Loading...
HomeMy WebLinkAboutBLD2012-00734 ReRoof - BLD Permit / Conditions - 9/26/2012 b Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 lr Shelton, WA 98584 f,, RESIDENTIAL BUILDING PERMIT BLD2012-00734 OWNER: BOB COBLE RECEIVED: 9/26/2012 CONTRACTOR: HANLEY CONSTRUCTION 1.360.876,0870 LICENSE: HANLEC1034DP EXP.- 10/13/2012 ISSUED: 9/26/2012 SITE ADDRESS: 12951 NE NORTH SHORE RD BELFAIR EXPIRES: 3/26/2013 PARCEL NUMBER: 322345000017 LEGAL DESCRIPTION: MADRONA MORNINGSIDE BCH TRACTS TR 17 &T.L. PROJECT DESCRIPTION: DIRECTIONS TO SITE: RE-ROOF PERMIT ST RT 3 TO BELFAIR L ON ST RT 300, THEN NORTH SHORE RD, TO SITE ADDRESS ON TH SIDE (-�A General Information Construction&OccupancyWR Square Footage Information No.of Bedrooms: Type of Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Lot Size: Deck: Type of Work: RR F DI 2 No. of Stories: cBuilding: Valuation: Building Heig t: Basement: Manufactured Home Inf rmation 4etback Inforn)kioqj Shoreline& Planning Information Make: Length Ft. Leide2: �4Ft Shoreline: Ft. Water Body: Slope: Ft. SEPA?: Model: Width: Ft. Ft. Shoreline Desig.: Year: Serial No.: Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Q y. Type Qty. Type By Date Amount Receipt Building State Fee GMM 9/26/2012 $4.50 S1201200000001 Re-Roof Fee GMM 9/26/2012 $ 117.50 S1201200000001 Total $ 122.00 BLD2012-00734 Please refer to the following pages for conditions of this permit. Page 1 of 3 f CASE NOTES FOR BLD2012-00734 CONDITIONS FOR BLD2012-00734 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X vh-r"' 2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X I/ln .I 3) Single rafter joist roof replacement shall be insulated to a minimum of R-38 allowing for a minimum of one-inch continuous vented airspace above the level of insulation. X y-,, .r 4) Existing roof deck shall be insulated to a minimum of R-38 if: The roof is un-insulated or existing insulation is removed to the level of the sheathing, OR All insulation in the roof/ceiling was previously installed exterior to the sheathing or non-existent. X ins . F 5) WIND,LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. X Vti 6) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. X w, 7) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. x _►- BLD2012-00734 Please refer to the following pages for conditions of this permit. Page 2 of 3 8; CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X tM F 9) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. x iM .F 10) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X Ins _F:' This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason >County access to the above described property and structure for review and inspection. // OWNER OR AGENT: n2� e� DATE: 9 2 V 1 2 BLD2012-00734 Please refer to the following pages for conditions of this permit. Page 3 of 3 o CONCRETE MECHANICAL MANUFACTURED HOME 0 Date By N Footings/Setbacks Gas Piping Ribbons r o Intenor Date By interior-Date By Dam g M f AExterior Date By Exterior-Date _ Bsety Point Load!Isolated Footings INSULATION Date By 00 BG!SLAB INSULATION ---------- ---- Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date By Data By DECKS F RAM I NG Walls Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Date By Date By Type. Date By D wv DRYWALL Type- Int.Brace Wall Date By Date By W Date By FINAL INSPECTION 0 v 0 Water Line Fire Separation N cu m Date By Date By Date By m N g Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments w CD o � 0 cn v cn CD 0 0 0 0. o' N O r S y (D 3 m co CD 0 w sox cony MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Bldg. III, 426 West Cedar Street - PO Box 186, Shelton, WA 98584 1854 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 NON-STRUCTURAL RE-ROOF APPLICATION Roof Slope: I';�• iA Old Roof Material: MC-4 i New Roofing Material: W-d r _ I Sheathing: ' Underlayment: Ci� t J Existing Insulation: /y/ A New Insulation: N A Use of Structure(s) - (i.e. garage, dwelling, etc.): Roof Slope: IRC section R904.1 Roof slope must be