.�ewury uoco c.r.r c.gAn a fo•aon KI-4
o�.•r��s+T xau4.wo
Heauiy Spamliny
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix B10—WSDOE Shoreline Biology Map
Soundview Consultants - WSDOE Shoreline Biology Map
{
1tTvieCl'PLf^�lP:`lj`
�J7J.TCC':1171;1te
1
t
Apnl 13.2011 14514
EMprassFlinge Ealsnss®sds Sao Mash Mnan Sat Marsh bed low Man_ I us�.av � ala n.
hIrYps LawManhhsd . :a.. i :. t_7�0
rrt ^ONTINUOUS ■ CONTINUOUS CONTINUOUS WNTIMOO1K CONTINUOUS . CONTINUOUS 0 00425 G.OB5 Q17Im
r. PATCHY rATCf1Y rATCHY PATCHY r• PATCII" PATCfIY �T^",w.vd usxcrr.as e...e.Mk+ on 01a1f ur...a
C... ]61!HCGf 01Nr1
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix C — Site Plans
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
PuRT 6F GRAPEVIE'V4 = b6t� KS
0
G
NEW FLOATING DOCKS & BULKHEAD, GRAPEVIEW, WASHINGTON
D
U
VICINITY MAP PROJECT DATA CODES AND STANDARDS SHEET INDEX
V
O
LEGAL DESCRIPTION PROJECT NAME GRAPEVIEW BOAT LAUNCH•FLOATING DOCKS 8 BULKHEAD CONTRACTOR SHALL COMPLY WITH ALL SHORELINE MANAGEMENT ACT REGULATIONS AND 1
PER NIT CON DRIONS IMPOSED BY MASON COUNTY AND THE DEPT OF ECOLOGY. SHEET INDEX-DOCK ARCHITECTS
A PORTION
fl: OF GRI WOO 8 1 AVENUE
ACC ADDRESS. 5053GRAPEVEW LOOP ROAD.GRAPEVIEW,WA 98546 h
A PORTION. ASRECORDEDI VOLUME
1 OF L THE PLAT 3. 2015 INTERNATIONAL BUILDING CODE(hcMdn9IBC 201SWSBC Amendments,JUy 1,2016, I z PLLC
DETROITN 0.2,AS RECORDEDNVOLUMEI OF PLATS,PAGE 23. JURI6O C?ION: CITY OF GRAPEVEJW,MASON COUNTY w4EBG2015 and ANSF2009)
C a
PARCELti 121055166001&121055166001 2015 INTERNATIONAL MECHANICAL CODE(including IMC 2015•WSBC Amendin nits,Ally 1,2016, 601 St Helens
`.�a... ,�55 ^�; ` +�^` -- w/IFGC-2015,NFPA-54.N FPM58)
1 rc',soa -Ou
PRO CT DFC RIPTIDN S Ta corns,Wesidngtgn 98402
/' 201514TERNATIONAL FIRE CODE(Including IFC 2015•WSBC Amendments,July 1,2016,ant r" Ph.—(253)922-4188
1.CONCRETE ACCESS PLATFORM IBULKHEAD,w/TIMSER GUARDRAIL Shordine Amendments) Ci
01- 'tedv
-- 2.ALUMINUM GANGWAY,ADAACCESSIBLE 2015 UNIFORM PLUMBING CODE(including UPC 2015,WSOC Amendments.JUy 1,2016) AP2 0 IDEMOUTI FILAN-DOCK AREA
APZ.1 NTL PLAN-DOCK AREA 8 3.STEEL PLINGSWI CAP 2015 NT ERN All ONAL EN ERGY CONSERVATION CODE.with Washtrlgbn State Amen din mts 22 M8 M O Pr q MTide
PROJECT ' ,. 4.20'FLOATSw/ALL ACCESSORIES.ADA ACCESSIBLE (WSEC,WAC 51-11C) APZ 3 M8ETAILS
Dlst 3 LOCATION 2014 NATIONAL ELECTRICAL CODE(NFPA70) ` PORT OF
4.4"CONCRETE ADA SIDEWALK TO ACCESS PLATFORM a
ICC/ANSI A.117.2009 ACCESSIBLE AND USABLE BULDINGS AND FACLMES•wdh Washi gtm
61ate Amendmen6 �pp GRAPEVIEW
ff tp (mdudng BC 2015•WSBC Amendments.My 1,2016.wAEBG2015 end ANSI-2009) U
fiRAPtviEw PROJECTS
l w PO Box 3
p_ Grapeview, WA 98546
DESIGN P RIL - AR. J
-ale
-"" THE REGISTERED DESIGN PROFESSIONAL IN CHARGE iARCHITECTOR ENGINEER �"•
SEALING THE DRAWNG)SHALL BE RESPONSIBLE FOR REVIEWING AND L7
P, COORDINATING THE SUBMITTAL DOCUMENTS PREPARED BY OTHERS,INCLUDING 7 COVER w
n'e.l1 .I,'I�� PHASED AND DEFERRED SUBMITTAL ITEMS FOR CON PATBILITY WITH THE DESIGN w
n r s
' OF THE BUILDING PER IBC 107.3.4(2015)
DOCUMENTS FOR DEFERRED SUBMITALLS SHALL BE SUBMrrTED TO THE DESIGN i FLOATING
_ PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND O
FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION INDICATN _G THAT DOCKS
—1 sr.. THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND HAVE BEEN
•==_:i ' j '• `�,• i FOUND TO BE IN GENERAL CONFORMANCE WTH THE DESIGN OF THE BUILDING.
'—=_-"'•"�--. ? I' - w"s""' THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE DESIGN
AND THE SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING r
OFFICIAL
O
PROJECT TEAM
S Prq act N—ber
Project issue date: 10/30/15
IIWCIEB: O Submitdate:
N2/2017 12:53:26 PM
PORT OF GRAPEVIEW GENERAL NOTES-CONTRACTOR o
PO BOX 3
GRAPEVIEW,WA 98546 1 CONTRACTOR IS REQUIRED TO VERIFY UTILITY LOCATIONS PRIOR TO < Draaal. AutIN
4 25 61 0-65 52 CONSTRUCTION. CONTRACTOR SHALL CALL UTILITIES UNDERGRUND LOCATION Q
contact:Glen Cadwn CENTER(1-800.424-55551 OR CONTRACT WTH A PRIVATE UTILITIES LOCATING FIRM
emdL poddgrapevlew@gmd.com AT LEAST 48 HOURS PRIOR TO CCNSTRUCTICN.THERE MAY BE UTILITIES IN THE < Checked: Checks'
CCMMESSIONERS AREA MI CH
ARE NOT SHOWN ON THE PLANS. tz
DIstrict 1:John Anderson RESPECTIVE CONTRACTOR IS RESPONSIBLE FOR ATHOROUGH CLEAN-UP FOR HIS/HER w I.�ncmlaEN7loaJ rtainre+v
FVofNe1 penew Y
Distrito 2:Glenn Cad— RESPECTIVE WORK DAILY AND AT PROJECT CLOSE-OUT. Fi e
Disslct 3:L-11 Mahugh 3 CCNTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING IMPROVEM ENTS O
4 DRAWNGS MAY NOT SE TO SCALE DIMENSIONAL INFORMATION SHALL BE o Scda: Ps Indicated
ARCHITECT, OBTAINED FROM WRITTEN INFORMATION ONLY.VERIFY ALL DIMENSIONS BEFORE z
HHJ ARCHITECTS.PLLC PROCEEDING ANY DIMENSIONAL DEVIATION FRCM THAT SHOW)MICH MAY z
Sol ST.HELENS AVE AFFECT INTENT OR DESIGN SHALL BE BROUGHT TO THE ATTENTION OF THE ti REVISIONS.
