Loading...
HomeMy WebLinkAboutMEP2013-00024 Boat Rails - MEP Permit / Conditions - 9/10/2013 �oN_STArt- MASON COUNTY A o (ft DEPARTMENT OF COMMUNITY DEVELOPMENT oN z Planning Division T z� N Y ti P O Box 279, Shelton, WA 98584 00 o (360)427-9670 1864 MASON ENVIRONMENTAL PERMIT September 10, 2013 KOEHUBREEDEN 10505 118TH PL NE KIRKLAND WA 98033 Parcel No.: 322345000014 Issued: 9/10/2013 Case No.: MEP2013-00024 Project Description: Proposed new boat rails on Hood Canal property; 5 ft. wide, and 20 ft. long above and 50 ft, forward of ordinary high water mark; set on short concrete piers. The following critical areas are present on this property: Long-Term Commercial Forest XX FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Authorized Local Government Official Date I Mason Environmental Permit 9/10/2013 Case No.: MEP2013-00024 Conditions: 1.) Site Plan Approved per dimensions of structures and setbacks on submitted site plan; the June 28, 2013 plan has the configuration of retaining walls, rails, and support posts extending to 50 ft. total length that are subject to this review. X Resource Ordinance The applicant acknowledges that the project will be completed as proposed, so that the project will be consistent with all applicable standards of the Mason County Resource Ordinance. Future work within the vegetation buffer and shoreline critical area will be reviewed by the Dept. of Community Development prior to starting such work X Shoreline Management Act The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline Master Program. X WDFW Hydraulic Project Approval A Hydraulic Project Approval from the Washington State Department of Fish Wildlife must be granted prior to construction. For more information contact Habitat Biologists Gloria Rogers (Freshwater) at 360-249-1293 ext 249 or Margie Schirato (Saltwater) at 427-2179. X U.S. Army Corps of Engineers Review Section 10 (Rivers and Harbor Act) or Section 301/404 (Clean Water Act) compliance must be demonstrated through permit or authorized exemption by the Army Corps of Engineers prior to work within navigable waters or wetlands under Corps jurisdiction. X Construction Debris Removal All construction and demolition debris must be removed from the shore area after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X Concrete Leachate Concrete leachate must be contained during pouring, such that water quality degradation of adjacent waters does not occur. X Work must be done in the dry time periods or low tide to help prevent disturbance of unstable soil layers and uncontrollable mass wasting in work area. X 9/10/2013 Page 2 of 2 MEP2013-00024 i VMASON ENVIRONMENTAL PERMIT($630 or CO) /other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) MEP o20 1 3 -Q � ❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32,36.70A,39.34, 58.17, 76.09, 84.33,84.34 and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER /��� Name: ZV1Ah9- A// EIfe, 9�- A /4w BRL-PEA Mailing Address: /6570,5 HFT-`N &E Alte4-41VP A1.4 GF&13 Work Phone: Email Address:� - G �Cp►rtg9S Ta NET Home/Cell Phone: (412-� ��g-3��j`f Fax#: If an agent is acting for the property owner during the permit process, complete#2. 2. AUTHORIZED AGENT Name: Pik�2 l� L40 AJ5TRtJG'T70/V /, (-TCFF— C ,/* Mailing Address: D foX 391 l l ye✓ PhaAkf- one: 3k0 779-18Zo Email Address: �, CD ON 1,CGWI Home Cell Phone: 3(0� 3yo - 702 Fax# 3.PROJECT SITE Site Address: /2- 9 o-LI aVE N,02 7-ATI-1D/ Parcel #: 3a�-34 - 56 - d0o 4Legal Description: Directions to Site: Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. 1'.t rn3rur3ii;r I?eveli r u`,i'�C' itfi' Pcv)weJ A t,2WO 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 X Fish&Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 17.01.062 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify current use of the property with existing improvements: 13047- (A) 1 t U 7v LA VAIC 14/RFMyV5 /304T Fi2VMN. 6. Identify and describe the proposed project, including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets, if needed): /. IkVN�/Zx j'A-AS PIAS rd /R,�. T��3� w11� I�r�9 �ur� Auni&D 1/0277 C*6 ON THE 12FAG/-1 AMP A'CIS AS FPn1S M /200- ebtU E 77&_ Qs / mr A11/1B�4T/�"Addvc �t� rqv�' #�,oK ✓�T�O /HARb«1316rzW sWIOOn � C0VCt-r7F /At CArrewl- Bey�TStor MV4eA.,GU.S I SoA T QA+/4s /3 y v7r*c t 417 ro SLA�3 f! PrEi2s, 7. Describe why the action requiring this permit cannot be avoided. 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes No 9. Ident' any surface water on or adjacent to property(circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Ide eptic/sewer connection(circle one): If septic is located on project site, include records. Connected to Septi Connected to Community Septic 11. Identify existing water supply(circle one): Public Water Supply el 11. Type of Job(circle one): New Add Alteration Repair Demolition Other: Print Name Signature Date 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas, Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area, Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 X Fish&Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 17.01.062 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify current use of the property with existing improvements: I3IM-K IJAP-1) of 4 /A/6/C-- ISIA41/y 304T- C146'I/I T�( 7-0 tA VIVC N1WAVLt--_- 304T APM4 11 1 6. Identify and describe the proposed project, including the type of materials to be used, construction methods, principle dimensions, and other pertinent information(attach additional sheets, if needed): A /iVS7W 1-L1Z11 x .3'AbS AMS776 PXa 7-#6-.R1,oe- w1/( 7'kbtlg *VO bole--D V07-IC -t ON TIDE.. .410 AQTS AS A&OMS 77) /_&AR e0AJC&M P1,4_S. 7AE ME *16 gr oll(sr,7-/q"Ad�v� �strN Y��� N fK A4�EsT�D /uPAbIE'13r6EGow Sf//R� � /-bu.2 cewcvt-TF /A, cgrre H.f' SnA A e e . /NSI I 8,64 7 'R-414S 13 y 477*'-A(i17 rd_SM 5 /f° PIE,eS' 7. Describe why the action requiring this permit cannot be avoided. 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes No 9. Identif any surface water on or adjacent to property(circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Ide t7lA septic/sewer connection(circle one): If septic is located on project site, include records. Connected to Sept1 Connected to Community Septic 11. Identify existing water supply (circle one): Public Water Supply ell 11. Type of Job(circle one): New Add Alteration Repair Demolition Other: Print Name Signature Date