Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2023-01065 Solar - BLD Inspections - 2/29/2024
INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2023-01065 PROJECT ADDRESS 670 W DAYTON TRAILS DR SHELTON, WA 98584 PARCEL# 420087890122 PROJECT DESCRIPTION Installation of Solar array on garage OWNER BINNS ET UX JUSTIN ADDRESS TONI L CAMERON PHONE CONTRACTOR SOUTH SOUND SOLAR INC ADDRESS 4511 LEMON RD NE PHONE 360.352.7869 CONTRACTOR LICENSE SOUTHSS902N7 LENDER INSPECTION INSP DATE Comments INSPECTION INSP I DATE Comments Framing Inspection No I- I BLD-Final Inspection -DE Q 2 � T Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2023-01065 ROOF MOUNT SOLAR PANEL- RESIDENTIAL PROJECT DESCRIPTION: INSTALLATION OF SOLAR ARRAY ON ISSUED: 09/08/2023 GARAGE SITE ADDRESS: 670 W DAYTON TRAILS DR SHELTON EXPIRES: 03/06/2024 PARCEL: 420087890122 APPLICANT: BINNS ET UX JUSTIN OWNER: BINNS ET UX JUSTIN TONI L CAMERON TONI L CAMERON HOODSPORT,WA 98548 HOODSPORT,WA 98548 CONTRACTOR: South Sound Solar 4511 Lemon Rd NEOlympia,WA 98506 3603527869 GENERAL CONTRACTOR'S LICENSE: SOUTH SOUND SOLAR INC License: SOUTHSS902N7 4511 LEMON RD NEOLYMPIA,WA 98506 Expires: 08/27/2024 360.352.7869 FEES: Paid Due Solar/PV Base Fee $30.00 $0.00 State Fee-Residential $6.50 $0.00 Solar/PV Fee $19.00 $0.00 Final Inspection $80.00 $0.00 Technology Surcharge $1.60 $0.00 Building plan review per hour $80.00 $0.00 rate Totals : $217.10 $0.00 REQUIRED INSPECTIONS Framing Inspection BLD-Final Inspection CONDITIONS Printed by:Annie Wilson on:11/13/2023 10:57 AM Page 1 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2023-01065 * OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * Applicant has indicated this is a replacement unit. Prior to Mason County allowing any occupancy of the new proposed unit,the existing unit which is on-site and is being replaced MUST be removed from the parcel. * All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy code (WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth in the WSEC and international mechanical code. Printed by:Annie Wilson on:11/13/2023 10:57 AM Page 2 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2023-01065 The installation of solar(thermal or photovoltaic)energy systems to provide space heating or cooling, hot water and swimming pool heating shall conform to Chapter 23 of the International Residential Code, Chapter 14 of the International Mechanical Code, Uniform Plumbing Code,the International Fire Code, and be shall be listed and labeled in accordance with UL1703. Roof mounted panels shall weigh no more than 4 Ibs per square foot. Supports for solar panels are to be installed to spread the dead load across as many roof-framing members as needed to ensure that no point loads in excess of 50-Ibs are created. Panels may be installed on roof assemblies with a single layer of roofing material. Roof assemblies with more than one roofing material layer shall require an engineered analysis demonstrating that the roof will support the additional load of the solar panel system. Attachment to the roof shall be in accordance with manufacturer specifications provided during the inspection by the Mason County Building Inspector. Roof mounted equipment shall comply with the International Fire Code Section 605.11, including signage and access pathways. Roof access points shall not be located in areas where access ladders would block window or doors openings. Not less than two-3-foot wide access pathways shall be provided from the eave to ridge. Ground-mounted panels and modules, installation must be in accordance with the manufacturer's instructions and be available at time of inspection. Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use invertors listed for the utility interaction Collectors and thermal storage units shall be listed and labeled to show manufacturer's name, model number, serial number, collector weight, collector maximum allowable temperatures and pressures, and the type of heat transfer fluids that are compatible with the collector. Connections to potable water supplies shall be provided with backflow protection in accordance with the Uniform Plumbing Code. Solar energy systems containing pressurized fluids shall be protected with a temperature and pressure relief valve and be protected from freeze damage. Systems shall be equipped with means to limit the maximum water temperature of the system fluid entering or exchanging heat with any pressurized vessel inside the dwelling to 180 degrees Fahrenheit. Solar energy collectors, controls, dampers,fans, blowers and pumps shall be accessible for inspection, maintenance, repair and replacement. The roof shall be constructed to support the loads imposed by roof-mounted solar collectors and shall be constructed of noncombustible materials, flashed and sealed to prevent entry of water, rodents, and insects. The building inspector may require additional information, including an engineered design, to verify that existing roof or floor construction are adequate to support the additional load of the solar energy equipment. When required provide an engineered design for inspection. The existing framing prior to installation of the roof mounted solar must be upgraded in accordance with the engineering dated September 29,2023 from MC Squared stamped and signed by James Farley WA ST License number 47198. The following must be installed and inspected: The existing 2x6 rafters must have a new 2x6 added to create double 2x6's spaced at 48" on center, or at any locations which support a rack post. The double 2x6's may be nailed together with 10d nails spaced at 12"on center. The existing double 2x12 ridge beams must have additional 2x12's added to create a (4)2x12 beam. The(4)2x12's may be nailed together with 10d nails spaced at 12" on center. The existing 2x12 header above the large opening must have another 2x12 added to create a double 2x12 beam. The double 2x12's may be nailed together with 10d nails spaced at 12"on center. Printed by:Annie Wilson on:11/13/2023 10:57 AM Page 3 of 4 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2023-01065 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: .0in L'1 I�Jl hz 14. Contractor or Authorized Agent: Date: 3 ZD Printed by:Annie Wilson on:11/13/2023 10:57 AM Page 4 of 4 Justin Binns ROOF SPECS: 670 Dayton Traits Drive SLOPE 4:12 Shelton,WA 98584 TYPE COMP ARRAY LOCATED ON SHOP (630) 863-4135 Array Mounting: Justin@binns.com SNR ARRAY FT'=289.01 (1)APS RSD-S-PLC RAPID SHUTDOWN DEVICE PER MODULE Sales:Chad Brundage LOAD=<4psf DATE:08/29/2023 DRAWN BY:CJL 1-LINE DIAGRAM VERSION 1.0 0 CO SOUTH SOUND SOLAR UTILITY:MC PUD 3 N 360.352.7869 18"SPACING TO RIDGE OF ROOF CCB#SOUTHSS902N7 AHJ:LNI MASON CO D O a 0 STRING SIZE DETAILS PV/ESS SYSTEM SPECS' qiml D O OIL MPPT1: 7/7 14)SILFAB 410 BG MODULES= 5.74 kW(S.T.C.) MPPT 2:0 MAX POWER:410 WATTS ,-"' Vmp•38.07 VDC-Imp=10.77A MPPT 3:0 l• Voc•45.02VDC-IsC=11.35A (2)4/0 AL THHW L (2)2/0 CU THHN L (1)3/0 AL THHW N (1) 1/0 CU THHN N (2)#10 THHN WIRE PER STRING 14)APS RSD-S-PLC RAPID SHUTDOWN DEVICE W/#4 CU EG W/#4 EG 1)APS TRANSMITTER-PLC RSD CONTROLLER IN 2.5"PVC -------I IN 2.5"EMT/PVC I I LOCATED EXTERIOR 1 1)SOLARK 15K-2P INVERTER NEAR NET METER i (4)#10 THHN MAX PV POWER=19.5kW UTILITY I I LOCATED EXTERIOR _-W/#10 EG CONTINUOUS AC POWER TO GRID-15kW DISCONNECT IN 1"PVC, BURIED MPPT VOLTAGE RANGE=125-425VDC SERVICE I 2P 200A.FUSED I NEAR INITIATION CONTINUOUS AC POWER•62.5A I I RSD INITIATION 240VAC I LOCKABLE I ® SWITCH KNIFE OPERATOR I /BBLI DISABLE 2)FORTRESS eVAULT MAX BATTERY ROTARY,LOCKABLE LiFePO4 360AH 18.43kW I --(4)#18 THHN (2)2/0 CU THHW L NOMINAL VOLTAGE=51.2VDC I IN 3/4"EMT I (1) 1/0 CU THHW N FLOAT VOLTAGE=54.4VDC j W/#4 CU EG ABSORB VOLTAGE=55VDC LINE I LOCATED INTERIOR I IN 2.5" EMT/PVC REC.SHUTDOWN/LOW/RESTART VOLTAGE=51/51.4/51.8VDC GARAGE IMPEDANCE=0.005 OHMS AL SOL-ARK 15kW I MAX CHARGE/DISCHARGE CURRENT=185A NEr N•M I INVERTER METER GEC I 'ONM GRDN PVIN I LOCATED INTERIOR LOCATED INTERIOR I GARAGE SHOP LOAD IN AC GIN I MAIN PANEL SUBPANEL MOUNTING SPECS-B BLACK I PV Module(SIL-410 BG) � I CODA BUS SIEMENS 125A BUS 00 LOCATED EXTERIOR I 240VAC 2P 240VAC 2P 9 SNR RAILS/168'ea Dimensions: I © 4 SNR SPLICES 73.4"L x 40.5"W O 24 L FEET ATTACHMENTS Long Edge Primary Mounting eVAU(2)FORTRESS LT 18.43kWh EA I 2P CODA 2P 100A MCB MCB Zone: T T 24 SNR RAIL 10.1"-14.0" u ATTACHMENTS C 4 SNR GROUND LUGS Long Edge Secondary Mounting (2)2/0 CU THHN Zone: EACH ———————————————— I 8 SNR END CLAMPS 5.2-1D.1 2P 100A 24 SNR MID CLAMPS Short Edge Mounting Zone: 7.9"-9.8" MASON COUNTY COMMUNITY SERVICES Permit No:)5 22: 'dla6 PERMIT ASSISTANCE CENTER: •BUILDING •PLANNING •FIRE MARSHAL 615 W. Alder St-Shelton, WA 98584 www.co.mason.wa.us Phone Shelton:(360)427-9670 ext. 352• Fax:(360)427-7798 40) Phone Belfair. (360)275-4467• Phone Elma:(360)482-5269 PLUMBING & MECHANICAL PERMIT APPLICATION OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: i n nS NAME:south sound solar MAILING ADDRESS: PO BOY, '1I:1 MAILING ADDRESS:,4511 NE CITY: STATE: WA ZIP:g8S�S CITY: STATE: VjA ZIP:q�O(a 1"PHONE: PHONE: do - CELL: 2nd PHONE: EMAIL : Ros C SaU2%soumckofQ.r• GoM EMAIL: L&I REG#SpUr Uge1NT EXP. 06/ PARCEL INFORMATION: PARCEL NUMBER(I2 Digit Number): 00- - Q Zoning: LEGAL DESCRIPTION(Abbreviated):-re- l'd'.-a OF &&&Y, ( SITE ADDRESS: 00 h/. f)c'v1zn 7TV a; JS by. CITY: DIRECTIONS TO SITE ADDRESS:TN o h Hwy 10/, LAf+ on D"-Fvvt. A'rpv✓4' PA, y;1 h+ or' p Tray/S D►'• Noas c ;n o� r;9Hf TYPE OF JOB: NEW D= �T R=OTHER=USE OF BUILDING LOCATION OF FIXTURES/UNITS-I STT FLOOR=2No FLOOR=BASEMENT=GARAGE=OTHERO PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL UNITS Type of Fixture No.of Fixtures Fees Fuel Type:Electric=LPGE=Natural Gas=Ductless= Toilets Type of Unit No. of Units Fees Bathroom Sink Furnace Bath Tubs Heat Pump Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer Gas Outlets Kitchen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood Hose bibs Dryer Vent Other Solar Panel 1 Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER acknowledge submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OFTHIS PERMIT IS BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X 9/7/2023 Signature of Owner Date DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL Rev:1/27/2016 JBN