TACOMA,WA 98402 ARCHITECT TO OBTAIN WRITTEN RESOLUTION PRIOR TO PROCEEDING = Re4t RwData Desvptlen
25 168 5 ARCHITECT SHALL BE IMMEDIATELY NOTIFIED OF DISCREPANCIES BETN z EEN OO
canted:ntact:Rugs Hansen.ArcHtec DRAWNO.R AND SITE CpyDITINS F
email:rogerChhandl.com 6 PRESERVE AND PROTECT ALL UTILITIES VMgCH MAY BE PRESENT AND NOT
a
IDENTIFIED TO BE REMOVED OR MODIFIED.
'W.E.COATED SURVEYING,LLC 7 PRIOR TO ANY CONCRETE FORMING,VERIFY SUBGlRADE ELEVATIONS WTH
9825 GLORY DRIVEIVE B SE 8
R ARCHITECT
OLYMPIA,VIA 98513 8
360�413-0510 9
contact:Wade Ellis C oetes.PLS >m
STRNCTLIRAL ENGMEER� `tX
C CHRISTIAN FV NBOE.PE,SE
7
12181 C STREET SOUTH
TACOMA,WA 98444
253537-8128
contact:OvIs Fvrb.
email.cctyr1—Q..ccm 3
X
QW
W
C
a �
CAU7ION111 OVERHEAD AND UNDERGROUND UTILITIES Q A
N
THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE g
LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.THE 3 "
CONTRACTCR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO < ,Q
CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE LINE AT I-
SM424.5555A MINIM UM OF 48 HOURS PRIOR TO ANY EXCAVATION. H L w �^
w
r r
O
a
SYMBOL LEGEND: THE S.W. 1/4 OF N.E. 1/4 AND N.W, 1/4 OF S.E. 1/4 OF SECTION 5, T. 21 N., R. 1 W., W.M., MASON COUNTY, WASHINGTON
POND MW MINT AS NOTED VERTICAL DATUM:
® CALCULATED POSITION OF YDINJIENT MA-MUW
PER AFN I954912 LEGAL DESCRIPTION: DESCRIPTION FOR AQUATIC RESOURCES LEASE: WWAA94M(Ta MARK AT AL,N,CASE.NET,
• FOLMID AS NOTED DESIGN TION.944 6781 TIDAL 3
THAT PORTION ORSWILD AVENUE,ACCORDING TO THAT PORTION OF THE BED OF CASE MIT BELOW THE LINE OF MEAN LOW TIDE(WATER), PD IY0805
XTHE MAT DETROIT NO 2 AS RECORDED M VOLUME I OWNED BY THE STAF OF WASHNGTCN,97UATE N FRONT OF QdSEOD AVENUE M THE EPOCH. 1983-2001
FOND HAG d WASHER AS NOF9 OF MATS,PACE 23,RECORDS OF MAST+COUNTY. PAT OF DETROIT NO.2./I OOYEMNMNT LOT Z 8N SECTION 5.1.21 K.R.I FL,W.Y.. LOCATION:N477T00',V22'49'36'NAD 83(1986)
(C) •CACULAED WASHINGTON AID BEING A PORTION OF MASON COUNTY.'WASHIKTON MORE PARTICULARLY DESCRW AS FOLLOWS. ELEVATION.16.11'MAD 86
GDERNMENT LOT 2.SECTION 5.TOWNSHIP 21 COMWENCING AT ME INTERSECTION OF THE SOU74 IBE OF SAID GWISWOD AWARE WIN
NORTH,RANGE I WEST,W.M. THE SOUTHEASTERLY LINE CRAPENEW LOOP ROAD;IMM SBBO2'25-E 401.33 FEET (BENCH MAN WO RETREWEO APPoL7,2008 FROM
(P) ..MAT OF DETROIT NO.2.VOL 1.PG 23 LONG SAID SOUTH LINE OF GRISWOD AVENE AND ITS EAIENSION TO IFE LRE OF MEAN N.1.1
Q LSD,ALL TFELANDS OFF„E sECDNn ASS,
•FRUIT TREE FORMERLY OWKD BT STAF 0 WASMNGTON. LOW TIDE AND THE N L POINT O BECAME;NETTED '25'E 71 7:SAD EASIERLT0156 N I/4 CTED PER
SECTION V.
5 USED CONVETIONRTED
ON VO ING MONUMENT(201 AS
SITUATE IN TRW.OF ADJACENT TO OR A13L'71NG 6000EXPEN FEE O SOON DINE a EXTENSION
AVENUE.FTHE NORTH UK OF S HENCE x01S6'4YE I CALCULATED PER FOS Y.19,P.205 SHOW HE FP011 NAVD 8B N TIDAL-MLA AS
❑ .STORM CATCH BASIN UPON THE ABOVE DESCRIBED UPLAND AND LYING: 60.00 FEET 10 RE EASTERLY EAENSIW a INF NORTH LINE O SAq ONSWOID A1EHlE; SHOWN
NEIEON.
BETWEEN THE NORTH AD SOUTH LINES THEREOF THENCE NBRD7521V 76DD FEET ALONG SAD MORN LIME TO THE LINE OF MEAN LOW TIDE; 0 T5 30 60
QD .STORM DRAIN Uwe EXTENDED EASFMY.EXCEPTING ANY PORT" THENCE S7'D6'S1'W 902 FEET ALONG SAID LINE OF NEON LOW TIDE;THENCE S15591231 ( CRd'OiR NVERVAL=2
THEREOF BELOW THE LINE OF MEAN LOW DDE 33,64 FEET LONG SAID LINE OF MEAN LOW TIDE;THENCE S15WO9•W 15.39 FEET ALONG I BASIS OF BEARINGS
® .POWER VAULT BEGINNING,
AGO MEAN LOW ROE;THENCE 5245Y25*W 444 FEET iD RE TRUE PONT OF EOUIPNENT UTILIZED FOR THIS SURVEY:
Q,.UTUTY POLE / ZONE(NTT a 3/91) E SYSTEM OF I9R7 wuTN
SPECTRA PFEGSION FOCUS 30 AND ASHFCh ZONE GLAD 19RVEY
I I METHOD-2 MR W9DT SURVEY ON1R0.
f— ME
•GUY MRE MO-FEUD TRAVERSE
i ®�' I ) ; I ' ',I-' RAS SURNT COMPLES WM ALL SI�S
® .PROPANE IANk / ) I / 3.PENCE�' I AM STATUES O NNE 5 1 CE 0 ACT "ILL DIMENSIONS ARE SHOWNAT(FOUND IFVEL
UNLESS OTHERWISE NOTED..
