HomeMy WebLinkAboutSEP95-103 - SEP Determinations - 5/16/1995 MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning-Landfill-Utilities
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
Description of Proposal :
Construct 60 feet long by 6 feet high reinforced concrete bulkhead. New
wall to be built in same location as existing rock wall which will be
removed.
Proponent : ALLEN SHEARER
Location of Proposal : NE 13081 NORTH SHORE RD BELFAIR
PARCEL#:322345000028
MADRONA MORNINGSIDE BCH TRACTS TR 28 & T.L.
13 . 8 MILES DOWN NORTH SHORE RD GO LEFT ON MADRONA MORNING SIDE 4TH PLACE
ON LEFT BLUE HOUSE.
Lead Agency: MASON COUNTY
The Lead Agency for this proposal has determined that it does not have a
probable significant adverse impact on the environment . An Environmental
Impact Statement (EIS) is not required under RCW 43 .21C. 030 (2) (c) . This
decision was made after review of a completed Environmental Checklist and
other information on file with the Lead Agency. This information is
available to the public upon request. MITIGATION MEASURES ARE
ATTACHED.
This DNS is issued under 197-11-350 (2) , the Lead Agency will not act on
this proposal for 15 days from the date below. Comments must be
submitted by 05/31/95 .
DATE: 5/16/95
'5--/W/ �5,g
Signatur o e ponsible official Date
Responsible Official : Gary Yando
Director of Community Development
426 W. Cedar,
PO BOX 578
Shelton, WA 98584
(206) 427-9670
MIT DNS, rev: 07/07/92
CC: WDOE, WDFW, WDNR, USACOE, Skokomish Tribe (2) , Applicant
i
MITIGATION MEASURES
Allen Shearer/MIS 95-0287
Bulkhead, replacement
1 . New concrete bulkhead shall be located no further waterward
than existing toe rocks, excluding the isolated toe rocks extending
waterward of the majority. This line corresponds with southwest
corner of existing boathouse, 3rd step down from top of stairway
and to southeast corner of existing boathouse on property to west .
Conditions issued on WDFW Hydraulic Project Approval may further
restrict location.
2 . Old rock shall not be left on beach.
3 . Stairway shall be fully recessed into bulkhead, or cantilevered
in front of and parallel to bulkhead such that only the lowest base
stair rests on beach.
4 . Temporary erosion control measures shall be implemented to
minimize water quality impacts during construction.