HomeMy WebLinkAboutMIS96-0811 Dock - MIS Permit / Conditions - 12/19/1996 MASON COUNTY
Mason County Bldg, III 426 W. Cedar
RO. Box 186 Shelton, Washington 98584
M 0 SGF' L. L. ANEt;1U—'cz; PV 1`1IVII 1 `1 FOR INSPECTIONS CALL 427-9610
MI S96--0811 PARCEL :3223352.89004 PLAT :BI_PL.0 DIVI BLK ; LOT :
JOB ADDRESS : E 6520 STATE ROUTE 106 UNION
APPLICANT : BLUE HERON CONDf)M I N I UM ASSOC 451-9199
OWNER : BLUE HERON COND41MIP4111M ASSOC 451 ---9199
LEGAL : BIUF. HERON CON00MINIUN PHAlf I Iff INT. UNIT 6-9 PH I UND. IFT. IN C0111101 ASF.AS I FACILITIES TSI J
PROJECT DESCRIPTION :
DOCK
ICE. MIT
PROJECT LOCATION : NULL A VOID aY EXPIRATION
AT EXISTING FIXED PIER AND DOCK
PROJECT NOTES ;
TYPE: AMOUNT 6Y DATE RE
PRMT 65 .25 KS 12/ 19/96 41(3"6
PICK 26 - 10 KS '12/ 19/96 43.,6E:6
STFE $ 4 .50 KS 12/ 19/96 43056
TOTAL - 9!i .H' _ NE R t)R Af;EN? - DATE .. _.
A:_^.tS!"RYt:.�:FR:'.J"..SST.`..::C.a"Y.'�<2�...Y.T.`...:StY..:F::� '�•^^
NI.S`_PAMT, rev, 0441M COMPLIANCE TO ATTACHED CONDITIONS IS
REou i RF D
CONCRETE . MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date PLUMBING by date by date by
Attic OTHER
Groundwork
date b date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
PF FAM t `T` CC:) ND 1 `r 1 (_:)N 3
Case No . . MIS963 0811
For - 13I_11F HERON CONDOMINIUM ASSOG
Pag0 9 1
1 ) The, proposed project musit be consistent with all appl icat"le policies and other
provisions the Shoreline Management Act , Its rules , and the Mayon Jaunty Shoreline
Master P aa�
X
2 ) Propose structure or any portion thereof greater than 3f in )eight from grade i ine,
must maIr►taln.. a minimum of 5 ' setback from a I I property Iines and easement Ilties and 10 '
from all _Wo i y andry State Road right of ways .
X
3 ) All approved p i anu are required to be on-- site for inspection purposes . If inspection
Is c,,aI Ied for and plan-, are not on site , Approval V4tli..l_. NOT be granted . in addition, a
Re- I nspe3ct I on fee In the (amount of $32 .00 per hour (minimum 1 hour ) will he oharged and
must: be oo iLect:ed by this department prior to any further i nspect: i ons being ;performed or
se►apnova i gr ht ed .
X
CONCRETE . MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date b
FRAMING date b Walls y FIRE DEPT. y
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
4 ) PURSUANT TO 1991 UNIFORM BUILDING CODE , SECTION 305(C) AND SECTION 513, ALL SITES MUST
HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE
AND LEGIBLE FROM THE STREET OR ROAD FRONTING; THE PROPERTY . MASON COUNTY BUILDING
DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIC{NS . A
REINSPECTION FEE , BASED ON RATES IN FABLE 3A OF 'rHE 1994 UNIFORM BUILDING CODE WILL BE
ASSESSED 1 OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPECT S .
X
5 ALI. CON fit •L I ON MUST MEET OR 1 XCUF1) AL-I LOCAL CODFS AND UBC
REQtII S
X.._
6 ) Changes to approved building plans that effect oompi iance to Ihf 1()91 Washington State
Energy Code, 1991 Ventilation and Indoor it Quality
Code, the Uniform Building Code and/car County llegu i at i onr must be approved by
Mason County prior to construotionX �.
i
7 ) CONSTRUCTION PROCFSS 10 BE FIELD CORRECTED A EQ IRFC) PER MASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE .x
8 ) Water qua I i ty I s not be I ng degraded to the detr Invent of the aquatic environment as a
result of this project .
1
t
9) A water quality standards mod i f i rat. i on will he r equ I rQd r )he Department of E cry logy
for this project (WAC 173-201 --035(8 ) (e) ) ,
l
CQNCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date by
Toundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING
Attic OTHER
Groundwork
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
' I
4
J