HomeMy WebLinkAboutBLD2019-01072 - BLD Plot / Site Plans - 11/26/2019 I7(6 q or 'SUn CHANGES
Oeu) PRIOR TO PERf-ORMING WORK
"'F CHANGES FOR ��
?,k-6e(4 32at4-
THFSE PLANS MUST BE
ON THE JOB SITE
FOR INSPECTION
UST COMPLY WITH
PERMIT
A continuous foundation is required
CONDITIONSentir e erlmeter of
the structure.
Full truss engineering must
be available on site at
framing inspection. MUST MEET ALL CURRENT
WASHINGTON STATE CODES
APPROVED
MASON BUILDING INSPECTOR
CHANGES SUBJECT TO APPROVAL
- �—c�---DATEI�•24 -/9
Documents attached to approved plans:
Site Plan—_Yft--
Flan review ch klist: _GCS- _
rgincering: 0 N Lateral Vertical
! umber of pages L
f /.FGrS 5
FILE
COPY
S �VEO
u UDFP 1y
2019
sus w qi
c'er Street