b9 I I a _• 6 FENCE (CHAPTER 58.09 RCW ANC 752-I3D W
-SIGN
O .SET REBAR d CAP?LS 42684) �• // �LX DECK CONCRETE`•I I
PAD
p .ILe d Tea HOUSEHOUSE,® x0 ,' I� I
.ORMARY WTI WATER MARK , I -,mTW7EF I C"TE
CONCRETE ! N
/ CONCRETEJ 1 S}ARS I I u HOUSE STAR$ 2\
i PROPOSED
16 OA I= FOND 3/4-RCN PPE J II PAWOIM eIADEAD 2 FORD 3/4'RCN PPE
(FYEINSO7) OVERHANG PUMP B'COICRE7F (EMRSONi1
/ DOS'NORTH FORD 3/!'RON PPE 1t)I_''_gE_pp'' Mahn. WALL DTI'NORTH CR 1 CYY;C-:3.85 EASIMY EYTENSM OF UPLAND
(ELER90N) 1 I 1 i ( AMID TIMAND PROPERTY LINES
ON LIE LL IY I PAD CONCRETE FOUND IEID W/TAG >34"4-20011g PER AIAWER DEEDS.AOCCWAROTH
M
Q�-4 $ 391' ,'69.9/' •1 82�96�,,�� - IBM
E1EY..16.6i MLLM
� MBBOY2 ,
8 m� h }�ujs t 7 35.5J, a.9O 5Y'76.OD's3.er
1 cr .IPROPOsm ooa` m6 s4 r 90 i' "I!
1 FOUND 3/•'Ra PIPE � �aA a m + r mMrnETE r33— PRALEL
(nmsax) Q�\1�tp, — V— WOOD
tAIID6CIPE EDGE s RP — �—
3• G4�P4`a�e'a i t ---1\ FOUND 3/4•RaN PPE '-n GRISWOLD AVE. --t- —'Ra,E6
(EMERSON) ;o , T _
Doff'NORTH T C t is
/ R f OHM-16.2W �7 Av A
40.3T 50.eR' ; I ! 7R N I z
/�•,-._-_ +' - 46.65' I xs,7• EDGE OF ASPNµT CbgEF / M°'/S24W 25W 4.44 Q
44.76^W 5527' ��.�AL '7&v , 'S1559' 1539.
�) OUD MAG d WASHER _ - Fyt I RAILROAD TIE CEµry � l 4'-S 462' H SBRD2'23t 401.3T ` 75 a _ 4j, I U
4 CURB WALK I ROD(WALL l — RDSK / 5RB92'25
CMUEF ( CD Tff 1�� 30- ) ( /
Lure w FTA9D s/!'RON PPE FaND 3r4 RCN PPE
— -- raM-t9.ei L— I IpER ) 4EM[RwN) WOOD WALKWAY
32T
W —) — — — E(NE):i'CONIC v1 + 0"mm'" DESCNffD AREA FOR LEA
Z I _ E(nW a PM�763r a — — — — — — —
J E(SW)12.CONC-27.76' I �I
FOUND YALD(EEVERSSOM) I SEE/DETAIL "A" T aEs
IMID FAIR HAW
PER AN N9u7%
1 j - - - - - - - - - - - - -I FOUND 3/4-EON PPE
(EEERSGM)
014'4mr.
FOUND 5/6'REBAR W GAP
I I
�
"
wow
(BECHTOLT)
L NORTH LIE a GOVERNMENT LOT 3 Dtr Marx
659'
6N' Lr_ I
� 'u _ — — — DETAIL "A
CALCOATo SCALE:1'•IO
CENILP
AUDITOR'S CERTIFICATE SURVEYOR'S CERTIFICATE SURVEY IN: J b R 17-2
FLED Fos DAY OF____-___—_,20___ 6WAVA �, W.E. Coates Surveying PORTION OF TIDELANDS AND BEDLANDS IN AND
AT— --M.-N BOOK—OF____�—AT PAGE THIS NAP IN CN:GR ANCEWITH A SURVEY Y6OE BY NE OR UNDER Nr a�J`R. '��, ABUTTING THE S.W. 1/4 OF N.E. 1/4 AND N.W. 1/4 DRLc 2/8/2017
TATDIRECTION Ri EQ E ST OF
WITH THE REOUIREMENTS OF SURVEY RECORDING <y �.1
AT THE REQUEST OF W.E.COLONS SURVEYING ACT AT THE REQUEST OF IWJ _—__—_ � � l,� T 9825 GIaY Or.SE OF S.E. 1/4 OF SECTION 5, T. 21 N., R. 1 W., M'Ren DT CSB
N E€@3�3r-_____�,201Z_ /I Orympla,WA 98513 W.M., MASON COUNTY. WASHINGTON o k d 6r WEC
%FIN. {__ 4Teu
^� �D161EN6//�• I (GOV•T LOTS 2 AND 3) po..y AanW Gv BOAt RAND
j y FOR: HHJ Fro eod GRAPEWEW
^@PUtY AUDITOR COUNTY AUDITOR WADE L CERTIFICATE 42584 J APN: Sheet 1 Of
71
.A"A r1amolitien lk Construic6on Notes
Ali demolition and installation work shall occur in the drv.ddnq law tides.The contractor will be
rewired to submit a Constru ctimRdas Ran alining possible work dates and Was het blow
comilm ct on of al portions Of he prgect in the dry(during low ides).It is possible Mal work may
need to be conducted during the evening hours,asthel Iswhen the loweslfides occur dudnq the
prop used corrsfiucion wndca.Aeon log banter shall bepleced wound the perimeter of the work N
area to prevent 5edmems and debris from migrating
waterward.This wi be rambled when the work is completed ortide isflooding.Workbdpx the O
m
Ordinary High Water in ark(OHW)shill only occur from July 15 through Fetmery 15 of my
consawava yea. n
Project activities shell notd°grade water wdiN lathe detriment offish life if at any bone,as aresult
o1 project activities,fish are observed In distress.a Ash dl occurs.a water quallypro8lems develop
(inrludno equament leeks orstils),immediate notification shall be made to the Washington ip
Department of Ecology(DOE).The movement and use of heavy or tracked machinery is restidad to
the steeling area.Beach area wades disturbed dunno construction shall be ro-shaded to one-existing w
condilonsucion project completionn.AlInatural habgefeatues on he beach.such as rocks.larger
DONOTWGRKHERE , / , than 12 feet in diametershellberetained onthebeachfollowing-ristrucbm.Habitatfeaturesmay
be moved duino construction If necessarv.AS construclon ewipm ant shot he inspected data for ¢
fiud le°ka.No nupmend steal leave the stating erne onllerry leeks we repaired.Fueling and O
II () � usmaintenancedgrounfengsh ant slond occurorlyattheuglendstagingareafbergeequipmentistobe N ARCHITECTS
used.no ound sin aA he allayed
Themovenentand usrofheav ormwasd machine staging arse bring he
m \ S ` , I I y ryisresMingconhesb PLLC
W \ FENCE \ I 1 / // 1 / 1 denogtion and clearing phase.Demotion and removeldedsang cmcrote,arnvda.supporting
A. limbers.and alhardweeshal cencdewlthme lowest possible ldd eventiha Aowsthewaktobe <
N \ \ \ / 1 I 1 1 I / 1 1 �a• accomplished unsubmeged if possible. cc
t W Sol St Helena
N Wet concrete sihal rot emethe Waters ofthe Stele.Forms for any concrete shall be constructed to = Te coma.Wastanfrton S84t12
\ \ I (a)HOUSE \ \ \ , prevent leaching afwal concrete.impervious materials shall be placed over any wposed concrete
nalinedwhh forms hat come at w into contact with state waters Forms and imperviasmateials Phone:(253)922-4158
shall remain in place unH he corrcrete is cured.
