HomeMy WebLinkAboutBLD2001-00375 SFR, Deck and Garage - BLD Permit / Conditions - 4/25/2001 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Ir Shelton, WA 98584
flo
RESIDENTIAL BUILDING PERMIT BLD2001-00375
OWNER: FUERTEL PARIS RECEIVED: 4/25/2001
CONTRACTOR: LICENSE: EXP: ISSUED:
SITE ADDRESS: 8241 E STATE ROUTE 106 UNION EXPIRES:
PARCEL NUMBER: 322344300060
LEGAL DESCRIPTION: TR 6 OF GOVT LOT 2 & T.L.
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
RESIDENCE, DECK AND GARAGE 1.1 ILE EAST OF ALDERBROOK INN, 4.0 MILE WEST OF TWANOH STATE
PARK
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: 3 Type of Constr.: V-N
Type of Use: MF Insp.Area: No.of Bathrooms: 2 Occ. Group: R-3 Lot Size:4,800 Deck: 370
Type of Work: NEW Fire Dist.: 6 No. of Stories: 2 Occ. Load: Building:2,167 Garage-Detached 240
Valuation: $120,278 Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: S Ft. Shoreline: 15.0 Ft. Water Body: Hood Canal
Rear: N 15.0 Ft. Slope: Ft.
SEPA?: No
Model: Width: Ft. Side 1: E 5.0 Ft. Shoreline Desig.: Urban
Year: Serial No.: Side 2: W 5.0 Ft. I I Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Water Closets (Toilets) 3 Fireplace 1 EH Plan Review CEW 11/8/2001 $50.00 59413
Lavatories 3 Ventilation Fan 5 Planning Review Fee KS 11/15/200 $38.00 59413
Bath Tubs 1 Heat Pump 1 Plan Check Fee KLW 4/25/2001 $641.39 56090
Showers 1 Dryer Vent 1 Adjust Plan Check Fee RDC 6/7/2001 $88.27 59413
Water Heaters 1 Adjust Plan Check Fee DLC 6/13/2001 $80.99 59413
Clothes Washer 1 Building State Fee DLC 6/13/2001 $4.50 59413
Kitchen Sink 1 Mechanical Fee DLC 6/13/2001 $96.15 59413
Dishwasher 1 Mechanical Base Fee DLC 6/13/2001 $23.50 59413
Hoseblbs 5 Plumbing Fee DLC 6/13/2001 $89.00 59413
Plumbing Base Fee DLC 6/13/2001 $20.00 59413
Total $1,131.80
BLD2001-00375 Please referto the following pages for conditions of this permit. 1 of 4
CASE NOTES FOR
BLD20 0 1-00 3 75
CONDITIONS FOR
BLD2001-00375
1) This application is subject to Buffer and Landscaping requirements as established under Mason County Ordinance
1.03.036.X
2) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of
the Mason County Fire Marshal. X
3) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project.
X
4) Proposed structure or any portion thereof greater than 30" in height from grade line, must maintain a minimum of 5'setback from all property lines,
easements and 10'from all County and State Road right of ways. X ,
5) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt
-� fencing or straw matting). X
6) The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason
County Shoreline Master Program.X
7) All construction and demolition debris must be removed after project completion. Proper disposal of construction debris must be on land in such a
manner that debris cannot enter or cause water quality degredation of State waters. X
8) Approved per dimensions and setbacks on submitted site plan. X
9) Approved per dimensions and setbacks on submitted site plan. X
i
BLD2001-00375 Please referto the following pages for conditions of this permit. 2 of 4
,10) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee in the amount of$47.00 per hour(minimum 1 hour)will be charged and must be collected by the Building
Department prior to any further inspections being performed or approvals granted.
X [ ---
w�
11) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and
legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site
inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or
contractor fail to post the address on site prior to requesting inspections.
X i
12) The plan review check list and corrections, along with the Energy Compliance Worksheet(when applicable) are part of the approved plans and must
remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they
shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of
plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections.
X
13) The"approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" plot plan is not on site, then
approval will not be granted. In addition, a re-inspection fee in the amount of$47.00 per hour(minimum 1 hour)will be charged and shall be collected by
the Building Department prior to any further inspections being performed or approvals granted.
X
14) In buildings of unusually tight construction, fuel-burning appliances (excluding cooking appliances and domestic clothes dryers) shall obtain combustion
air from outside in accordance with the Uniform Mechanical Code.
X
15) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee of$47.00 per hour(minimum 1 hour)will be charged and
shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
X
16) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County
and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would
result in permit revocation.
X
17) Proposed structure or portions thereof with an projection over 30" in height from grade line, must maintain a 5'separation distance between adjacent
structures and that furthest projection. X
18) All changes to "approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance
or regulation, must be reviewed and approved by Mason County prior to construction.
X
BLD2001-00375 Please referto the following pages for conditions of this permit. 3 of 4
19) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall be made prior to requesting additional inspections.
X
20) All property lines shall be clearly identified at the time of foundation inspection. X
21) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X
22) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
X
23) Owner has been granted a variance of 10' into the Mason County 10'setback to the ROW and PL. Structure may be placed up to the ROW line and
Property Line BUT no construction shall occur in the Right Of Way or out of the property boundary lines. X
24) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X
25) Septic system must be staked when the footing are formed and prior to being poured.
X (�
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
y commenced. Evidence of continuation of work is a progrespection within the 180 day period. Final inspection must be approved before building can be occupied.
