Loading...
HomeMy WebLinkAboutTest Report for Above Ground Piping - FIR Inspections - 1/28/2010 FEB-05-2010 FRI 09: 13 AM t P. 002/003 I WASHINGION STATE PATROL CONTRACTORS' MATERIALS TEST REPORT D�OGROIILIND PIPING U 0 ,F, PROCEDURE Upon completion of work, inspection and test shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. PROPERTY NAME DATE HARMONY HILL ANNEX 1/28/10 PROPERTY ADDRESS 7362 E SR-106 UNION, WA 98592 ACCEPTED BY APPROVING AUTHORITIES(NAME) MASON COUNTY FIRE MARSHAL'S OFFICE ADDRESS PLANS SHELTON, WA INSTALLATION CONFORMS TO ACCEPTED PLANS ®YES ❑NO EQUIPMENT USED IS APPROVED ®YES ❑NO IF NO,EXPLAIN DEVIATION HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION OF CONTOL VALVE AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? YES ® NO IF NO,EXPLAIN INSTRUCTIONS HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: 1. SYSTEM COMPONENTS INSTRUCTIONS S YES ❑NO 2. CARE AND MAINTENANCE INSTRUCTIONS [DYES ❑NO 3. NFPA25 ®YES ❑NO LOCATION SUPPLIES BUILDINGS ANNEX OF SYSTEM MAKE MODEL YEAR OF ORIFICE SIZE QUANTITY TEMPERATURE RATING MANUFACTURE RASCO RFC49 CONC. 2009 1/2 22 165 RASCO F3QR DRY HSW 2009 1 6 155 SPRINKLERS TYPE OF PIPE PIPE AND CPVC, SCH 10, SCH 40 FITTINGS TYPE OF FITTINGS _ BCI, MI, GROOVED MECHANICAL, COPPER, AND CPVC ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST CONNECTION TYPE MAKE MODEL MINUTES SECONDS ALARM VALVE OR FLOW POTTER WSFR-2 0 32 FLOW INDICATOR 3000-450-001 9/02 FEB-05-2010 FRI 09: 14 AM P. 003/009 DRY VALVE QUICK OPENING DEVICE MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. TIME TO TRIP TRIP POINT TIME WATER THRU TEST WATER AIR PRESSURE AIR REACHED TEST ALARM OPERATED DRY PIPE CONNECTION PRESSURE PRESSURE OUTLET PROPERLY OPERATING TEST MIN SEC PSI PSI PSI MIN SEC YES NO WITHOUT Q.O.D. WITH Q.O.D. IF NO,EXPLAIN OPERATION ❑ PNEUMATIC ❑ ELECTRIC ❑ HYDRAULIC PIPING SUPERVISED ❑ YES ❑ NO DETECTING MEDIA SUPERVISED ❑ YES ❑ NO DOES VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS? ❑ YES ❑ NO DELUGE 8. IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING? IF NO,EXPLAIN PREACTION ❑ YES ❑ NO VALVES DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT OPERATE MAXIMUM TIME TO OPERATE MAKE MODEL SUPERVISION LOSS ALARM? VALVE RELEASE? RELEASE YES NO YES NO YES NO HYDROSTATIC: Hydrostatic levels shall be made at not less that 200 psi(13.6 bars)for two hours of 50 psi(3.4 bars)above static pressure in excess of 150 psi(10.2 bars)for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent damage. All aboveground TEST piping leakage shall be stopped. DESCRIPTION PNEUMATIC: Establish 40 psi(2.7 bars)air pressure and measure drop which shall not exceed 1%psi(0.1 bars)in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1%psi 0.1 bars in 24 hours ALL PIPING HYDROSTATICALLY TESTED AT 200 FOR 2 HRS IF NO,STATE REASON DRY PIPING PNEUMATICALLY TESTED ❑YES ❑NO EQUIPMENT OPERATES PROPERLY ❑YES ❑NO DO YOU CERTIFY AS THE SPRINKLER SYSTEM CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS,SODIUM SILICATE OR DERIVATIVES OF SODIUM SILICATE,BRINE OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? ®YES ❑NO DRAIN READING OF GAGE LOCATED NEAR WATER SUPPLY TEST RESIDULE PRESSURE WITH VALVE IN TEST TESTS TEST CONNECTION: PSI I CONNECTION OPEN WIDE: PSI UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. VERIFIED BY COPY OF THE U FORM NO 85B ®YES ❑ NO FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING ®YES ❑ NO IF NO,EXPLAIN BLANK TESTING NUMBER USED LOCATIONS NUMBER REMOVED GASKETS 0 1 NA 0 WELDED PIPING ❑YES ®NO IF YES,COMPLETE BELOW DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3? ®YES ❑NO DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN WELDING COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3? ®YES ❑NO DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS ARE RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH,THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED,AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED? ®YES ❑NO CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL DISCS CUTOUTS DISCS ARE RETRIEVED? ®YES ❑NO FUNCTIONAL DOES AHJ REQUIRE A FUNCTIONAL FLOW TEST OF RESIDENTIAL SPRINKLERS? ❑YES ❑NO FLOW TEST WERE FUNCTIONAL FLOW TEST RESULTS SATISFACTORY? ❑YES ❑NO HYDRAULIC IF NO,EXPLAIN DATA NAMEPLATE NAME PLATE PROVIDED ®YES ❑NO REMARKS DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: 1/28/10 NAME OF SPRINKLER CONTRACTOR CONTRACTOR LICENSE# DATE Fox Fire Prevention, Inc. I FOXFIP1127M8 1/28/10 SIGNATURES TESTS WITNESSED BY For proving Authori TITLE DATE FIRE MARSHAL 1/28/10