I 1 (e)DRIVEWAY \ I \ \ \ { \ / , ( Sawdust.dMnas.ortnmmingstomtmeledwmdshdbecmtanedwMilerpsaohetn peM as 8
TO RESIDENT 1 \ \ \ , / —+ meteiak anti prwanted from contacting he bench,bed.or Wet—of the State.Sex dust&Angs,a O Front Tile
\ / 1 trimmings from treated woad shall be removed end disposed of upland such that hey do not elite
the Waters of the Stars Excavated materials comennq slit.day,or other fine trained sole shall not
\ DEMO PARTIAL I \ \ \ \ \ / / 1 ` bestod0kd balm the OHWmerk No materials shall be stoclgoled outside of he staging area 6
CONIC WALL I \(a)CONC WALL udesathey will be used in that days work. PORT OF
—\, •ill ti'�dls ,e)STORM DRAIN \ ` / / (/ tM1T OF WORK 1 GRAPEVIEW
DAYLIGHT' riih�46��
= - - PROJECTS
D
' �h '•4 \•$ b / , INR LEASE / >
Y N '
I � fSTAO1NG / ! 1 \ 7p 7o t N / a/ m❑
(a)UNDERGROUND , 1 AREA DEMO TIMBER '— , h 1 \ , 1 P w
STORM DRAIN ( J ' / ' POST / PREVIOUS PROJECT RAMP1 \ \ \ PO Box 3
\ ' I / '
I IV
Grapeview, WA 98546
faR1SWQLQAVE , , I / ; ` \ / /r // { / // Si Sheet Tile
S J
DEMOLITION
- 9 PLAN - DOCK
W ROCK , r _ __ /— — _
WALL (a)DRIVEWAY� , SI I , •�� , / I , , � � , � AREA
\ 11 TO8tELTER
/ I `` / / / / 'a
411111111,
(a)EVENT
SHELTER
(a)CONIC WALL Q4 / 1 / t
` Prolnt Number
414p /�� / +' ' \ Project issue date: 1Sf3p/IS
/ / / / / / / , M4 ' / `� • ' Sl712017 12:39:27 PM o Sbmmdata
z
°
Author
ii
Checked: Chedw
WF\lebrlAhaKaapari.w boa
Scale: As ind catd
z REVISIONS.
zo ReA Rev Date Description
U
FAIR HARBOR MARINA dc
n DEMOLITION PLAN- DOCK
w
U
CAUTIONIII OVERHEAD AND UNDERGROUND U11L1T1E5
w a
THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE a: H
LOCATION AND PROTECTION OF ALL EXISTING UTIUTIES,THE
CONTRACTOR SHALL VERIFY ALL IJTLITY LOCATIONS PRIOR TO S� n
CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE LINE AT t- 3
800.424-5555 A MINK UM OF 48 HOURS PRIOR TO ANY EXCAVATION. a R
AP2.0 s
ti a
.on=t retinn N tes R Renuireiiyumilt,
1.THE CONTRACTOR SHALL DEVELOP B IMPLEMENT A SITE-SPECIFIC SPILL PREVENTION.
\ / / CONTAINMENT&CONTROL PLAN(SPCCP)AS SPECIFIED&IS RESPONSIBLE FOR
r CONTAINMENT&REMOVAL OF ANY TOXICANTS RELEASED. 'd
) ) 1 I 2.THE C ONTRACTOR S REQUIRED TO SUBMIT A CONSTRU CTIOWTI DES PLAN OUTLINING O
p ( / I // / POSSIBLE WORK DATES AND TIMES THAT ALLOW CONSTRUCTION OF ANY PORTION OF x
/ / // DO NOT WCRK HERE / 1 THE PR OJECT DURING TIDAL EVENTS BELOW OIiW n
1 I 3.THE LOWEST POSSIBLE TIDE SHALL BE DESCRIBED AS THE RECESSION OF WATER TO O
THE POINT THAT 5 FEET OR GREATER OF DRY BEACH EXISTS WATERWARD OF THE 10
LOCATION OF WORK.ACOIR LOG BARRIER SHALL BE PLACED TO PREVENT SEDIMENTS
F I 1 I I o d DEBRIS FROM MIGRATING WATERWARD 8 REMOVED WHEN WORK S FINISHED OR TIDE �
W I I I \ I I I I G ISFLOODING. f°
\ (e)WOOD ) ( /
FENCE 1 \ I ) / J / 4.IF IT IS NOT POSSIBLE TO ACCOMPLISH WORK IN ANY CONDITION EXCEPT U
SUBMERGED THAN A SILT/TURBIDITY CURTAIN SUSPENDED FROM A BOOM AS SPECIFIEDJ
{ \ / R_ I ( PROECT / SHALL BE PROVIDED.INSTALLED&MAINTAINED BY THE CONTRACTOR FOR THE
$ \ \ I I DURATION OFTHE WORK ACCOMPLISHED N A SUBMERGED CONDITION. O
\ \ FLOATING DOCKS , W ARCHITECTS
\ I (6)HOUSE \ \ \ PILNGSI / 1 1 J 5.PROJECT ACTI\ATIESSHALL NOT DEGRADE WATER QUALITY TO THE DETRIMENT OF o PLLC
\ \ \ , FLOATONG DOCKS / / FISH LIFE.IFAT ANY TIME,AS RESULT OF PROJECT ACTIVITIES.FISH ARE OBSERVED IN 2
DI RSS,A FISH KILL OCCURS.OR WATER QUALITY PROBLEMS DEVELOP(INCLUDING
5
RE GRADE EDGE \ \ CONCBULKWAY GAN / J / EQUPMENT LEAKS OF SPLLSi IMMEDIATE NOTIFICATION SHALL BE MADE TO THE a
(e)DRIVEWAY ADA PLATFORM (a)CONC WALL \ AS NECESSARY wMMBER RAIUNOB WASHINGTON DEPARTMENT OF ECOLOGY.1-800-258.5990,&TO THE AREA HABITAT 601 St Hdenc
T RESI CE SIDEWALK BULKHEAD t \ w/(e)GRAVELS \ \ / BIDLOGISf,1-360�27-2179.
78-P l\ \ ADA SIDEWALK F Tacoma,WaeNnpton 88402
6.rd Phm.:(253)922-4168
1 LOCATION WLIGHT,VERIFYt`- ---y-.___- APPROX 7.Ne 2
-j \ \ \ / '7"� ELEVATION-4.3' I S.THE MOVEMENT&USE OF HEAVY OR TRACKED MACHINERY IS RESTRICTED TO THE 8
1 I / I STAGING AREA&THE FOOTPRINT OF THE NEW BOAT RAMP. 0 pr 4M Tile
-
- 9.BEACH AREA GRADES DISTURBED DURING CONSTRUCTION SHALL BE RE-SHAPED 70 �O PORT OF
- PRE-PROJECT LEVELS UPON PROJECT COMPLETION. <
- GANGWAY- - -�� � -
' 1 INSPECTED DAILY FOR FLUID LEAKS
EQUPMENTIQ ALL CONSHALLLIEAVEQT ER STAGINGAREBAUNTIL ANY LEAKS ARE REPAIRED. NO z GRAPEVIEW
(e)UNDH2GRW ND I i�IBrAalnc I ' FUEUNG&MAINTENANCE OF EQUIPMENT SHALL OCCU R ONLY AT THE UPLAN D STAGING 8
STORM IXiMNi I I AREA ' — ----._pi3EVlO1JS PROJECT_ /� /� AREA PROJECTS
11.IF BARGE EQUIPMENT IS TO BE USED,NO GROUNDING SHALL BE ALLOWED. O
ROATRAMP 1- }- � LIMIT OF WORK >
ORI_eWOLD AVE I ' / 12 WET CONCRETE SHALL NOT ENTER THE WATERS OF THE STATE.FORMS FOR ANY a
♦ 1 I ONR LASE CONCRETE SHALL BE CONSTRUCTED TO PREVENT LEACHING OF WET CONCRETE m
'� , `�' A' , \ ♦ \ I J I , 1e r IMPERVIOUS MATERIALS SHALL BE PLACED OVER ANY EXPOSED CONCRETE NOT UNED o
MATERIALSwfFORMHSHAAT\LL REMAIN IN PLACE ME INTO NUNTIL HE CONCRETE IS CURED.WITH STATE WATERS. RM581MPERVbUS
13.ALL NATURAL HABITATFEATURESON THE BEACH(ROCKS)LARGER THAT ITIN w PO Box 3
/ _ / DIAMETER SHALL BERETAINEDONTE BEACH FOLLOWING CONSTRUCTION.HABITAT m Grapeview,WA 98546
-- -/- - _1- - _ / - / ' , -- _ FEATURES MAY BE MOVED DURING CONSTRUCTION IF NECESSARY. J
WA�LOCK ) , TT-p' - — - - _ - _ 14.SAWDUST,DRILLNCS OR TRIMMINGS FROM TREATED WOOD SHALL BE CONTAINED sheet Tige
\ / / / / wITARPS OR OTHER IMPERVIOUS MATERIALS AND PREVENTED FROM CONTACTING THE
el DRIVEWAY ( M-1' verBY 1 / / II BEACH.BED OR WATERS OF THE STATE.SAWDUST,DRILLINGS OR TRIMMINGS FROM O
1 \\1 ITO SHELTERWDMARNE ♦`♦ / / 1 / / ' TREATED WOOD SHALL BE REMOVED&DSPOSEDOF UPLAND SUCH THAT THEYDONOT w SITE PLAN
ENTER THE WATERS OF THE STATE,
\ '\ DOCKS I !s ♦♦ / / / ' ' / 1S EXCAVATED MATERIALSCONTAINNOSLT,CLAY OR OTHER FINE GRAINED SOILS 2 DOCK AREA
\ 1 ( /k'.� / �♦ 1 1 / SHALL NOT BE STOCKPILED BELOW THE ORDINARY HIGH WATER MARK(OHW).
S EVENT 1 \ 1 I ; k O ♦ 16 NO MATERIALS SHALL BE STOCKPILED OUTSIDE OF THE STAGING AREA UNLESS a
SHELTER \ \ / '1O� ♦ , 1 /
\ / � (e)CONC / .(� • ' / / THEY WILL BE USED N THAT DAYS WORK.
WALL / / eqy A1♦ / / ' / 1
/ /// / / / k1� / 7►♦ / /'46
\
/ / / / / // / / / / •er \ o
Prq act Number -
/ Project issue date: 10�/15
O Submit dale 60201712:3927 PM
Drawn: IMAM
Checked: Chmkff
\ \ � •- � / / � / / / � eUotr\tmsXa.v.4.wm.
< scale: As Ind cold
REVISIONS:
p Revp Rey Date pescrpiim
FAIR HARBOR MARINA
7/7T
�1 SITE PLAN-DOCK AREA
3
U
x
w
U
CAUTIONIII OVERHEAD AND UNDERGROUND UTILITIES &
w a
THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE
LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.THE H
CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO
CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE LINE AT 1-
800-424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION. iZ
AP2.1
ui a
APL-ATF
)CONC WALL (8)70'STEEL FILES (618 x 27'FLOATNO6DOCKS,wA-EGSAND P�121'-5 7 FIBERGLASS GRATINGGUARDRAILS BOTHSIDES,NOT SHOWN I 48 GL7AYg- TYP(e)DRAINAGE PPE_ _DAYLIGHT \ \ / f oO
I --' —____ ______I_
N
PREVIOUS PROJECT. \\ I f o I )\ 11 0
O
R na;RAMP f
19; 14' 1z 1a 8 s 4' 1 2 a _7 .4 O ARCHITECTS
° PLLC
4'CONC SIDEWALK FLUSH
wife) I I I I I I I
ASPHALROAWAY,AA
COM 1 r 60 St HeienePLIANT,MAX CROSS SLOPE 1:18 Tel came,Weehinptm 98402
I I I I I I PIgn0:(253)922J168
A I I I 164-11 7/16' I I I 1 O
OO Prq Kt Title
TOP OF RUNG 23'TYP, r
I I I I I I I PLUS RUNG CAP 6PORT OF
10'DIA STEEL PILE TYP ¢
- - 1-4' ,UiH p L) GRAPEVIEW
PROJECTS
0
I I I I I FLOATINGDOCK9 a
(e)DRAINAGE PIPE I I I I MHHW 8 14LLW
BEYOND ) I I I O
2
Seale
- - -- - -- - - - - - - - -{--- - -I- -- - -�-- - - - - - �el aLW
�t1 w P0 Box 3
I I I I I I I I w
I I I I I I I m Grapeview,WA 98546
I 1 I I I I Sheet Title
I I I I I 1 GRADE w PLATFORM &
I I I I I I I-I FLOAT DETAILS
BEACH PROFILE AT DOCK& PILINGS
a
( (e)CONIC WALL \ \\ t
P Number
Pro,.jectIW issue date'. 1N30f15
14'-07/32• _` �i����' PROPERTY LINE \\ Submttleta 6/2201712:3828 PM
(e)STORM DRAIN \ g
I8-31? 18-I'a ' DAYLIGHT \ < Dram: AIAW
I _ 47 HIGH TIMBER \ \ < Cherked O"wk.
_—_ _. — — — — —— — GUARDRAIL \
\ \ K� F1�onuetslQ.ne4.wm.t
� I \ \ W IeircM�MilQrp�Mlein AtY
4'CONIC ADA O_ , ��. 1 \ \\ \ F e:
fe)pRTI f7ASS —_
SIDEWALK 1 —
5 z Scde: As ind toted
.' 2'. ' ,HM'/12'.-'t �C 116-0, ® 0 REVISIONS.
