Loading...
HomeMy WebLinkAboutMEP2003-00054 - MEP Permit / Conditions - 3/10/2004 A P�ON.STgT � MASON COUNTY o A o N DEPARTMENT OF COMMUNITY DEVELOPMENT > s N Planning Division o y Y P O Box 279, Shelton,WA 98584 (360)427-9670 1864 MASON ENVIRONMENTAL PERMIT March 10, 2004 HARMONY HILL UNION WA106 997592 TO BE KEPT IN THc PARCEL FILE Parcel No.: 322334400040 Issued: 3/10/2004 Case No.: MEP2003-00054 Project Description: MEP. Stormwater system improvements in landslide hazard area. New stormwater pipe to be installed from upper site, connecting to existing WSDOT storm water main within SR 106 right of way. The following critical areas are present on this property: Long-Term Commercial Forest FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066-1 Ch. 17.01.090; Inholding Lands X Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuantto the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Authorized Local Government Official Date j Mason Environmental Permit ' 3/10/2004 Case No.: MEP2003-00054 Conditions: 1.) The approval of this project is subject to the recommendations and specifications outlined in the attached geotechnical report or assessment_The g echincal report/assessment shall remain attached to the approved plans. X 2.) Water quality is not tope degr-1 ri ed to the detriment of the aquatic nvironment as a result of this project. X r��c T 3.) Developers and individuals shall be Wuired to control erosion during construction. Removal of vegetation should be minimized and any arpa§ disturb hould be restored to prevent erosion and other environmental impacts.X 4.) Best ManagemerracticesN. r erosion control shall be implemented du 'n all phases of the project.X ` -Z� ( "'fJL "/IL^ 5.) Project approval contingent upon ` ntenance cost sharing agreement between project proport and Ma County Utilities &Waste Management Department. X C'�, MC�; 6.) A post installation report E911 be submitted to the County Planning Department pursuant to the plan requirements for an inspection prior to backfilling of trench in order to verify that the stoy.Fn water fac'it'e have been installed according to the submitted plans.X Y� 3/10/2004 2 of 2 MEP2003-00054