Loading...
HomeMy WebLinkAboutBLD2019-01072 - BLD Plot / Site Plans - 11/26/2019 I7(6 q or 'SUn CHANGES Oeu) PRIOR TO PERf-ORMING WORK "'F CHANGES FOR �� ?,k-6e(4 32at4- THFSE PLANS MUST BE ON THE JOB SITE FOR INSPECTION UST COMPLY WITH PERMIT A continuous foundation is required CONDITIONSentir e erlmeter of the structure. Full truss engineering must be available on site at framing inspection. MUST MEET ALL CURRENT WASHINGTON STATE CODES APPROVED MASON BUILDING INSPECTOR CHANGES SUBJECT TO APPROVAL - �—c�---DATEI�•24 -/9 Documents attached to approved plans: Site Plan—_Yft-- Flan review ch klist: _GCS- _ rgincering: 0 N Lateral Vertical ! umber of pages L f /.FGrS 5 FILE COPY S �VEO u UDFP 1y 2019 sus w qi c'er Street