OWN E AGENT: DATE:
BLD2001-00375 Please referto the following pages for conditions of this permit. 4 of 4
r•
C MOBILE HOME
M*ihTE MECHANI
Fco*yj3-Sel ack date ,?f3 Ribbons
date J 2 y �, Gas �� date
by
Fo�.uxiattcn wads date Df by JV set UP
date 11 1LvA aZ by INSULATION dare
SGISIAB kuulation Floors Final
date by date by date
by
FRAMING Wads FIRE DEPT.
date 71/1S/Uq by S date -7 IZO IU`/ date by
PLUMBING Attic OTHER
Groundwork Mork date I � y/0 by
D.W.V. by WALLBO RD IUNG
date & )I b�% �... date U4
Water Lino FINAL INSPECTION
date date L by date by
�c,�z %aZ �v�t• ,�� .d �-o t7.ge.res `P s ��� �.t�r�, �c-H -J) kZk
Lof ( lov - `� 17 l U Y- T I nit- -r r '
T
C-MAcaL +uc7�'I �u�4I ►u �`I p5 u i os
/, Y /
lvb u61L
2 qvv wo L.04 M
o CONCRETE MECHANICAL MANUFACTURED HOME D
C) Date By
o Footings I Setbacks Gas Piping Ribbons �
o Interior Date By Interior-Date By Date Eby
4 Exterior Date By Exterior-Date B Set-up C.nINSULATION M
Point Load J Isolated Footings Date By �
BG f SLAB INSULATION
Date By Data By FIRE DEPARTMENT r
Foundation Walls Floors Date By
Date By Data By DECKS
FRAMING Walla Date By
Date By Data By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attie
Date By Type:
Uatc BY ,.._.._... �` Date By
D.W.V DRYWALLType:
Int Brace Wail Date By W
Dale By gate By FINAL INSPECTION p
Water Une Fire Seperation N
Date By Date By Date By O
CD 'j
Pass or Request Inspect. c
Type of Insp. Fail date Date Done By Comments w
C
0
0
ca
_0
CD
m
o
8
0
0
CD
m
0
PERMIT NO.: BLD
MASON COUNTY
BUILDING PERMIT APPLICATION y�y
426 W.Cedar/P.O.Box 186,Shelton,WA 98584
Shelton 360 427-9670 Belfair 360 275-4467 Elma 360 482-5269 Seattle 206 464-6968
APPLICANT INFORMATION CONTRACTOR INFORMATION Q
Owner /" . 4. / Contractor Name 's
Mailing Address R73v a f vE (f Mailing Address
City/ Mate_,,f Zip Code City State Zip Code
Phone ther Ph.( j Ph.( Other Ph.(
Lien/Title Holder47X), ..c , i /s Contractor Reg. #
Address.�,,-L e Expiration
SEPTIC/WATER SYSTEM INFORMATION-Connect to New Septic Existing Septic Connect to Sewer
System Name of Sewer System Well Water System i"' Name of
Water System
PARCEL INFORMATION-12 digit Tax Parcel No. / /QCk:) Fire District
Legal Description J
Site Address(Please in ude street name, street number and city) o /
Directions to site — e ,4-.
r JVi =7—ep I L— UA 'A /�!
Will timber be cut and sold in parcel preparation? (Yes/No) �VQ
Is your property within 200' of the following: Body of Water (Name) �� it�i¢-�_ Saltwater
Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or
Bluffs
TYPE OF JOB New Add Alt Repair Other Use of Building
Describe Work60,X e0K A-C/ �.
No. of Bedrooms,_No. of Bathrooms SQUARE FOO AGE-1 st Floor 2nd Floor
3rd Floor Loft 0;4 Basement 4 Deck Other sq. ftr�4g�
Garage Attached Detached Carport Attached Detached
MOBILE HOME INFORMATION-Make Model Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price $ Replacement Unit ?(Yes/No)
Installer Name Certification No.
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-1 certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a
Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance
requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work
conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without
approval. first obtaining approval.
Date v.�'�.?--01 X fDate
FOR F r
ICIAL SE BEYOND THIS P,Q�q
Accepted by Date Submittal Amount Due Receipt No.
DEPARTMENTAL:REVIEW APPROVED DENIED;' CONDITION CODES
Building Department ✓ '� V " . 6Pi
eCans IOcc Grou 'o✓
Planning Department _ /
Environmental Health Department
Public Works Department
Fire Marshal
1
Valuation $4 H2O/ a 77•,?6
v
_
15
:FEES
............
Building Permit Fee Site Inspection
Plan Review Fee 7 �¢ UFC Plan Review Fee
Plumbing & Base Fee g,; O Public Works Review Fee
Mechanical & Base Fee Other
Wood/Gas/Pellet Stove Fee Other
Violation Fee Pre-Paid at Submittal )
::: ...:.............. TOTAL FEES
w
PERMIT NO.:
MASON COUNTY
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W.Cedar;P.O.Box 186,Shelton,WA 98584
Shelton 360 427-9670 Belfair(360)275.4467 Elma(360)482-5269 Seattle 206 464-6968
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner /` ./Il. N: 4--. Contractor Name
Mailing�4ddre 730 Mailing Address
City tat Zip Code City State Zip Code
Phone 1 er Ph.( Ph.( Other Ph.(
Lien/Title H&der Contractor Reg. #
Address Expiration / /
EwIC INFORMATION-Connect to New Septic Existing Septic Connect to Sewer System Name of
System
PARCEL INFORMATION-12 digit Tax Parcel No. -• / / 0060 Fire District
Legal Description `''
Site Address(Please in lode street name, street number and city)
Directions to site • �M_r, 4Vi4. dVe
o . 60GS i A __5
Is your property within 200' of the following: Body of Water(Name) `��D C.���C Saltwater
Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or
Bluffs
TYPE OF JOB New Add Alt Repair Other Use of Building C
Location of Fixtures/Units 1st Floor 2nd Floor Basement Garage Closet
PLUMBING FIXTURES(Show Number of each) MECHANICAL UNITS Fuel Type. El
ctric c:
Type of Fixture No. of Fixtures Fees LPG Natural Gas Heatpump
Toilets Type of Unit No. of Units Fees
Bath Basins � Furnace
Bath Tubs �T Heatpumps
Showers Vent Fans
Water Heater Propane Tank
Laundry Wsher-G Gas Outlets
Sinks / Wood/Gas/Pellet Stove a�
Dishwas er T Direct Vent?
Other 0f6 r� Otheryi- -/F
Other Other
Base Fee Base Fee
TOTAL PLUMBING TOTAL MECHANICAL
A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF FIXTURE/UNIT.
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a
Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance
requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work
conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without
approval. first obtaining approval.
X Date` 7 Q X Date
FOR OFFICIAL USE BEYOND THIS POINT
Accepted by Date Submittal Amount Due Receipt No.
DEPART:MIENTAL:9 [ V1 Af±PRi] b DENIE#3 ">.. =1140 IQN Coots.
Building Department
Occ Group Type Constr.
Planning Department
Other
Other
FEES.