�, -+-► I I 5 x 48'ALUM a
1l-3117 — \ I GANGWAY W/ADA ozo ReW Re Date Desaptlm
1B' 2711G Y GRATING# 4 —�—
EDGE OF(e)
ASPHALT
1B-T 18-13116'
PR EVIDII.c PR2ECT c
91932' �
BOAT RAMP 8 ECO
(eJ ASPHALT LL
f 1/�
t� BLOCKS J
1 Y I.
ROAD 3
1 X
I (I e
��NLARGED PLATFORM PLAN co„6trDetln„yeriRcatinn a f
G w a
I.ALL DIMENSIONS AS SH CANN ON PLANS SHALL BE VERIFIED BY CONTRACTOR PRIOR
TO FABRICATION AND ANY FINISHING PROCESS.ANY OISCREPENCES SHALL BE
BROUGHT TO THE ATTENTION OF THE OWNER AND ANY ADJUSTMENTS SHALL BE
APPROVED IN WRITING BY THE OWNER OR THE OWNERS REPRESENTATIVE PRIOR TO 3 ^
FABRICATION.
2.ANY ADJUSTMENTS OR MODIFICATIONS REQUIRED AFTER VERIFICATION OF THE RAN w A P 2.2
w SHALL THE OW BE AT NO COST TO THE OWNER F
O
a
co
�� r.. ..
T r
cl
CID yr
m r
z (.
Qos
OOGO mD -1n a!
0
<
T C
m c=im�m8 8 a�
o m o
v $ n
P � o
9 m.
O rn D v
f n� Ay
rz
sl
^ I
_rT�
f: I I
mO
i °z
T ~Z
00
� F
.V I
AI
N C
tn9A
D �9g
� o
a
yu D$m0� W
mg <i�4 r ..
Zy g20
�m A-m Z
ZD
Zl,- D
O ZZ O O
38 mO wz a
y mpT =
Aao� m
z
m n m�
v
> mg �
m mtn9� P
mmC)O
y -1?b�Z NI
z
mD Fo
i O�mv
m n
Z O A
J
NOTE:THESE DRAWINGS ARE PRODUCED EXCLUSIVELY FOR USE BY HHJ CONSTRUCTION INC.AND FOR PERMIT APPLICATION ONLY. ADDITIONAL DETAILING AND ENGINEERING SHALL BE REQUIRED BY ANY OTHER CONTRACTOR TO COMPLETE THE DRAWINGS TO"FOR CONSTRUCTION"PURPOSES.
A A to '�f g 4 to m m s v
a 0 �9 a 3 r � o ODD a ' e$ � D
� " 04 D 5•w m m _ ) n
c`s N M $ 9
5• � m a ti
W x D m n
g r— � c
PLOT: VV2917 1239:29 PM
Appendix D - Action Area Map
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix E - Author Qualifications
Ann Boeholt
Senior Environmental Planner
Professional Experience:29 years
Ann Boeholt is a Senior Environmental Planner and a Certified Professional Wetland Scientist with
29 years of experience in aquatic resources management in western Washington. She has worked
within all levels of government. Ann began her career working two part-time positions--with a local
government (Mason County) and the US Fish and Wildlife Service. This transitioned to a full-time
position as a Wetland Biologist with the USFWS, then 14 years as a regional Wedand Specialist at
the Washington State Department of Ecology where she had a hand in developing many of the
wetland tools in use to this day within the State of Washington. Also, during that time, Ann served
an 8-month appointment as a Marine Habitat Biologist with the State Department of Fish and
Wildlife and attended graduate school. She then served 12 years at Pierce County Surface Water
Management as a Wetland Biologist and Project Manager. She joined SVC in July 2016. Ann has
extensive experience in wetlands delineation and rating, native plant selection and care, restoration
design,maintenance,monitoring,and mitigation banking and In-Lieu Fee Programs.
Ann earned a Bachelor of Science degree from The Evergreen State College, in Olympia
Washington and completed coursework and a thesis towards a Master of Science at the University of
Washington's School of Fisheries and Aquatic Sciences. On the job education and training has
included training in wetland delineation,the use of the Washington State Wetland Rating System and
Credit/Debit Assessment, Determination of Ordinary High Water Mark, Designing Compensatory
Mitigation and Restoration Projects,Construction Management,and more.
Richard Peel
Wetland Scientist
Professional Experience: 5 years
Richard Peel is a Wetland Scientist with diverse professional experience in wetland ecology,
monitoring, and delineation throughout Washington and Oregon. Richard is Washington State
trained in conducting wetland delineations, assessing wetland systems, mitigation planning and
design, implementation of monitoring programs, mitigation monitoring and reporting. He also has
extensive experience in an analytical laboratory using state-of-the-art equipment in bacteriological
and chemical analysis of soil and water samples.
Richard is a graduate of The Evergreen State College,with dual degrees in Ecology and Economics.
He has focused his academic career on ecology, disturbance ecology, chemistry, and the economic
impacts of current environmental management. Richard has extensive training and field experience
in wetland related disciplines,and has experience in wetland both east and west of The Cascades. He
has been trained by The Washington State Department of Transportation's (WSDOT) Wedand
Ecology and Monitoring team in the use of the wetland delineation, mitigation, monitoring, and
restoration techniques. In addition, he was directed by WSDOT's Wetland Protection and
Preservation Policy to ensure wetlands are preserved and protected whenever possible. This
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
direction ensures no net loss in the quantity or quality of wetlands in the fixture and minimization of
impacts to wetlands in the present.
Melissa Cole
Staff Scientist
Professional Experience: 5 years
Melissa Cole is a Staff Scientist with a background in research writing, project management, peer
review, executing scopes of work, budgeting and financing, organizing and attending technical
science seminars, public outreach, data entry and analysis, Phase I and Phase II environmental site
assessments, soil sampling, soil vapor sampling, soil excavation monitoring, field classification of
soils, stormwater surveying,water sampling, asbestos sampling,lead in water sampling, lead in paint
sampling, noise monitoring, radon sampling, tree height / width and condition measurements, tree
density measurements, seedling and sapling counting, analyzing grazing conditions, statistical
analysis,and research presentation.
Melissa received a Bachelor of Science degree from San Jose State University in Environmental
Studies with a minor in Biology. This program provided her with a strong background in natural
resource management, environmental laws and regulations, habitat conservation, and environmental
restoration. Melissa's interest in habitat conservation drove her to minor in Biological Science where
she had courses in botany,zoology,computer literacy,biostatistical analysis,and ecology.
1267.0004-Port of Grapeview Dock Soundview Consultants LLC
Shoreline,Critical Areas,FEMA and ESA Assessment Report and Habitat Management Plan June 29,2017
Appendix F — Eelgrass and Macroalgae Survey Results
Technical Memorandum
1267.0004-Port of Grapcview Dock Soundview Consultants I.LC
Shoreline,Critical Areas,FNMA and FSA Assessment Report and I Iabitat Management Plan June 29,2017
Soundview Consultants
Environmental Assessment-Planning.Land Use Solutions
2907 Harborview Drive,Suite D
Gig Harbor,WA 98335
Phone: 253.514.9852
Fax: 253.514.8954
Technical Memorandum
_ J
To: Jason Sweeney,Army Corps of Engineers File Number: 1267.0004
From: Ann Boeholt, Soundview Consultants LLC Date:June 7, 2017
Re: Eelgrass and Macroalgae Survey Results for Grapeview Loop Road & Griswold
Avenue, Grapeview,WA,Mason County Tax Parcel Number 12105-51-00900
Dear Jason,
Soundview Consultants LLC (SVC) was hired by HHJ Architects,PLLC and the Port of Grapeview
(Applicants) to provide an aquatic vegetation assessment for two isolated projects: a community-use
ramp and joint-use dock. The subject property is located at Grapeview Loop Road and Griswold
Avenue in Grapeview, unincorporated Mason County, Washington. The proposed projects are
located within Case Inlet and the subject property is situated in the Southwest V4 of Section 5,
Township 21 North, Range 01 West, W.M. (Mason County Tax Parcel Number 12105-51-00900).
