Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FPA2016-00015 St Albans Pasture - FPA Permit / Conditions - 12/5/2016
FINDINGS OF FACT s FPA Case#2016-00015 APPLICANT: St Albans APPLICATION DATE: December 5,2016 Mason County has reviewed the above referenced application for Class IV General Forest Practices and finds it in conformance with all applicable County land use regulations in effect at the time of application. FINDINGS The proposed FPA is compliant with the following conditions: The proponent has paid the prescribed fees. The proponent has filed a complete, signed application. A map has been received that complies with the requirements of 11.05.120: (I) Harvest boundaries and tree retention areas. (II) The approximate location of any structures. (III) The location of all existing and proposed streets, right-of-ways, easements, skid roads,haul roads, and landings within the proposal. (IV) The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space, wildlife habitat, screening, and/or buffers. (V) Site topography at contour intervals of 40 feet. (VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. (VII) Drainage ways and culverts. (VIII) Site area targeted for further harvest including proposed timing. (IX) North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. That this FPA is in conformance with the following Mason County ordinances: 11.05 That the proposed FPA involves 1.8 acres on a single parcel. That the notifications required by 11.05.060 have been made if applicable. Note: Harvest unit is greater than 500 ft from a State Park Mason County Resource Ordinance 1 _X_That at the issuance of this permit will not result in a violation of the Mason County Resource Lands and Critical Areas Ordinance. The site was inspected by Michael MacSems of the Mason County Planning Department who determined that any critical area buffer and/or steep slope issues have been resolved. Geo-Technical Report/Assessment Review A Geo-Technical _X_ Assessment_Report(check one)was written by and a submittal checklist was approved by Michael MacSems of Mason County DCD on N/A Washington State Department of Transportation _X_A DOT Access Permit is not required for this proposal. A DOT Access Permit is required for this proposal. Date Approved by DOT: Mason County Road Access Permit Road Access Permits were issued by Mason County Public Works on Note: Using existing driveway. Shoreline Master Program That, if applicable, all activity under this application are in conformance with the Mason County Shoreline Master Program and has a shore line designation of N/A. State Environmental Policy Act This application for FPA#2016-00015: X Has been reviewed for SEPA compliance under case#: SEP 2016-00126. _Is SEPA exempt. _DNS X MDNS Stormwater Management A Stormwater and Erosion Control plan written to the specifications of the 2005 WSDOE Stormwater Manual by , as well as a 2 submittal checklist was reviewed Michael MacSems of DCD and he approved a submittal checklist on 12 point BMP narrative written by Joe Staley. Permission from Underlying Property Owners: Yes WSDOR Notified: Yes CONCLUSION In conclusion,this application for Class IV General Forest Practices is consistent with the above criteria and that the public uses and Mason County has fulfilled its statutory obligations. RECOMMENDATIONS I, being the Manager of the Mason County Planning Department, hereby attest to and certify that appropriate provisions have been made for this Class IV General Forest Practices Application and hereby recommend approval. In addition these facts evidenced by the contents of the file for this Forest Practice Application. Signed, David Windom,Director Community Services Dept. Date 3 /Z / l1 Michael MacSems, FPA Reviewer Date 3 FOREST PRACTICE WATER TYPE MAP TOWNSHIP 22 NORTH HALF 0, RANGE 01 WEST(W.M.)HALF 0, SECTION 18 Application#: L12 7 8 1 546 548 S Devereaux Lake 06 —N 526 /< +17 5 706620 F T 1 13 X �A 18 17 z Z X +1 1 Ofi50�� G 1 2 t X - 2 0 0 N Z ADO = o � Q 1 5586 0558 1705680 24 19 20 F Lake Feet Date: 12/3/2016 Time:8:54:24 PM NAD 83 Contour Interval:40 Feet S T Ai.8 AIV S T eus-r _ H o2SE k oo AIC Cl LI%(FS �XPi�uSlOA1 � O �cr/tfJin�Gs �x --X-Fr'nrCE �► - e x,sTIV& pA97luf2,5 .