Permit Fee Site Inspection
Plan Review Fee UFC Plan Review Fee
Plumbing& Base Fee Other
Mechanical&Base Fee Other
Wood/Gas/Pellet Stove Fee Pre-Paid at Submittal ( )
Violation Fee TOTAL FEES
FORM MUST BE COMPLETED IN INK 1
PLEASE PRESS HARD MASON COUNTY PROJECT SITE INFORMATION
Case No.
Name L �"/tiP%5 PARCEL NUMBER u �i- cy(.n Date,,�-17—y
SHOW THE FOLLOWING ON SITE PLAN Show Direction by indicationg N, S, E, W in relation to the
site plan
Lot Dimensions Fences ,V
Existing Structures Driveways
Structure Setbacks Shorelines
Water Lines Topography
Well Location (including adjacent) Drainage Plan
Names of Streets Easements
Names of Fronting Streets Septic System
DRAW SITE PLAN BELOW Include adjacent Rroperties if on shoreline or within 100 feet of adjacent property line.
adjacent property line- , ()Q-1> r OqXJ4& Fadjacent property line
BULK eenb
OI I
I
I
I I i &u65-:�
su„ 'A/c
I �
I I
1 1
I I
I I
I
� � I
adjacent property line-> adjacent property line
SAMPLE SITE PLAN LVRTE� LirJde AE
adja'nt property lined aio' _ E-adjacent property line
I p 3o- rR�SCRvE gQ�I
CREEIG I I Hone t I
I A I I .Gaatwr
I F � i�owa
PM0 POSCn s:p*:c. ;I
1 —
I I4— 6°'VACAKiT
I T R I
I 30 I /
I(C I PP.oPosCO\ �F 7 A6R zLuLTW(l 5o'AL �
I I
1 I ,
I I
I I
I \ I
I I � r--eLL
1 I
I I
x /DD. --� I
A
adjacent property line4 i �,�. c \i (-adjacent propert line
TOPOGRAPHY PROFILE(Show a side view of property. Show slopes, cuts and fills. If possible include height and the
degree of slopes. See sample topography profile.)
SAMPLE TOPOGRAPHY PROFILE
d15+aMCC. to
r L
B @[df�i4D ( —.� drat ►,c� r c
HWy Iola +c¢
MV 4 0 aAqdL
Gam' bit
w4p
Signature Date
Request.To Revise An Approved Plan
Permit Number: BLD200 i - oo -77S Name V gt,�- L /� 7�ARiS'
Parcel Number O� phone Number daytime (�s3 )Z77—�j Z
Project Address _925// 7- R'l- 16,6 N� Mailing Address _g�s!o L sr r /�,G
'
��, wA 9 Sss Tt*ryA cI�' 2
Please provide a complete, detailed description of the proposed revisions to the approved plans: .c
wfll�pli'.lfiGR�l
Are two sets of the revised plans or addendum indicating the changes included? ❑ Yes ❑ No
Are the approved site plans included? :EL Yes ❑ No
Are the revisions clearly and accurately identified on the plans or addendum? Yes ❑ No
Does the plan contain an engineer's or architect's lateral or vertical analysis? 13� Yes ❑ No
If Yes,Has the engineer or architect approved this revision? `®. Yes ❑ No
Is a stamped and signed approval included with this request? p Yes ❑ No
(Note:No structural changes to a"designed"plan will be approved without the written consent of the engineer and/or architect of record
Does the proposed revision modify the footprint or location of the structure? tT Yes
If Yes, Is a revised site plan,with all new setback dimensions included with this request?
;.Yes ❑ No
Ad 'tional I ff ahon:
1 �
Applicant's signatt?�e
Date: ;�—
Office Use only Received by.
Date Sent Assigned To Approved
B. Original Auati
RD44k
�aluat $
P. � t. $
Sq.Ft. $ $
E.H. /� o New Valuation S
p.w V dditional Fees:Planning $
Additional p
Additional Plan Review $
New Setbacks: Front / Rear / Additional Building Permit $
Sidel. / Side2 1J Additional Plumbing $
Additional Conditions/Comments: Additional Mechanical $
Additional E.Hi Dept. $
Other �` $
Total Amount Due: ' $
Amount To Be Paid Up-Front$
Tao iitial
Revised SRG 21=2007
Dec k
Gam .
�c,,AR sRequest To Revise An Approved Plan
Permit Number: BLD200/ - 0037� Name lr-. �9l�1S
Parcel Numbers a'3>4 H3 /oor�too Phone Number) �=
Project Address (o Mailing Address ?
Please provide a complete, detailed description of the proposed revisions to the approved plans:
J
Are two sets of the revised plans or addendum indicating the changes included? 'Yes ❑ No
Are the approved site plans included? -4l1 es ❑ No
Are the revisions clearly and accurately identified on the plans or addendum? [ 'Yes No
Does the plan contain an engineer's or architect's lateral or vertical analysis? _✓Yes No
If Yes, Has the engineer or architect approved this revision? _�t1Yes J No
Is a stamped and signed approval included with this request? "Yes No
Note No structural changes to an engineered plan will be approved«2thout the written consent of the engineer or architect of record
��l
Does the proposed revision modify the footprint or location of the structure? Yes L'iVo
If Yes, Is a revised site plan, drawn to scale, included with this request? ❑ Yes ❑ No
L4jAc 3tioiWI Information:
LQ _
V
App;cant's signat ��� � Date:
)ffice Use Only
Forward to departments indicated below: Approval/Date Original Valuation:
X3uilding 5 Additional Valuation:- Sq Ft x
❑ Planning Sq Ft x
❑ Environmental Health Total New Valuation: ti
Additional Fees:
❑ Public Works Additional Plan Review
Additional Conditions/Comments: Additional Building Permit
Additional Pltunbing
Additional Mechanical
Other
Total Amount Due: $
02i28;2006 14:48 F,% 960 427 7798 MASO ' CO PERMIT M 2002
Request To Revise An Approved Plane
Permit Number: $LD200 l Name
Parcel Number - ;CIC' Phone Number
Project Address Sl 2'sZ1 E 77� �n Mailing Addtem-,2z-e 9-41'=���
Please provid$a complete,detailed description of the proposed revisions to�tttq approved p1
ILI
Are two sets of the revised plans or addendum indicating the changes included? pF yes ❑ No
Are the approved site plans included? In Yes ❑ No
Are the revisions clearly and accututely identif9ed on the plans or addendum? ,s Yes ❑ No
Do plan contain an engineer's or architect's lateral or vertical analysis? )a Yes ❑ No
'�j f Yes.Has the engineer or arcbitoct roved this revision?
� OF Yes p No
�*a ad.and signed approval included with this request? f�l Yes ❑ No
G�
46, p �J
�� Proposed revision modify the footprint or location of the,sttwtm? A Yes ❑ No
�OIf Yes,Is a revised site plan,with all now setback dimensions included with this request?
�P. p Yes ❑ No
Additional Information:
:Applicant's s'
Offics Use 0*
Date Surd A"Omd To Mpwved sy Dot*
$. t rital Valuation: S
ddkwnai vd=tion: $
Sq,Ft sq.Ft: x 5 S
EIL Total New Yalaation S
11 F.W.1 AdditimW Fees: 58�
Additional I,- I g Dept S
Additianal Plan Review ,
Front ! Rear / Additional auildh g iP $
Sidal— J BMW Additional Additional Plua�log $ —
Additional Conditions/Comments: Additional Mochmw4l S
Additional P—H.Dept- $
` Other
Total Amount Due: $
AuiwmtTo Be Paid WFront$
e u . to �•` ` L te,/ I $sacwe
T,' w '
tocII Its, a,Leff G .r - L
Wrswe+� wde Gerry T.�qr I MAY '
po.r,. C7Lefe« C0*0 It., —
. :. —
I------ 1 36 I ii: I A..
Ten..re Z `60 I GI
-4 1 4 / 00
Z Aries 0
T% Paine � CIt1
C B �L0A /06 to tr r•
�F4 r E N S TwANorl
�TCM • . — •\ --STATE PARK
p MRK r----- 5,t rs point 9
I22
I i aw
Ir Allyn is
Union I fa
I c• J
NMA S BAY I • +"'� �� I y
1 / �— — Q 1 �- I ."son
J ,r
LO r I Bew.on
I ff IJ 1e
106 i I — f I I / nar404 3 j
{1 fernwood 1 •e
l `r4.1
1 ,
SAu mO[AN Cr. i G.pnr.
► e0 as,
lwti
..
' ,• 1! 1 le Pe I ,•
4*6 44 ' Mr LIAf
J Lek I fwfro/O LOfI i 'I X
L_= ,wer,r•. 181 / tl u.....tt •°
L SAGE
t r-------� —
I a` PAS t.+eojARRELL S
is, COVE— Z
39 .l et .•.� =3 �•,.,...•- w... e^ I s f! I 3 i /• 1` wwr•M.
JOA ,Crfnoerr, I - - ;_� I i 30 _•y d`' t(drlsleM /<
.. ter' Ce1f Y , r �.,s� � t<�"frl T •A
-' • Lake
e.
P
.• r — I C'oirbs'rf +! ( SPe rf e g `,
3s 31 3t Wt I r si "w w 3f '
,r I •• z
ffI r PARALLE I ? 1 s4 w,.<wrM.a
..t �3/eA — — NORTN -� I p Q
Wweon— Lefe� t' `
o r e v�•>a G E
Leaf Q 34 `�`+e i G Bay Shore 8 P'1 I.j� ^f+ ` Grant Vag �.... N 1 •V ,
1 27 1 1 h.•w •no - (I ' t\0 { [ Urpr In YN. ',w MCMKS
O.L
e
PA,/1i C eke N.nvr. r.,.y A. we t^
t� s«w»cww .6 d t. g ,ar^ ': T.weerce.f.— r 24 n ( .
1
r�" ! 9 jr ^L�s 3 r I / I2 — I ` s' sallow
oaklond f �� d 7 ( 1 :
j16 SHELTON �p eo.e oTosr er. 33� u I v �'• If
.t
p" part
►tooau°
v
r ' I F I a to � VOWe• : •
Z3 A A. JTSL£Y — 7 r A
�et: ' I INLET wp.a o y F
.4 12 ��.._ 4 J► } 0 I A,c.ar Ila
sa s I.
• '�:+ SUM w. I is .I: es V.`r Arcodio h�M''1 = q- ~ 30
M t Asa.ad ' forefr '1 /I / '.'.�sf, D
~l vclw Ksswuwe 3MNs-w I Lefe- �, r=/Wilmer) :Jpillrits
. . m S
t a, L.MU.Mr M� tpp I ` IslO rle d-
..
3 f/.rr C'r ,11 , TA d .
OI� w 3
se ta. . 13 soI . • f 3s 3' S\�� ..CL UAXINISLAN 36 a �'
t � 2►�f ti �' i. P. f �
Ae ~ ? r 1 Unsel P. �•00oo,
`
►Moe ( I lr"af ' I
7
__ _ 391 Point
P w, fw..o p
harbor' GrIsco
Lek C.
I •�-
130/
1 f
11/10/2005
Conditions Associated With 9:40:56AM
Case#: BLD2001-00375
Permit Condition Status Updated
item# Code Title Status Changed By Tag Date By
1) 46 Buffer+Landscaping Requirements NOT MET 5/4/2001 KLF
This application is subject to Buffer and Landscaping requirements as established under Mason County
Ordinance 1.03.036.X
2) 4999 Flammable+Combustible Liquids NOT MET 5/4/2001 KLF
The use,handling and storage of hazardous materials or flammable and combustible liquids in excess of 10
gallons is not allowed without the approval of the Mason County Fire Marshal.
X
3) 5019 MCPW Development Requirements NOT MET 5/4/2001 KLF
Provisions for surface/subsurface drainage control must be implemented with new construction or development
on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County
Stormwater Ordinance,either private ditches and drains will meet requirements of the stormwater ordinance or
prior approval will be granted to use an existing utility and drainage easement dedicated for that specific
purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS
PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road,
Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction
which is proposed to be located within 25'of a Mason County road right of way,it is suggested to contact that
office to review future planned work which may affect your project.
X
4) 5025 Sideyard Setback NOT MET 5/4/2001 KLF
Proposed structure or any portion thereof greater than 30"in height from grade line,must maintain a minimum
of 5'setback from all property lines,easements and 10'from all County and State Road right of ways.
