Loading...
HomeMy WebLinkAboutGRD Application - 5/5/1993 I;; to U \11 1 r, � MASON C ODNTY LAND MODIFICATION PERMIT MAY 0 5199' Depar=ent o' General Services 426 W. Cedar/P .O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628 #1 Owner_ Si to Add+--ess Ci ty St Owner Address_f� i �,y'_" Ci ty�R% Zip `^ ✓� Describe Work #2 Contractor Name .&C'L A,U Contractor Address Expirati on da rw AQ)'*t0� Ci ty St Zip Phone U81 #601 381 771 001 0001 #3 Engineer's Name 827 �eridcn Rd. 6'emerton, WA 98370 Phone# (206) 275-357r5 o i�n.c� 606 Address Ci ty St Zip #4 Parcel NO. Legal Description #5 Number of cubic yards to be excavated: Number of cubic ya_Tds to be filled: Number of cubic yards to be graded: #6 Will this be a balanced cut and fill entirely within the site? Yes �_ No . If NO: Will fill be brought on site? Yes No Where does imported fill originate from? Does fill contain any potentially hazardous mate_*-ials? Yes No #7 Will excavated materials be taken off site? Yes No _ If Yes: Where will excavated materials be taken? #8 Briefly describe existing terr azn, vege to ti on, and imprcvemen is on subject si te? #9 Has a soils report been completed on the subject site? If yes, include copy with application. #10 Does the subject site contain any of the following features? River Lake We t1 ands Sal twa te_T Slope greater than 15-t Soft compressible soils Seasonal Runoff None - #11 Will the proposed land surface modification change the points Where storm Water or -groundwater em tens or exits the site? #12 Will the proposed land surface modification change the quality, quancity, or velocity of storm wa ter/groundwa ter? �1 -, ' s the subject site wittin 200 feet of a designated shoreline? #i4 Wha-�it thods, if any, will be utilized to minimize erosion and poss ble sedimentation into nearby craters? #15 Will this land modification result in the redirection of any surface crater- runoff onto adjacent properties? #1 willre4r-face or subsurface runoff be collected or cont-rolled by rote--ceptors, c-,=taro drains, or other water collection devices once this land modification has been completed? #17 will the land be replanted upon completion? /=5 If yes, with what types of plants? #Z8 what are the lengths and hei the site? ghts of slopes currently existing on #19 will this modification result in slopes steeper than those currently on the site? If so, how steep? Show following on the site plan Directions to job site Lot Dimensions Flood Zones Existing Structures Fences Structure Setbacks Driveways Water Lines Shorelines Drainage Plan Topography Septic Systems Wells Proposed Improvements Easements Name of Flanking Street Name of Fronting S tree t I Scale: Date: