Loading...
HomeMy WebLinkAboutSEP2019-00013 - SEP Determinations - 5/3/2019 MASON COUNTY DEPARTMENT OF COMMUNITY SERVICES MITIGATED DETERMINATION OF NONSIGNIFICANCE SEP2019-00013 Description of This SEPA is associated with the Proposal: construction of beach stairs and a landing located landward of the ordinary high water mark. Proponent: Rod Meussner Location of Proposal: 8532 E. SR 106, Union, WA. Parcel Number: 322344470824; 322344490012/-90011 Legal Description: Lot 1&2 of SP#3049 PTN GL 1 Survey 24/53 The Lead Agency for this proposal has determined that it does not have a probably significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency.This information is available to the public upon request. Please contact Ron Buckholt at ext. 287, or rbuckholt@co.mason.wa.us with any questions. This DNS is issued under WAC 197-11-340(2).The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, 615 W Alder St, Shelton WA 98584 by 5/17/2019.Appeal of this determination must be filed within a 14-day period following this final determination date,per Mason County Code Chapter 15.11 Appeals. Date:5/3/2019 Ron Buckholt,Senior Planner Conditions: 1. Proponent shall obtain all necessary state and federal permits prior to the commencement of any work. 2. Proponent shall adhere to the findings and recommendations stated in the Geological Reconnaissance Report authored by Resolve Environmental and Geotechnical, Inc., dated January 3, 2019. 3. Proponent shall adhere to the findings and recommendations stated in the Habitat Management Plan—Floodplain Assessment,authored by Resolve Environmental and Geotechnical, Inc.,dated March 15, 2019. 4. Temporary erosion control, such as silt fencing shall be installed and maintained for the duration of the project in all disturbed areas in order to prevent sediment run-off from entering the regulated waters of the shoreline. 5. The proposed stair case and associated equipment/material/construction staging areas shall not be placed waterward of the ordinary high water mark(OHWM). 6. Proposed stair case shall not exceed 4 ft in width and the landing shall not exceed 50 sq. ft. 3q&A -660 0 3 T" Mason County, WASHINGTON ENVIRONMENTAL (SEPA) CHECKLIST 1. Name of proposed project, if applicable: " `<C F1VF Meussner stairs NR O 2. Name of applicant: IN Rod Meussner /aerstree t 3. Address and phone number of applicant and contact person: Applicant: Rod Meussner 7005 218t" Ave. NE Redmond, WA. 98053 Tel. (206)730-7459 Contact: Peter Brockman, Brockman Builders Inc. P.O. Box 186 Kingston, WA. 98346 Tel. (360)638-1125 4. Date checklist prepared: February 27, 2019 5. Agency requesting checklist: Mason County Community Development 6. Proposed timing or schedule (including phasing, if applicable): Construction will begin Spring 2019. Approximately 1 week construction period. 7. Do you have any plans for future additions, expansions, or further activity related to or connected with this proposal? If yes, explain. None is planned at this time. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal: Geotechnical reconnaissance by Resolve Environmental & Geotechnical dated 1/3/19. 1 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. None known. 10. List any government approvals or permits that will be needed for your proposal, if known: 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do ngot need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) The request is to construct single family residence stairs from the top of the bank to the toe of bank, approximately 22 feet in length, landward of the ordinary high water mark with let down stairs to beach level. The staircase will be wood frame construction approx. 110 sq. ft. Drawings attached. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The project is located at parcel #32234-44-90012 / #32234-44-90011 8532 E. State Route 106, Union, Wa. 98592. Legal Description: LOT 1 & 2 of SP #3049 PTN GL 1 Survey 24/53 2 EVALUATION FOR AGENCY USE ENVIRONMENTAL ELEMENTS To be Completed by Applicant 1. Earth a. General description of the site (bold one): Flat, rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? Steepest slope on bluff is approx. 45 degree slope. C. What general types of soils are found on the site (for example, clay, sand gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Everett gravelly sandy loam d. Are there surface indicators or history of unstable soils in the immediate vicinity? If so, describe. No indications of deep rotational landslide failures are apparent. See geotechnical reconnaissance by Resolve Environmental & Geotechnical dated 1/03/19. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. None. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Minimal clearing during construction phase as required for structural support postholes for stairway and deck. Best Management Practices (BMP) will be followed throughout the development process as needed. 3 EVALUATION FOR AGENCY USE g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? Approximately 15% impervious surface. Stairs will have openings between stair treads. h. Proposed measures to reduce or control erosion, or other impact to the earth, if any: Best Management Practices (BMP's) will be used throughout the construction. This includes: vegetation retention, filter fabric fence, stabilized construction entrance as needed. 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. None expected. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No. C. Proposed measures to reduce or control emissions or other impacts to air, if any: No emissions expected. 3. Water a. Surface 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If 4 EVALUATION FOR AGENCY USE appropriate, state what stream or river it flows into. Site next to saltwater— Hood Canal 2) Will the project require any work over, in or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes. Stairway will be constructed from the top of bank to the toe of the bank adjacent to Hood Canal, site plan and drawing attached. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. Unknown. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground 5 1 EVALUATION FOR AGENCY USE 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. No 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals, agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None. C. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. No significant added runoff to the site. 2) Could waste materials enter ground or surface waters? If so, generally describe. No. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: Adhere to Mason County requirement for stormwater runoff. 6 EVALUATION FOR AGENCY USE 4. Plants a. Check or bold types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other X shrubs X grass pasture crop or grain wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation: b. What kind and amount of vegetation will be removed or altered? Minimal grass vegetation removed as needed for structural support postholes for stairway. C. List threatened or endangered species known to be on or near the site. None known. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: No such measures are proposed. 5. Animals a. Bold any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site. EVALUATION FOR AGENCY USE None known. C. Is the site part of a migration route? If so, explain. The subject property is not known to be part of a migration route. d. Proposed measures to preserve or enhance wildlife, if any: No such measures are proposed. 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. None. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None. 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. None are anticipated. 8 EVALUATION FOR AGENCY USE 1) Describe special emergency services that might be required. None. 2) Proposed measures to reduce or control environmental health hazards, if any: Meet all Mason County provisions. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Short term: Sources of noise will be construction activity and will be limited to 7:00 A.M. to 6.00 P.M. Long term: None. 3) Proposed measures to reduce or control noise impacts, if any: Construction activity will be limited to 7 am to 6 pm. Vehicles will use properly maintained exhaust systems, and engines will be turned off when not in use. 9 EVALUATION FOR AGENCY USE 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? A single-family residence currently occupies the site. To the West and East are single family residences. b. Has the site been used for agriculture? If so, describe. No agricultural uses have occurred in the recent past. C. Describe any structures on the site. Single family residence. d. Will any structures be demolished? If so, what? No. e. What is the current zoning classification of the site? The site is zoned RR (Rural Residential). f. What is the current comprehensive plan designation of the site? The Mason County Comprehensive Plan designates the site Rural Residential. g. If applicable, what is the current Shoreline Master Program designation of the site? Shoreline Residential h. Has any part of the site been classified an "environmentally sensitive" area? If so, specify. Unknown. i. Approximately how many people would reside or work in the completed project? None, the project is for exterior stairs. 10 EVALUATION FOR AGENCY USE j. Approximately how many people would the completed project displace? None will be displaced. k. Proposed measures to avoid or reduce displacement impacts, if any? None. I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: All construction will be consistent with the applicable Mason County codes. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high-, middle-, or low-income housing. No additional units are proposed. b. Approximately how many units, if any, would be eliminated? Indicate whether high-, middle-, or low-income housing. None will be eliminated. C. Proposed measures to reduce or control housing impacts, if any: None. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? Approx. 6 feet will be the tallest height of the proposed structure. b. What views in the immediate vicinity would be altered or obstructed? 11 EVALUATION FOR AGENCY USE No views of adjacent properties would be obstructed or altered. C. Proposed measures to reduce or control aesthetic impacts, if any: Pleasant design and quality materials and construction 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? None is anticipated. C. What existing off-site sources of light or glare may affect your proposal? None. d. Proposed measures to reduce or control light and glare impacts, if any: None. 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? Boating, Fishing, Beachwalking b. Would the proposed project displace any existing recreational uses? If so, describe. No. 12 EVALUATION FOR AGENCY USE C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: The completed project will provide recreation opportunities for property owner and guests. 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. None known. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. No landmarks or evidence of historic, archeological, scientific, or cultural importance are known to exist on or next to the site. C. Proposed measures to reduce or control impacts, if any: None are proposed. 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. The site is serviced by E. State Route 106. The existing driveway will access the existing street system. b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? No, the nearest transit stop is as provided by Mason County Transit buses. 13 EVALUATION FOR AGENCY USE C. How many parking spaces would the completed project have? How many would the project eliminate? No additional parking spaces are proposed nor will be eliminated. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). None will be required. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. The completed project will not generate additional vehicular trips. g. Proposed measures to reduce or control transportation impacts, if any: None are proposed. 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No. b. Proposed measure to reduce or control public service impacts, if any: No mitigation is proposed. 16. Utilities 14 EVALUATION FOR AGENCY USE a. Underline utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. No utilities are proposed for the project. 15 SIGNATURE The above answers are true and complete to the best of my knowledge. 1 understand that the lead agency is relying on them to make its decisions. Signature: Date: 7/9 16 MASON COUNTY DCD SEPA Contact List Sent SEPA 'DIq-E=5 to (check all that apply) on ;131 I q : M tick-=( Skokomish Tribal Nation,Nat.Res.Dept. WA Department of Commerce ATTN:Julian Sammons reviewteam@commerce.wa.gov N 541 Tribal Center Rd.,Skokomish Nation,98584 jsammons@skokomish.org U.S.Army Corps of Engineers dsarff@skokomiosh.org SEPA Reviewer-Jason Sweeney Skokomish Tribal Historic Preservation Officer PO Box C-3755, Seattle,98124 ATTN: Kris Miller Jason.t.sweeney@usace.army.mil 80 N Tribal Center Rd,Skokomish Nation,98584 shlanay1@skokomish.org WA Dept.of Fish and Wildlife Quinault Indian Nation SEPAdesk@dfw.wa.gov ATTN: Mark Mobbs PO Box 189,Tahola, 98587 WA Dept.of Fish and Wildlife mmobbs@quinault.org ATTN: Chris Waldbillig Squaxin Tribal Nation,Natural Res.Dept. 450 Port Orchard Blvd,Suite 290 2952 SE Old Olympic HWY, Shelton 98584 Port Orchard,WA 98366 jdickison@squaxin.us Chris.waldbillig@dfw.wa.gov emarbet@squaxin.us szaniewski@squaxin.us WA Dept.of Fish and Wildlife rfoster@squaxin.us ATTN: Darrin Masters The Confederated Tribe of the Chehalis 450 Port Orchard Blvd, Suite 290 ATTN: SEPA Reviewer-Glen Connelly Port Orchard,WA 98366 420 Howanut Rd., Oakville,98568 Darrin.Masters@dfw.wa.gov gconnelly@chehalistribe.org WA DNR,South Puget Sound Region WA Dept.of Fish and Wildlife 950 Farman Avenue N, Enumclaw,98022-9282 ATTN: Allison Cook southpuget.region@dnr.wa.gov (Habitat Biologist-S Puget Sound Watershed) WA DNR,Aquatic Resources 1111 Washington St SE,Olympia WA,98501 PO BOX 47027, Olympia,98504-7027 allison.cook@dfw.wa.gov ard@dnr.wa.gov DNR, WA DNR,SEPA Center � WA Dept.of Transportation ATTN: External Coordinator ATTN: Dale Severson PO BOX 47015,Olympia,98504-7015 P.O. Box 47440,Olympia 98504-7440 sepacenter@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov Olympic Region Clean Air Agency ATTN: Lauren Whybrew City of Shelton 2940-B Limited Ln. NW, Olympia. 98502 ATTN:Jason Dose lauren.whybrew@orcaa.org 525 West Cota St., Shelton 98584 Mason County Transit jasond@ci.shelton.wa.us ATTN: Danette Brannin 790 E Johns Prairie Rd,Shelton,98584 F-1 Port of Shelton dbrannin@masontransit.org ATTN: Brandon Palmer Mason County PUD#1 21 West Sanderson Way,Shelton 98584 ATTN: Darrin Hall BrandonP@portofshelton.com N 21971 Hwy 101,Shelton,98584 darrinh@mason-pud1.org Dept of Archaeology&Historic Preservation Mason County PUD#3 P.O. Box 48343,Olympia,98504-8343 ATTN: Kristin French SEPA@dahp.wa.gov kristin.french@masonpud3.org WA Department of Ecology Tacoma Public Utilities-Real Property Services Environmental Review Section ATTN: Dave Letterman PO BOX 47703, Olympia,98504-7703 3628 S 35th St, Tacoma, 98409-3192 separegister@ecy.wa.gov dletterm@cityoftacoma.org WA Department of Health Mason Cty P.W.ATTN: ATTN:Joe Laxson joe.laxson@doh.wa.gov 0 Mason Cty E.H.ATTN: Other: I Mason Cty Bldg ATTN: Agent: POr Applicant: 0 School District: MC DCD last updated on 2/28/19