X
5) 60 Erosion Protection NOT MET 5/8/2001 RAM
All upland areas disturbed or newly created by construction activities shall be seeded,vegetated or given an
equivalent type of erosion protection(silt fencing or straw matting).X
6) 70 Shoreline Management Act NOT MET 5/8/2001 RAM
The proposed project must be consistent with all applicable policies and other provisions of the Shoreline
Management Act,its rules,and the Mason County Shoreline Master Program.X
7) 100 Construction Debris Removal NOT MET 5/8/2001 RAM
All construction and demolition debris must be removed after project completion. Proper disposal of
construction debris must be on land in such a manner that debris cannot enter or cause water quality
degredation of State waters. X
8) 200 Site Plan NOT MET 5/8/2001 RAM
Approved per dimensions and setbacks on submitted site plan.X
9) 200 Site Plan NOT MET 6/7/2001 RDC
Approved per dimensions and setbacks on submitted site plan.X
10) 1001 PLANS REQUIRED ON SITE NOT MET 6n12001 RDC
All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans
are not available on site,then approval will not be granted. In addition,a re-inspection fee in the amount of
$47.00 per hour(minimum 1 hour)will be charged and must be collected by the Building Department prior to
any further inspections being performed or approvals granted.
X
Page 1 of 3 CaseCoriditions..rpt
I I
11/10/2005
Conditions Associated With 9:40:56AM
11 Case #: BLD2001-00375
flo
Permit Condition Status Updated
item# Code Title Status Changed By Tag Date By
1 1) 1002 POST ADDRESS NOT MET 6/7/2001 RDC
In accordance with the Uniform Building Code,all sites shall have approved numbers or addresses located in
such a position as to be plainly visible and legible from the street or road fronting the property.Mason County
Building Department requires that this be completed prior to calling for any site inspections. A re-inspection
fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner
and/or contractor fail to post the address on site prior to requesting inspections.
X
12) 1003 PLAN REVIEW CORRECTIONS NOT MET 6/7/2001 RDC
The plan review check list and corrections,along with the Energy Compliance Worksheet(when applicable)
are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked"APPROVED",they shall not be changed or
altered without authorization from the Building Official. The permit holder is responsible to retain the
complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of
approved documents will result in failure of required building inspections.
X
13) 1012 PLOT PLAN REQUIRED ON SITE NOT MET 6/7/2001 RDC
The"approved"plot plan is required to be on-site for inspection purposes. If an inspection is requested and the
"approved"plot plan is not on site,then approval will not be granted. In addition,a re-inspection fee in the
amount of$47.00 per hour(minimum 1 hour)will be charged and shall be collected by the Building
Department prior to any further inspections being performed or approvals granted.
X
14) 3006 COMBUSTION AIR NOT MET 6/7/2001 RDC
In buildings of unusually right construction,fuel-burning appliances(excluding cooking appliances and
domestic clothes dryers)shall obtain combustion air from outside in accordance with the Uniform Mechanical
Code.
X
15) 5002 ENGINEERING OR ARCHITECTURE NOT MET 6/7/2001 RDC
Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in
writing to the Mason County Building Department prior to construction. All engineering and/or architectural
documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed,
approval will not be granted. In addition,a re-inspection fee of$47.00 per hour(minimum 1 hour)will be
charged and shall be collected by the Building Department prior to any further inspections being performed or
approvals granted.
X
16) 5003 ALL CONSTRUCTION NOT MET 6/7/2001 RDC
All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved
and permitted classification. Any non-approved change of use or occupancy would result in permit revocation.
X
17) 5026 Structure Setback NOT MET 6/7/2001 RDC
Proposed structure or portions thereof with an projection over 30"in height from grade line,must maintain a 5'
separation distance between adjacent structures and that furthest projection.
X
18) 5030 CHANGES TO APPROVED PLANS NOT MET 6/7/2001 RDC
All changes to"approved"building plans that effect compliance with the Uniform Codes as amended and
adopted,or any other Mason County ordinance or regulation,must be reviewed and approved by Mason
County prior to construction.
X
Page 2 of 3 CaseConditions..rpt
11/10/2005
Conditions Associated With 9:40:56AM
(( Case #: BLD2001-00375
�T
Permit Couditiou Status Updated
item# Code Title Status Changed By Tag Date By
19) 5045 FIELD CORRECT NOT MET 6/7/2001 RDC
The construction of the permitted project is subject to inspections by the Mason County Building Department.
All construction must be in conformance with the Uniform Codes as amended and adopted by Mason County.
Any corrections,changes or alterations required by a Mason County Building Inspector shall be made prior to
requesting additional inspections.
X
20) 5510 Property Lines NOT MET 6/7/2001 RDC
All property lines shall be clearly identified at the time of foundation inspection.
X
21) 5600 FINAL INSPECTION REQUIRED NOT MET 6/7/2001 RDC
All building permits shall have a final inspection performed and approved by the Mason County Building
Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be
documented in the legal property records on file with Mason County as being non-compliant with Mason
County ordinances and building regulations.
X
22) 5610 PERMIT EXPIRATION NOT MET 6/7/2001 RDC
All permits expire 180 days after permit issuance,or 180 days after the last inspection activity is performed.
The Building Official may extend the time for action for a period not exceeding 180 days,upon the receipt of a
written extension request indicating that circumstances beyond the control of the permit holder have prevented
action from being taken. No more than one extension may be granted.
X
23) 1000 *VARIANCE ACKNOWLEDGEMENT NOT MET 7/23/2001 TLG
Owner has been granted a variance of 10'into the Mason County 10'setback to the ROW and PL. Structure
may be placed up to the ROW line and Property Line BUT no construction shall occur in the Right Of Way or
out of the property boundary lines. X
24) 3020 Owner Responsible NOT MET 11/8/2001 CEW
Owner/builder assumes all responsibility if drainfield/reserve area is encumbered.
X
25) 1000 SEPTIC SYSTEM STAKEOUT NOT MET 11/8/2001 CEW
Septic system must be staked when the footing are formed and prior to being poured.
X
Page 3 of 3 CaseConditions..rpt
I
Mason County Dept. of Community Development
Mason County Bldg. 3
426 W. Cedar
rioP.O. Box 186 (360)427-9670 Local (360) 482-5269 Elma
Shelton, WA 98584 (360) 275-4467 Belfair
Notice to Obtain Final Inspection
December 14, 2007
FUERTEL PARIS
2730 92ND AVENUE COURT WEST
TACOMA WA 98466
Case No.: BLD2001-00375
Parcel No.: 322344300060
Proiect Description: RESIDENCE, DECK AND GARAGE
The Mason County Department of Community Development is currently reviewing all
permits that are expired and have not been approved for occupancy and use.