� ••• �C1 STJAt(r �A D �1rA'wslanl p.,ltrA - 122077500380 122085003004 Ab E9 122073400010 122080060010 122074004000 122073400000 122070060000 122074060000 122085004029 Ab 122085260000 122080060000 122073460020 W 122085005001 122182190542 122085006001 122182100550 122181004000 1221722000' Ic 122170060000 Ic 122182100560 Ib Kb Eh 122077590671 122172200032 Ib 122077590571 122077560572 122180060000 122077590574 122077590573 122077500660 122172100040 122077590581 122077590584 0582 122181060000 122172360000 12207759 .122077590583 2 N R1 W 122077590591 122077590594 122172490031 122077590592 122077590593 122077500640 Ed 122182490601 122182490603 122182490602 122172400010 Ab 122077500610 122181060000 122185000017 122185000011 122175300078 122175300010 122185000018 122 122185000007 122175300004 122175300002 Ac 185000010 122185000008 122175300012 122175300011 122185000019 122175300003 122175300001 122187500020 122185000063 122185000006 122175300013 122175300020 122175300021 122175300005 122185000020 122185000028 122170060010 122178888888 122175300017 122175300022 122175300023 122185000023 122185000049 122185000051 Ab 122184000000 122185000029 122185000048 122175300076 122175300024 122187500030 122184000000 122185000047 122175300026 122185000030 122175300076 122175600011 Ne 122185000046 122175300073 122175300030 122175600012 122178888888 122187500040 Eg 122185000031 122170060010 122175300029 k NorthWind Forest Consultants, LLC PO Box 1346 Chehalis, WA 98532 northwincfforest@comcast.net ST.ALBANS FPA: Site Plans Narrative: The project is located at St.Albans Girls Scout Camp in Belfair,WA. The project request is for FPA to harvest approximately 1.8 acres to expand and existing Horse riding and pasture area. The total area of this portion of the camp is 143 acres and the area to be disturbed by logging and clearing is 1.8 acres. Approximately 1 mile of existing road will be used to access the project. No new road construction will be required for the project. The soil type is Indianola loamy sand 5 to 15 percent slope. This specific area of harvest is less than 5%slope. This area does not have water entering or leaving the area on the surface. It is mainly subsurface drainage with no wetlands or stream located in the area. The operation will start upon approval of the permit by Mason County. The area logged will be made into pasture for the horses. The area will be planted with suitable grass for the horses. Stormwater Site Plan: 1. Construction access will be the use of existing all weather rock road. The site will be planted with grass upon completion of the project to stabilize the area. During logging the logs will be decked along the road with logging equipment staying off the road. 2. The clearing limits have been identified on the ground with orange flagging. There are no sensitive areas or resources that require buffers. Trees around the project will be left and the project is so small the preservation trees are not practical. 3. There will not be any sediment controls needed for the site in that it will be seeded with grass with no chance of the sediment leaving the site. The area to be harvest is not contiguous which will limit the opportunity for sediment to leave the site. 4. The proposed site has less the 5%slope with no evidence of erosion or soil movement on the site. It an expansion of an existing horse arena with grass,and no measurable slopes. The is no evidence of erosion or slope movement within the area the project in located on. 5. There are no constructed drainage features on the site. The SE corner of the project has a non jurisdictional wet spot that will be addressed through planting as to not create a mud hole. Joe Staley-NorthWind Forest Consuttants 'sue z33 - VSS MASON COUNTY O�© � COMMUNITY SERVICES FPA► O �- Mason County Bldg. 8,615 W.Alder Street, Shelton, WA 98584 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 1854 R-Er-FIVER FOREST PRACTICES APPLICATION/NOTIFICATION UEC 0 5 2016 Type IV General 0.15 W, Alder Sires# This application should be accompanied with an Environmental Checklist(SEPA) as well as an activity map/site plan which addresses items listed below. TYPE OR PRINT IN INK: 1. Landowner,Timber Owner and Operator information. Legal Name of LANDOWNER Legal Name of TIMBER OWNER Legal Name of OPERATOR $`Z' X413AN-5 `/u/s�' /l�aV?Jt�Wi�VA CC-Ko.sT L C[.c.ir6f-;5 u L C, Mailing Address: Mailing Address: Mailing Address: 4.PBol 3'1T" S�rz�c:T -P.e3, t o)c i3-9- City,State,Zip City,State,Zip City,State,Zip UN/VL-1z-jtry AticAr, WA qSIA4. CAW-14Au3i WA. 5R573Z Phone(410 6W `t Z_t 7 Phone( ) Phone(jkc ysp a 33 3 Email: Email: Email: 2. Contact person information. Contact Person Phone gip) n 3 J 3 JL'e -QV1,-4Co'y Pa^esT 66,vS44 4AV S Email 3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829. 4. Legal description where the forest practices will occur. Parcel Number Sub Division '/.'