This survey was conducted to verify presence or absence of protected areas of macroalgae or eelgrass
under and surrounding the project area,and to also ensure that significant benthic vegetation is fully
quantified in consideration of potential project impacts. The eelgrass/macroalgae survey was
completed on May 27,2017 and with accordance to the Washington Department of Fish and Wildlife
(%IDFW) guidance.
Methods
This preliminary eelgrass/macroalgae survey was conducted according to WDFW guidance, entitled
Eelgrass/Macroalgae Habitat Interim Survey Guidelines (06/16/2008). The survey transects were
referenced to one fixed location where a stormwater culvert outfall extends out of an existing
bulkhead. One centerline and four outer transects were analyzed. Please refer to the Attachment Al
for a photograph of the centerline transect. In a typical survey,the intermediate transects are parallel
to the centerline transect on either side. For this project, the centerline transect extends from the
fixed culvert location and out 190 feet (25 feet from the waterward end of the proposed dock) (T1).
The four outer transects were measured 25 feet north of and parallel to the centerline (T2), 25 feet
south of and parallel to the centerline (T3), 77 feet south of the centerline (174), and parallel to the
location of the southern edge of the existing ramp, and along the waterward edge of T2 to T4 (T5).
All transects were surveyed from the existing bulkhead to approximate(Ordinary High Water[OHW])
of tidal elevation of-7 feet. The survey area was investigated for occurrence and density(if found) of
submerged aquatic vegetation. Other observed aquatic life was noted during the survey. Project area
photographs are provided in Appendix A and a beach/aquatic survey graphic is provided in Appendix
Soundview Consultants u.c June 2,2017
1267.0004 Eelgrass and Macroalgae Survey Results Page 1 of 11
B. The survey team included Racheal Villa,Senior Biologist and Ann Boeholt,Senior Environmental
Planner,of SVC. Please refer to Attachment C for biologist qualifications.
Results
The survey occurred on May 27, 2017 from approximately 12:30 to 2:30 pm,with a -3.68-foot low
tide observed at 1:42 pm. During the survey, the weather conditions were sunny and visibility was
good.
The substrate on the shoreline consists of 100 percent imported angular rock from the approximate
16-foot to 10-foot elevations. Small cobble over mucky sand and barnacles were observed from the
approximate 10-foot to 4-foot elevations. A mud flat consisting of mucky silt was observed from the
approximate 4-foot to -7-foot elevations.
The survey team did not identify any eelgrass or magroalgae species. We did identify small patches of
pickleweed (Salicornia de
ressa) and seaside plantain (Plantago maritima) on either side of the stormwater
outfall culvert. Observations from the OHW to the approximate 4-foot elevation identified sparse
patches of sea lettuce (Ulva sp.) and numerous barnacles (Balanus glandula), mud snails (Batillaria
attramentaria), and clam holes. Observations from the approximate 4-foot elevation to -7-foot
elevation identified one moon snail(Ulva sp.)and several moon snail collars(Neverita lewisir)and several
red rock crabs (Cancer productus). Observations at the waterward end of the existing ramp identified
one Bay ghost shrimp (Neotrgpoa sp.), one bent-nosed clam (Macoma nasuta), and one sea star (Pisaster
sp.). We found it noteworthy that the sea star had only 4 (not 5)legs. An oyster bed (Crassostreagigas)
was observed along the terminal end of T2 at the approximate 3-foot elevation. Red branched algae
(Odonthalia floccose) was observed unmatched and drifting in the water within the survey area.
Observations concluded that the area was not conducive to good forage fish habitat. Table 1 shows
the flora and fauna identified during this survey. Please refer to Attachment B for location of transect
lines (T1-T5) and a graphic display of site observations.
Table 1. Observed Species in the Vicinity of the Project Area.
Name,of Flora/Fauna, Other/descri tion
Pickleweed(Salicornia Small patch observed on either side of culvert
deprrssa)
Seaside plantain(Plantago Small patch observed on either side of culvert
maritima
Sea lettuce Ulva s Sparse patches observed at the OHW to the 4-foot elevation
Barnacles (Balanus Numerous observed at the OHW to the 4-foot elevation
landula
Mud snail(Batillaria Numerous observed at the OHW to the 4-foot elevation
attramentaria
Clam holes Numerous observed at the OHW to the 4-foot elevation
Moon snail Ulva s One moon snail observed in the mud flat area
Moon snail collar Several moon snail collars observed in the mud flat area from approximate 4-foot
Neverita kwisii elevation to-8-foot elevation
Red rock crab (Cancer Several observed in the mud flat area from approximate 4-foot elevation to -8-
roductus foot elevation
Bay ghost shrimp One bay ghost shrimp observed at waterward end of existing boat ramp
Neot a s
Soundview Consultants LLC June 6,2017
1267.0004 Eelgrass and Macroalgae Survey Results Page 2 of 11
Bent-nosed clam One bent-nosed clam observed in mud flat area by end of existing ramp
Macoma naruta
Sea star Pisaster s One bay host shrimp observed at waterward end of existing boat ram
Pacific oyster(Crassostrea Observed along terminal end of the T2 at the approximate 3-foot elevation
i as
Red branched algae Unattached;observed drifting in the water
Odonthalia loccose
Summary
With an absence of macroalgae and eelgrass within the project area,no impacts to protected areas of
macroalgae or eelgrass are anticipated from the proposed project. Hopefully this survey data provides
sufficient information for Mason County, WDFW, and USACE to process and review the project
application. If you have any questions or comments,please feel free to email or call me at the contact
information below.
If you have any further questions,please contact us at your earliest convenience.
Sincerely,
k'"/� ell 6,2017
Racheal Villa Date
Senior Biologist
Soundview Consultants LLC
racheal@soundviewconsultants.com
June 6,2017
Date
Ann Boeholt
Senior Environmental Planner
Soundview Consultants LLC
ann@soundviewconsultants.com
Soundview Consultants uc June 6,2017
1267.0004 Eelgrass and Macroalgae Survey Results Page 3 of 11
Attachment Al — Photograph of Centerline Transect
ry
y
Photo taken from east end of transect, facing west towards the shoreline with existing boat
ramp depicted in the upper left and sea lettuce (Wra sp.) depicted green on the shoreline.
Soundview Consultants I I-c June 6,2017
1267.(N)04 Felgrass and Macroalgae Sunny Results Page 4 of 11
Attachment • Photograph , Project • I
Facing North
Attachment A3 — Photograph of Project Area, Facing
Northeast
4.
44
RM N'24 '
TV
Photo taken from existing ramp with imported angular rocks depicted transitioning to small
cobble over mucky sand.