Pursuant to Mason County Code, Title 14 Building and Construction, a permit and
final inspection for this type of activity is required under the 2006 International
Building Code or the code your permit was issued and your property is currently in
violation status of occupancy and use.
Please contact our office to make the necessary arrangements 21 days from
the date of this letter. Failure to contact our office to make the necessary scheduled
inspections will result in enforcement actions.
To bring your site into compliance, you must schedule an inspection. One (1) $64.00
site investigation fee will need to be paid prior to inspection along with any
outstanding fees currently due on your building permit. For every inspection required
after that, you will be charged $64.00 again, per inspection until final inspection and
conditions are met.
To schedule an inspection, please call (360) 427-9670 ext. 262.
If you should have any questions regarding this notification, please contact me at
(360) 427-9670 ext 359.
Sincerely,
Terry Rya
lm
Mason County De maent/o4fCommunity Development
Cc: Property File
December 14, 2007 BLD2001-00375
. REOSED
PRINCIPALS
Daniel D.Putnam,S.E.
James R. tt,S.E.
Donald R..Scow Scod,S.E.
/ Lanny J.Flynn,S.E.
(---P rTj Jack J.Pinkerd,S E
Richard M.Gehmcke,S.EP .
_—� - Cr B9T-Pten C'Phe r,S.E.
RECEIVED 5#Wt�r�
DATE SENIOR ASSOCIATE
Putnam Collins Scott Associates Douglas A.Goodwin,S E.
Tacoma • Seattle ASSOCIATES
Gareth J.Floyd,CPA
Aaron A.Goodwin,CAD
Bret Maddox,S.E.
5TRUGTURALGALGULATION5 STRUCTURAL ENGINEERS
Gary E.Beckner,S.E.
Stave FerVour,S.E.
Jim L.Harris,S.E.
Chun C.Lau,S.E.
Ronald E.Saehafer,S.E.
FOR
'/(20 - 033-S
PArR15 BEACH HOU5E
FIREPLACE MODIFICATION
PREPARED BY
PUTNA M GOLLIN5 5GOTT A550C,.IA<TE5
A
��d� � �S
2779,88is
�
P
EXPIRES: 3/8/03
APp� c INSP RUArRY 11, 2003
g�ILpIN ppp _
Mpg°N 01-050
CN GAS S�p�ECT�0
�pp,YE
950 Pacific Avenue, Suite 1100 Tacoma,WA 98402-4495•(253)383-2797•(253)383-1557 fax
811 First Avenue, Suite 510 Seattle,WA 98104-1457•(206)292-5076•(206)467-7788 fax
www.pcsainc.com•Incorporated 1969
• -mot.. ,p'� � .
,
Ax2C .r
I
L J
� •'z3
1 S
_ t o y�Y) d,t,� LO
. Z�c
L
07
rF) a
`r' ( • � I o J -,�► nib xv . � ,an �.�ad3 1 �
J� '-V31gIoS 'N'w'
• �•� .Zt �h� •iQ41 y Sao �� ,,o�d� � 3.��r� .,N , � � •9� a pS
�91x A of Z
- � fir, �Xod� ZIo �43�w3• , h-} D �b 1
Ip
J 5•�� I-I"VVh
d
tni
•A
�r
r �
A.�N P.A4V.11tY{O'1f•p ORLN lOM•:l`wOlY1��oww. w.r•/
cq
•
• I
lie
•
1:� 2� x 4�.,
ail V r
��-+��....._.aw..u.�srs..eemse.aa.ee��aa.�..aa�l.(�1 � .,.i...�wwal� �����s�■��e��HArto�
RYl: f r � �
a .
— Pie; Job No.:
S ❑Calculation _ ❑Phone Record_Sheet of Name:
A ❑Memo ❑Meeting Minutes_❑ Date:
.S#uArdsgf//Cty -
Putnam Collins Scott Associates Originating Office: ❑Tacoma ❑Seattle
Tacoma • Seattle
( ZIIM O.C,
� S((ST7KtCq
At y P IZK cam. G fZ1- k_I}'Vjr-
t
-S k / ,
l�� N.
d SCAue-
950 Pacific Avenue,Suite 1100 Tacoma,WA 98402-4495•(253)383-2797•(253)383-1557 fax
811 First Avenue. Suite 510 Seattle WA 98104-1457•(206)292-5076•(206)467-7788 fax
-- Project: Job No.:
f f ❑Calculation _ ❑Phone Record_Sheet of Name:
;6 ❑Memo ❑Meeting Minutes_❑ Date:
Putnam Collins Scott Associates Originating Office: ❑Tacoma ❑Seattle
Tacoma Seattle
✓D�1 p C�Iz�u�
TY
Vv1 2�a f�ff� LIMA,
Ilu
i1 b x6 x'�bk 1'-0" s
x2'-16
At-L' T>
2'
Gam'
T3M
_ - S
8„
M NJ
3A c�
f
j3M.
C-('I CA
tiln sc�,�.
950 Pacific Avenue,Suite 1100 Tacoma,WA 98402-4495•(253)383-2797•(253)383-1557 fax
811 First Avenue,Suite 510 Seattle WA 98104-1457•(206)292-5076•(206)467-7788 fax
• ._._J IIIII
1
11A04/02 MON 15:49 FAX 253 383 1557 PCSA Ia002
1
PRINCIPALS
y Dorn H.
PutnamColka,S.E.
James H.ColXns,S.E.
Donald R.Scott,S.E.
/ Lanny J.Flynn,S.E.
SENIOR ASSOCIATES
S�LG/L/iI JNV/�.IO Richard M.Oehmcks,S.E.
Jack J.Pinkard,S.E.
ASSOCIATES
Putnam Collins Scott Associates GarethAS J.Floyd,CPA
Tacoma • Seattle Aaron A.Goodwin,CAD
Douglas A.Goodwin,B.E.
Brat Maddox,S.E.
Brien C.Phalr,S.E.
Craig D.Stauffer,S.E.
STRUCTURALCALCULATIONS STRUCTURAL ENGINEERS
Gary E.Beokner,S.E.
