HomeMy WebLinkAboutCOM Engineering / Geo-Tech Reports - 4/8/1999 04/U6/99 13:53 PAA 253 383 LJ!L Ario . n.Nt,iALrh1N6 ... 11Ai)h 11ERKU" LJUUI/
w
i'
L
__HODSDC
.
DA, ��� SEAN M.CO**
8
CIVIL &STRUCTURAL
PAUL B.MCC ORMI'.:
ENGINEERSkPLANNERS
Fax %nS gyCE erNTER DANIEL3.500=:.
DAMES R.CFc
DOREEN
THOMAS R RIC':'
To: Steve Perovich Date: April 8, 1999 LENzICKLER
WPC Project No.: 98260,10,Task
Project Name: Allyn Post Office
Regarding: Septic system Location
Fax No.: 851-6475
Phone No.:
WE ARE FAXING: (2)Sheets including the cover sheet. A hard copy will ❑ will not®be sent.
THESE ARE TRANSMITTED:
❑ For review and commient ❑ Approved as noted
® For your use ® As requested
❑ For approval
REMARKS:
Attached is the drawing you requested showing the location of the existing septic drainfield for All-
Town Center. This drawing is based on field mcasuremetid provided to us by you and drawings or.
record with the Mason County Health Department, specifically, the as-built drawing dated March a
1976,
Please call if you have any questions.
Signed: Dan Shaw P.E.
Project Manager
K:kCIVIL\YR 1998\98260\260FAX1 1 CTm PutoVIcH.DOc
221 S NORTH 30rH SrR!:q,,Stq%VW TACOM.Wok 96403 PH:(253)383.2422 FAX: 363-=2 ANOI.JNc9DLNETOOM.COM
/teaaCD 7A1o61
PRINCIPALS:
BL
GEOFFREY HOOSOON,P.E.,S.E.
ALUW E.BESSETTE,P.E.,S.E.
L
GEORGE J,LINDSAY,P.E.
RECEIVED SEAN M.COMFORT,P.E.
PAUL B.MCCORMICK,P.E.,S.E.
March 5 1999 MR 0 9 im A
AS80CIATEE:
MAQry,�C`o .pLANNt�G�. DANIEL L.BOOTH,P.E.,S.E.
IW��^� JAMES R.CARLSEN,P.E.
DOREEN S.GAVIN,P.E.
THOMAS R.HICKS,P.E.,S.E.
Allan Borden, Senior Planner LEN ZIC 0 ER,AICP,ASLA
Mason County Department of Community Development A
P.O. Box 578
Shelton, WA 98584
Re: Allyn U.S.P.O., Allyn, Washington Our Project No. 98260.10
Waiver of Buffer Requirements
Dear Allan:
Thank you for your response to AHBL's inquiry regarding the buffer requirements between
the proposed Allyn United States Post Office and the existing commercial building at the
Allyn Town Center in Allyn, Washington.
It is our understanding, based on your telephone call to us on March 4, 1999, that the Mason
County Department of Community Development will not require a twenty foot (20')
landscaped buffer between the proposed Allyn United States Post Office (Use Category II) and
the existing commercial building (Use Category V) located immediately adjacent to the north.
If our understanding is not correct, please advise us immediately. We appreciate your
continued assistance with this project. Thank you.
Sincerely,
Elizabeth Rivers, AICP/ASLA
Project Manager
ER/kdd
copy: David Boe ....
,.....
...
Wade Perrow
Steve Perovich
Dan Shaw
borden03.059
225 NORTH 30TH STREET SuaE 300 TAcow WA 98403 Pit(2.53)38.9-2.422 FAx(25.3)383-2572 aW_mc@ix•r*Wr.com
(n,i) S c,�
sFPrj c, t..ocw-r,c,�
c�PR 5�t'TE'�bar E-+.s�rr,our �
4i�oi _-- -
--
,si
..-. ... CaStweq �s
•�— }+ v � �ytIS�INY, �tnt.iL�!_rYreDth�L
41
k � � t '�2G rAQ.IL►V� SPAC+6S
tlo'i I I y S
__ OStAQL Yrc
S�4s¢ -{-
e�
4u Sn N a s=Te 115•i 20o s F
f:b b U C...
PAtWel ?lC.D` AM I lAib SF _0 1 I r� A llIFV C EN M-Z
�raposec� Nov B�� SBoo SF
DO'V40 OLD(6 1800 5� �`I S Q
l
701{"AL BWc.P4M 19416 9F- T`�^� -#
fAW0l6 5PAf£5 80 ER l 1 nrnv Mk4
Z1oi t
Sc1atE �il� gb► �{IGE�1rvA� 3
p 5D' t00
04/08/99 13:54 FAX 253 383 2572 AHb- t\ut\ttki\G 14ADE PERRO I¢J002i:
Z I 2/z
- -- -
-------•---- ----------------- v, ry
11 ry
�. ry
Oil
i---- -------- -- ------------ -----------r-- I�, / �' ------- ---- -
! p 1 � 'ry
iPIN
---- ------------ --- ------ i- 1--- -+- 4 / iy'• m
ti 9
------------------
---- ----------- -------- --- --
i k
---
r
�- --- ' CV
it
, y - i dap
0
' $� ' --- '---------
------------ ---- -- -- - --- -- j --- i--- x i--- ,
` /w
+ i S 3b0'00" E I , -
---- -- -----------�--- 30.00 M
to7.3
(133aLS zrinHos)