Soundview Consultants uc March 16,2017
1267.0004 Eelgrass and Macroalgae Survey Results Page 6 of 11
Attachment A4 — Photograph of Project Area, Facing
Southwest
Y
r r -... {_ __.: ate"+. � .x�.�'J,r�a�• -�^ `� '.;
i
�, .r r..w.+ � _--'-+wOr�ra �+-.�-_�Mt,wt '+eT,,;�,�,w. ��"�� ••_lr'a�... -> �'-�-,G
sr
��.i1�.�'
4
wow
.a , ' "z `%� Xr > ` - ''Jf,�' -'may ` `r 'i""'�i°`'�`'� •}..7f"IEi"'' ".<JG' of
_
Photo taken from approximate waterline depicting shoreline conditions and existing ramp
in the upper left.
Soundview Consultants 1.1.c- March 16,2017
1267.(N)04 l;clgrass and Macroalgac Sunny Rcsults Page 7 of 11
Attachment A5 — Photograph of General Project Area
Substrate Conditions
�� •.� _ ''7'1 .wA"�{ to •r� �'�.`�.. .���jl
v
F 1
Soundvicw Consultants,,t.0 March 16,2017
1267.(X)04 F,clgrass and Maeroalgae Sun-ey Results Page 8 of 11
Attachment B — Site Map
Soundview Consultants 7 IC March 16,2017
1267.0004 Eelgrass and Macroalgae Survey Results Page 9 of 11
PORT OF GRAPEVIEW - BEACH A VATIC SURVEY
SMALL COBBLE OVER MUCKY MUD FLAT WITH WATER LINE PUGET
SAND WITH BARNACLES SPARSE PATCHES -3.68' (RELATIVE SOUND
(Balanus glandula) &MUD OF SEA LETTUCE TO MLLW) DURING
SNAILS (Batillaria attramentaria) (Ulva sp.) SURVEY
PACIFIC OYSTER BED
(Crassostrea gigas)
( -1055 SF
w0 20 40 80 w1 J /.
GRAPHIC SCALE
i j En
)1I H
tVrAY2r RGl{..!
.IOEWAL: ; 2U' i..Ao cr..
,• Q
TRANSECT 2 V -
r
r
J
—- �- TRANSECT 1 s
OHW 16.64'
GRlSWOIDAk/E TRANSECT3I
l xz
— _ L,. w y p 3
PROPERTY BOUNDARY —' — __ _. _ _ _ � - � 441
N
\_
WALL
UHF ER �
1 D MAPINE
1 1 -oC�.Z _vim 7
(SHELTER e)EVENT R+
/J �
✓ � \ ' � � I �� `�:',` ' '�
CT4 ANGULAR ROCK
-1243 SF p
03 ,E
MLLW 0.0' — o
PRELIMINARY
INFORMATION ONLY
DATE: 6/7/2017
NOT FOR CONSTRUCTION \\ � \ � � I �
/ JOB: 1267.0004
1VfA-RINA
/FAIR H-
SOUNDVIEW CONSULTANTS,LLC.ASSUMES — — —�� �� / / , �` -------- -- --------�---- BY: DLS
NO LIABILITY OR RESPONSIBILITY FOR /J l
CONSTRUCTION,IMPROVEMENTS, OR �� ��� // / , / / / /;' / j SCALE.SEE GRAPHIC
ESTIMATES BASED ON THIS PLAN SET
SHEET 1 OI, 1
Attachment C — Qualifications
Ann Boeholt
Senior Environmental Planner
Professional Experience: 29 years
Ann Boeholt is a Senior Environmental Planner and a Certified Professional Wetland Scientist with
29 years of experience in aquatic resources management in western Washington. She has worked
within all levels of government. Ann began her career working two part-time positions--with a local
government (Mason County) and the US Fish and Wildlife Service. This transitioned to a full-time
position as a Wedand Biologist with the USFWS,then 14 years as a regional Wetland Specialist at the
Washington State Department of Ecology where she had a hand in developing many of the wetland
tools in use to this day within the State of Washington.Also,during that time,Ann served an 8-month
appointment as a Marine Habitat Biologist with the State Department of Fish and Wildlife and
attended graduate school. She then served 12 years at Pierce County Surface Water Management as a
Wetland Biologist and Project Manager. She joined SVC in July 2016. Ann has extensive experience
in wetlands delineation and rating, native plant selection and care, restoration design, maintenance,
monitoring,and mitigation banking and In-Lieu Fee Programs.
Ann earned a Bachelor of Science degree from The Evergreen State College,in Olympia Washington
and completed coursework and a thesis towards a Master of Science at the University of Washington's
School of Fisheries and Aquatic Sciences. On the job education and training has included training in
wetland delineation, the use of the Washington State Wetland Rating System and Credit/Debit
Assessment,Determination of Ordinary High Water Mark,Designing Compensatory Mitigation and
Restoration Projects,Construction Management,and more.
Racheal Villa
Senior Biologist
Professional Experience: 10
Racheal Villa is a professional fisheries biologist with a diverse background in both fresh water and
marine ecology with emphasis in salmonid life histories and habitat. She has experience in assessing
marine, shoreline, stream, and wetland systems, reporting on biological evaluations, permitting, and
site assessments. Racheal earned a Bachelor's of Science degree in Fisheries Biology from the
University of Washington,Seattle,with additional graduate level training in salmonid behavior and life
history; restoration of fish communities and habitats in river ecosystems; biological problems with
water pollution;and biomonitoring and assessment.
In addition, she has received formal training from the Washington State Department of Ecology in
Compensatory Mitigation and Restoration Projects,Determining the Ordinary High Water Mark,the
revised Washington State Wetland Rating System, Selecting Wetland Mitigation Sites Using a
Watershed Approach, and Biological Assessment Preparation for Transportation Projects from the
Washington State Department of Transportation. She is also a Pierce County qualified Fisheries
Biologist. For a list of representative projects,please contact her at Soundview Consultants LLC.
Soundview Consultants LLC March 16,2017
1267.0004 Eelgrass and Macroalgae Survey Results Page 10 of 11
Melissa Cole
Staff Scientist
Professional Experience: 5
Melissa Cole is a Staff Scientist with a background in research writing, project management, peer
review,executing scopes of work,budgeting and financing,organizing and attending technical science
seminars, public outreach, data entry and analysis, Phase I and Phase II environmental site
assessments,soil sampling,soil vapor sampling,soil excavation monitoring,field classification of soils,
stormwater surveying, water sampling, asbestos sampling, lead in water sampling, lead in paint
sampling, noise monitoring, radon sampling, tree height / width and condition measurements, tree
density measurements,seedling and sapling counting,analyzing grazing conditions,statistical analysis,
and research presentation.
Melissa received a Bachelor of Science degree from San Jose State University in Environmental Studies
with a minor in Biology. This program provided her with a strong background in natural resource
management, environmental laws and regulations, habitat conservation, and environmental
restoration. Melissa's interest in habitat conservation drove her to minor in Biological Science where
she had courses in botany,zoology,computer literary,biostatistical analysis,and ecology.
Soundview Consultants u.c March 16,2017
1267.0004 Eelgrass and Macroalgae Survey Results Page 11 of 11