Jim L.Harris,S.E.
Ronald E.Seehater,S.E.
FOR
PAR15 BEACH HOUSE
BEAM MODIFICATION
PREPARED BY
PUTNAM COLLIN5 5COTT A550CIATE5
ca A
f
1
27
1
ANAL
EXPIRES: 318/03
NOVEMBER 4, 2002
01 -0 50
950 Pacific Ave.,Suite 1100 Tacoma,WA 98402 a(253)383-2797 a(253)383T+d1f7�c P I_A N S M U ST B E
209 V2 First Avenue South, Suite 300 Seattle WA98104 a(206)292-5076 a(206)467d?q8 fW E JOB SITE
www.pcsainc.com 9 Incorporated 1969 FOR INSPECTION,
1L,04/02 MON 15:50 FAX 253 383 1557 PCSA 003
St w►.pso i (
y 4�GL3
F
a F3,o 3. r, _ o� Stu q �� .
Sir
14C--1
P'D4 : � N
P.
po . " Fo3
��
4-
— { _'- J Lz' _ J -
rz.s
lzl/ pca tsd a 16" o, c.. evoc'
",-rerDC�J�xB
1 `' ti L G 'FO R -
11X04/02 MON 15:51 FAX 253 383 1557 PCSA Ij004
z of c� r� ►
at-a5 v
TJI BLK'G
TJ I
(2)#4 GONT. ® TOP
#4 DOWEL ® 15" O.G.
bill
#4 GONT. ® 12" z
O.G. FOR STEM
WALL GREATER 1z
THAN 24" TALL
(2)#5 GONT. Ill
SECTION
NO SCALE
THESE PLANS MUST BE
ON THE JOB SITE
FOR INSPECTION.
11X04/02 MON 15:51 FAX 253 383 1557 PCSA g� 005
41 rroieci: Job No.:0I 055 6
❑Memo Elp Meeting Minutes_❑ Date: z z!
AS
57�LC�flL9�.�iE/1i7"S' ❑Calculation El Phone Record Sheet__�_of Name:
Putnam Collins Scott Associates Originating Office: ❑Tacoma ❑Seattle
Tacoma • Seattle
-- --- --- --- --- --- -- ,-- --- --- --- -- --- --- --- --- -- --- -- ---'-- --- -- --- — -- --_ —_—
i
-------------------
s
--- --- -- -----it- -- - -- --- - --- -- --- --- -- --- -- _ Sit, -
-- --- --I--- -- -- --- --- ---i-- --- --- --- -- --- --- -- ----- --- --- ---� -- -- --- --- -- —
i
— — —
—
___ S S —Bt _
950 Pacific Ave., Suite 1100 Tacoma,WA 98402•(253)383-2797•(250Pf3jIfigfgi OB SITE
209 '/z First Avenue South,Suite 300 Seattle WA 98104•(206)292-5076*oft 4ff4yPL1t*T 10N•
www.pcsainc.com•Incorporated 1969 l•
1U04/02 MON 15:53 FAX 253 383 1557 PCSA _A006
rroject: I—T NI—AJ Job No.: VA r ;' U
�� ❑Memo 0 2—Meeting Minutes_❑ Date: 2 E h�..
A,
.Szrt�.Sa�itzs, ❑Calculation _ ❑Phone Record Sheet Lt of—>Name: ZS
Pur,utlnCollinsScottAssociates Originating Office: ❑Tacoma ❑Seattle
Tacoma -Seattle
1 s
CV
0 1
i
_
_
I
1 I
--- -- .--_ --
7
t-----_ -__ T E-M- S T7-E
950 Pacific Ave., Suite 1100 Tacoma,WA 98402•(253)383-2797• )5ps�4t55D f7 !!pB SITE
TE
2091/2 First Avenue South,Suite 300 Seattle WA 98104•(206)292-50�0 I'IV t�tC:I IUN,
www.pcsainc.com•Incorporated 1969
11/04/02 MON 15:54 FAX 253 383 1557 PCSA 16007
• S, 6� C.Q
PCSA Title: Job#
950 Pacifc Ave Suite 1100 Dsgnr: Date: 9:30AM, 21 FEB 02
Tacoma,WA 98402 Description
(253)383-2797
Zach Diode Scope:
Rev: 550100
User:KW.060643,ver 5.5.0,25-Sep 2001 General Timber Beam
(01983.2001 ENERCALC Engineering Software
Description Beam @ Foundation
General Information Calculations are designed to 1997 NDS and 1997 UBC Requirements
Section Name 5.125x18.0 Center Span 19.00 ft . . . ..Lu 19.00 ft
Beam Width 5.125in Left Cantilever ft . .Lu 0.00 ft
Beam Depth 18.000 in Right Cantilever ft . . . . .Lu 0.00 ft
Member Type GluLam Douglas Fir,24F-V4
Bm Wt.Added to Loads Fb Base Allow 2,400.0 psi
Load Dur. Factor 1.000 Fv Allow 190.0 psi
Beam End Fixity Pin-Pin Fc Allow 560.0 psi
Wood Density 35.000pcf E 1,800.0ksi
Full Length Uniform Loads
Center DL 580.00#/ft LL #/ft
Left Cantilever DL #/ft LL #/ft
Right Cantilever DL #/ft LL #/ft
Point Loads
Dead Load 2,940.0lbs Ibs Ibs Ibs Ibs Ibs Ibs
Live Load Ibs Ibs Ibs Ibs Ibs Ibs, Ibs
...distance 9.500 ft 0.000 ft 0,000 ft 0.000 ft 0.000 ft 0.000 ft 0.00oft
Summary Beam Design OK
Span=19.00ft,Beam Width=5.125in x Depth= 18.in,Ends are Pin-Pin
Max Stress Ratio 0.819 : 1
Maximum Moment 41.1 k-ft Maximum Shear* 1.5 9.5 k
Allowable 50.3 k-ft Allowable 17.5 k
Max. Positive Moment 41.15 k-ft at 9.500 ft Shear: @ Left 7.19 k
Max. Negative Moment 0.00 k-ft at 19.000 ft @ Right 7.19 k
Max @ Left Support 0.00 k-ft Camber: @ Left 0.000 in
Max @ Right Support 0.00 k-ft @ Center 0.834 in
Max. M allow 50.26 Reactions... @ Right 0.000 in
fib 1,784.25 psi fv 102.81 psi Left DL 7.19 k Max 7.19 k
Fb 2,179.30 psi Fv 190.00 psi Right DL 7.19 k Max 7.19k
Deflections
Center Span... Dead Load Total Load Left Cantilever... Dead Load Total Load
Deflection -0.556 in -0.556 in Deflection 0.000 in 0.000 in
...Location 9.500 ft 9.500 ft ...Length/Deft 0.0 0.0
...Length/Deft 410.1 410.14 Right Cantilever...