indicated to ensure selected roof covering is allowed on designed pitch. Roof Covering: IRC section R905 Selected roof covering must be installed in accordance with manufacturers specifications and IRC requirements. Insulation:WSEC 101.3.2.5 exception 2a&2b Existing roofs shall be insulated to the requirements of this Code if: a) The roof is not insulated or insulation is removed to the level of the sheathing or, b) All insulation in the roof/ceiling was previously installed exterior to the sheathing or non-existent. Attic Ventilation::.1RC section 806 Enclosed attic and rafter area shall be supplied with cross-ventilation.The net area shall not be less than 1/150 of the area of the space to be ventilated. If 50%and not more than 80%of the ventilating area is provided from the upper portion of the space to be ventilated,then 1/300 is allowed. Applicant/Owner: Contractor: E" Parcel No: Permit No.: Signature: Date: —t'oC �— DCDBuilding re-roof application.(revised 7.2012) 3h0— 4 z 1 - 77qoQ �nu..uc ck fof� -Fo� Mrs o-7� Cyy f J , S CL7N5TR1JCTlON Email: sales@iroofit.com•Website:www.iroofit.com•Fax: 360-769-9688 General Contractor#:HANLEC-1034DP•PO Box 865,Port Orchard,WA 98366 Port Orchard 360-876-0870•Bainbridge Island 206$42-4321•Gig Harbor 253-851-0113 This proposal is specifically pre ared for: h J � p Name: Bob Coble ,WXW Date: 8/21/2012 Project: Roof Replacement—Coble Residence \ Phone:N/A Street: 12951 North Shore Rd Cell:�360) 528-0919 City: Belfair Zip: 98528 Email: b.coble@comeast.net We hereby submit this proposal for the following products and services: Options 1&2.-Roof Replacement—Coble Residence: 1. Prepare area surrounding residence with necessity equipment to protect structure,yard, landscaping,etc. during duration of project. 2. Remove existing roof system. Haul all debris to an authorized waste collection facility. 3. Inspect for any rotten and/or defective substructure. Replace only if necessary at$65 per man-hour plus material costs. Client to be notified prior to any additional work being performed. 4. Install one of the following standing seam metal roof systems: Option 1—Taylor Easy-Lock 26 Gauge Standing Seam Metal Roof System Option 2—Taylor Easy-Lock 24 Gauge Standing Seam MetalCfmish 5. All standing seam roof panels and accessory flashings to have Kynar 500 6. Install a continuous ridge ventilation system. 7. Install all new plumbing fleshings,chimney flashings and roof flashingsa ��8. Roofing system includes a 20-year manufacturer's warranty.9. Clean jobsite of all roofing related debris at completion of project. 10. Provide sanitation services while onsite.11. Perform onsite quality control inspection with client at completion of pro The pricing for the above-mentioned products and services are as follows: Option 1• Taylor t Easy-Lack 26 Gauge Family owned and operated since 1980. As usual, the Hanley Construction Lifetime Workmanship Guarantee applies. Sales Taz not Inc7uded Acceptance or Proposal: This quotation valid far thirty(30)days. Payment no above prices,specifications and conduions are Customer signature: Terms:15%deposit due upon acceptance of proposal. satisfactory and hereby accepted.The signing of this Remaining balance due upon completion of proice, proposal authorizes Hanley Comslruction Inc,to provide Any unpaid balance including any applicable late fees all materials and services as specified. In no event shall and/or attorney few incurred in coUntion will bear Hanley Construction be liable for consequential or interest at 18 A per annum until paid in fall. Acquisition incidental damages,asbestos andror lead paint and cost of any and all permits is the responsibility of abatement,and mold or algae growth of any type. Y ®Y�(l rl �n � Customer. Hanley Construction shall not be liable to Signing of this proposal acknowledges that customer Hanle Construction Inc.: 1 I. recalibrate or remount say electrical devices on roof has received,read and accepted the"Notice to (Satellite dishes,emermas,etc.) Customer,statement.