/. Section Township Range E/W Ialo 000alyellq vevq-- 'LrlliAJ 5. Answer each question as it applies to your proposed forest practice. a. (�JfJ No. [] Yes. Is the activity within an urban growth area? b. No. [] Yes. Is the activity within a public park? C. M No. [I Yes. Is the activity within 500 feet of a public park? Park name: d. [4 No. [J Yes. Is the activity located on lands platted after January 1, 1960? e. No. [J Yes. Is the activity within 200 feet of saltwater lake river/creek/stream pond wetland seasonal runoff slopes which exceed 150/o? Page 1 of 4 1ACommunity DevelopmentTLANNING\PAC 2016-Permit Assistance CenterTorest Practice updated 9/302016 f. What is the expected duration of FPA? y4A2 Proposed start date: /yov fA&& ?o/[o Proposed end date: �pecr._•1lbr,R. ?A[T 1 6. Are you cutting or removing timber? []No. QQ Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the activity map. Acres Volume to be Steepest Slope in Unit 9 Harvest Type Yarding Method net Harvested mb Harvest Unit Cd 40c GC: t C 7. Are you constructing or abandoning roads? D]No. []Yes. Complete the table below. Show locations and identify all road activities on the activity map. Total Length Steepest Side Slope Abandonment Date Type of Activity feet % o/Yr Road Construction Does Not Apply Temporary Road Construction Road Abandonment Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife (WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.gov/habitat.htm. 8. Are you installing or replacing water-crossings? DQ No. []Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map. Crossing Crossing Dimensions Crossing Crossing Dimensions Identifier T width x length) Identifier T width x length) 9. Mark the following activities that will be done in or over typed water. Activity in or over: Type I Stream Type II Stream Type III Stream Type IV Stream Type V Stream Removing culverts of bridges Equipment crossing Ground skidding Suspending cables Cable yarding Falling and bucking Other 10. Is any activity in a wetland or wetland buffer? b4 No. []Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map. Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area Identifier (I,II,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres) other 11. Describe how the following are identified on the ground. Page 2 of 4 1Xommunity DevelopmentTLAWNGTAC 2016-Permit Assistance CenterTorest Practice updated 8/302016 • Harvest boundaries/unit corners: c 1er% &e r44C4,1 a iar/,vim �di4 p • Right-of-way limits and centerlines for road work,culverts and bridges: N 14 • Critical areas and critical area buffer boundaries: N1A 12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American cultural resources? []No. M Yes. 13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance does not ensure compliance with the Endangered Species Act or other federal state or local laws. Signgture Qf LANDO E� Signature of TRABER OWNER Signer o PERATO (if different than landowner) (If er t that d Print name:('C fiA r" G C Wv lb Print name: t name: J6e 5/�OLt-1/ Date:/6 - -OC• G Date: ate: Additional information: (Optional) T74lz /',(A44/eTi� /� Tc� LXI�sgN/J A-M A�X/s7/nl4, /•/dtSNJ �OASTu2t+� Per Mason County Ordinance l 1.05, Section 11.05.120,a site map shall accompany this application which includes the following information. I Harvest boundaries and tree retention areas. II The approximate location of any structures. III The location of all existing and proposed streets,right-of-ways,easements,skid roads,haul roads,and landings within the proposal. IV The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping,open space,wildlife habitat,screening, and/or buffers. V Site topography at contour intervals of 40 feet. VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. VII Drainage ways and culverts. VIII Site area targeted for further harvest including proposed timing. IX North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. Staff asks that,at a minimum,the corners of the harvest unit(s)be flagged for clear identification. Page 3 of 4 hCommunity DevelopmenAPLAWNGTAC 2016-Permit Assistance CenterTorest Practice updated 8/30/2016 NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion control review.Projects which disturb more than one acre(regardless of total lot size)will require an engineered stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 1992 WSDOE Stormwater Manual(2005 in Belfair&Allyn UGA's).Applicants will be charged for Public Works staff time to review these plans and applications. Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a NPDES (National Pollution Discharge Elimination System)Permit. The threshold for such a permit is equivalent to Mason County's threshold. WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is not a perquisite for FPA approval. It is the responsibility of the applicant to obtain this permit when required. FPA FEE: $255.00 with SEPA SEPA FEE: 0-9.99 Acres$630 $375.00 without SEPA 10 to 20 Acres$755 Over 20 Acres$945 EIS(DS)$2,525+70/hr Departmental Review (For Office Use Only) Site visit: i Date aplKoved: 4 Mason County Community Services Page 4 of 4 1ACommunity DevelopmenAPLANNINGTAC 2016-Permit Assistance Centefforest Practice updated 8/302016