Loading...
HomeMy WebLinkAboutRLC95-0331 for BLD95-0677 - RLC Inspections - 5/22/1995 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT RESOURCE LANDS AND CRITICAL AREAS C CKLIST Permit Number ��� W7 I RLCt1 Owner Parcel Number _ 1 v - ❑_ 1. Saltwater shoreline or lake 20 acres or larger? 0 Name of Water Body ❑ 2. Rivers, streams. or creeks with year round flow? ' r Type of Other Water ❑ 3. Rivers, steams or creek with intermittent flow but are within a clearly defined channel?o%j ❑ 4. Lakes or ponds less than 20 acres in size? ❑ 5. Wetlands: Areas that are inundated or saturated by surface water that under normal circumstances support vegetation adapted for life in such conditions;such as marshes,bogs, and swamps_ rj i) 6_ Slopes greater than 15% (8.5 degrees)? On Landslide Hazard Map? ',6 of Slopes ❑ 7. Floodplains? 0 ❑ 8. Seismic Hazard Areas? ❑ 9. Agricultural Open Space Taxation Program? (�(� ❑ 10. Open Space Timber Taxation Program, or Designated forest or Classified Forest? ❑ 11. Site has�n�opResource Lands or Critical Areas. Comments: C// L �L� 'U � ���a�"�i� /i]I ��• S�� la �c e a VDLd- A(!t11ufiz<< Sic��t i : , Date MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Planning Division 426 W. Cedar, P.O. Box 578, Shelton, WA 98584 (206) 427-9670 DATE: 05/22/95 TO: JAMES CONNER 4447 144TH AVE SE BELLEVUE WA 98006 RE: RESIDENCE Case No. : RLC95-0331 Parcel No. : 322345100005 Dear Applicant : As part of this department ' s review on your permit application, a Resource Lands and Critical Areas (RLC) site inspection was performed on your property. Below you will find comments made regarding the proposed development and it ' s critical values . In some cases, setbacks for development from steep slopes, streams, wetlands, and waterbodies must be included in your specific proposal; these setbacks are included as part of the comments listed below. Please contact me at (206) 427-9670 or (206) 275-4467, ext . 295 if you have any questions . Sincerely, H 74eo ores , Land Use Planner Department of Community Development COMMENTS : There are steep slopes (18-25%) along property. Present proposal does not affect slope stability. Revegetation of slopes after project should be done to avoid future soil erosion. RLC, rev. 06/09/94