Camber(using 1.5*D.L. Defl)... Deflection 0.000 in 0.000 In
@ Center 0.834 In ...Length/Deft 0.0 0.0
@ Left 0.000 In
@ Right 0.000 in
THESE PLANS MUST BE
ON THE JOB SITE
FOR INSPECTION.
11(04/02 MON 15:55 FAX 253 383 1557 PCSA Z 008
- PCSA
Title: Job#
950 Pacifc Ave Suits 1100 Dsgnr: Date: 9:30AM, 21 FEB 02
Tacoma,WA 98402 Description
(253)383-2797
Zach Diode Scope
Rev: 550100
User:KW-060643,Ver 5.5.0,25 Sep-2001 General Timber Beam
(c)1983.2001 ENERCALC Engineering Software
Description Beam @ Foundation
Stress Calcs
Bending Analysis
Ck 22.210 Le 35.266 ft Sxx 276.750 11 Area 92.250 in2
Cv 0.970 Rb 17.033 Cl 0.936
Max Moment Sxx R Allowable fb
@ Center 41.15 k-ft 226.58 in3 2,179.30 psi
@ Left Support 0.00 k-ft 0.00 in3 2,327.82 psi
@ Right Support 0.00 k-ft 0.00 in3 2,327.82 psi
Shear Analysis @ Left Support @ Right Support
Design Shear 9.48 k 9.48 k
Area Required 49.919 in2 49.919 in2
Fv:Allowable 190.00 psi 190.00 psi
Bearing @ Supports
Max. Left Reaction 7.19 k Bearing Length Req'd 2.506 in
Max.Right Reaction 7.19 k Bearing Length Req'd 2.506 in
Query Values
M.V,&D @ Specified Locations Moment Shear Deflection
@ Center Span Location= 0.00 ft 0.00 k-ft 7.19 k 0.0000 in
@ Right Cant.Location= 0.00 ft 0.00 k-ft 0.00 k 0.0000 in
@ Left Cant.Location= 0.00 ft 0.00 k-ft 0.00 k 0.0000 in
Sketch & Diagram
70 60 ;31 ao 53 N0 ......45.20
584 1/T i 11 i I t f i ;Ti-N 1 i i�isl ITIZ I TTTtI jl.l.-11.. 580N,H _ _.:
r2 86 ---4-
I14:29 _ I-
b VWx.41.1kH Ri 1.
5 72 L
Shear Load(k) __ Location Along Member(H)DMax
41.15 rl 90 - O 80 5 70 76 l I �- 11 40 3�l�-- 5 20 `17.I6 '19.00
Rmax-7.2k Rmax=7.2k 07 03 `-
Vmax®left.7.2k Vmax a rt=7.2k 32 92 -
Ig I i
'�880�-
057-I
i
i g
iT.34
IIPNii i
y
23 I I, lil i
I
y I 11Y
Ben i Imoment k-H Location Atong Member H
4 9.00
I
to n f i 022 t l l II I
Ilu Ilr,l I Lull xx I �l II)411� III III"A � ' -�
I I, f . II + I: $Itl fu$rl illt � -
� 'I fI }T
II I "'Ik t I ' � I III I 11 I I tll
0 26 I ,�I 11 II Ilr Ilia I Ily --
0 313 -
, � , t,,y 111 A,I;
oaa f trl 9i ,1 11 file IS --__
fi�
Local'y Deflection(in) Location Along Member(H)
THESE PLANS MUST BE
ON THE JOB SITE
FOR INSPECTION..
a
r �
ik
ti
A
r u�
oS
CO
_ MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mason County Bldg. III, 426 West Cedar Street
PO Box 186, Shelton, WA 98584
1854 www.co.masonma.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269
November 14,2005
Fuertel N. Paris
8240 E State Route 106
Union, WA 98592
Dear Mr. Paris,
It was recently brought to my attention by Mason County Plans Examiner,Debbera Coker, that
you had submitted a revised plan for a previously permitted garage. Ms. Coker consulted with me after
reviewing file information for approved variances.
In reviewing your variance requests from October 13, 2000 which I processed, records indicate
that initially you were in fact seeking two variances. The first one was from the Right of Way/Property
Line and the second request was from the Sideyard/Property Line.
The variance history and submittal documents show that once the Sideyard Property Line request
was recognized as a shoreline lot, there were two possible options to proceed. The options were noted as
either a Shoreline Variance or a Boundary Line Adjustment. One of which would be necessary to proceed
with the sideyard property line setback proposal. After the submittal of a revised site plan dated 12/14/00,
showing the garage to meet the minimum sideyard requirements,the Right of Way/Property Line variance
was approved and recorded on 7/27/01 under Mason County Auditor File No.: 1736086. I have also
included a blank copy of the Sideyard form that would have been required at that time to obtain a
variance. I am unable to locate approval for the sideyard Property Line variance or a copy of a recorded
variance from the sideyard Property Line.
The building permit BLD2001-00375, for which you are now seeking a revision to locate an
addition closer to the sideyard property line,was originally approved with a minimum 5' sideyard setback
based on the site plan submitted and conditioned as such. I have enclosed a copy of the Variance for
Right of Way and the permit conditions with applicable text highlighted.
In the event that you have completed the Shoreline Variance or the Boundary Line Adjustment
that would change the circumstances or you have a copy of the recorded Variance Request Structure
Setbacks From Property Line form,please submit a copy of that documentation and we will be happy to
continue processing your addition and revision. If you do not have any approvals,please note that we
will not be able to approve this proposal or allow construction absent an approved building permit.
Please feel free to contact me regarding any questions you may have at(360)427-9670 ext 356.
s
Since ly
i
i ff
Building Inspe for/Code Enforcement
Cc: Debbera Coker, Plans Examiner
Property File
Allan Borden, Planner
TJ Martin, Land Use Attorney