MASON ENVIRONMENTAL PERMIT
March 10, 2004
HARMONY HILL
UNION WA106 997592 TO BE KEPT IN THc
PARCEL FILE
Parcel No.: 322334400040
Issued: 3/10/2004
Case No.: MEP2003-00054
Project Description:
MEP. Stormwater system improvements in landslide hazard area. New stormwater
pipe to be installed from upper site, connecting to existing WSDOT storm water main
within SR 106 right of way.
The following critical areas are present on this property:
Long-Term Commercial Forest FWHCA
Ch. 17.10.060; Ch. 17.01.110;
Mineral Resource Lands Frequently Flooded Areas
Ch. 17.01.066-1 Ch. 17.01.090;
Inholding Lands X Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuantto the Mason County Resource Ordinance (Chapter
17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other
federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may
be rescinded if the permitee fails to complete the project as proposed or fails to comply with the
standards of this ordinance.
Authorized Local Government Official Date
j Mason Environmental Permit
' 3/10/2004 Case No.: MEP2003-00054
Conditions:
1.) The approval of this project is subject to the recommendations and specifications outlined
in the attached geotechnical report or assessment_The g echincal report/assessment
shall remain attached to the approved plans. X
2.) Water quality is not tope degr-1 ri
ed to the detriment of the aquatic nvironment as a result
of this project. X r��c T
3.) Developers and individuals shall be Wuired to control erosion during construction.
Removal of vegetation should be minimized and any arpa§ disturb hould be restored
to prevent erosion and other environmental impacts.X
4.) Best ManagemerracticesN. r erosion control shall be implemented du 'n all phases of
the project.X ` -Z� ( "'fJL "/IL^
5.) Project approval contingent upon ` ntenance cost sharing agreement between project
proport and Ma County Utilities &Waste Management Department.
X C'�, MC�;
6.) A post installation report E911 be submitted to the County Planning Department pursuant
to the plan requirements for an inspection prior to backfilling of trench in order to verify
that the stoy.Fn water fac'it'e have been installed according to the submitted
plans.X Y�
3/10/2004 2 of 2 MEP2003-00054