HomeMy WebLinkAboutBLD92-1423 Bulkhead - BLD Permit / Conditions - 3/23/1993 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
F::3 LJ 1 1_.. (.3 1 ir4 4 a F> 1''. F�t M jE "1"' FOR INSPECTIONS CALL 427-9670
BETWEEN 5pm AND 8am 427-7262
BLD92-1423 PARCEL : 322343400220 PLAT : DIV: BLK : LOT :
JOB ADDRESS : E 7920 HWY 106 . . . . . . . . UNION
OWNER : EVELYN MURNEN 533-7828
CONTRACTOR : OWNER IS CONTRACTOR
L E G A L : TRS 21A, 22-23 IF LTI 3 i T.L. FS 11123
CLASS OF WORK NEW BEDR : 0 BATH : 0 TYPE AMOUNT BY DATE RECEIPT TYPE AMOUNT BY DATE RECEIPT
TYPE OF USE . . . . : OTH STORIES . . . . . . . : 0
0CCUP . GROUP . . . : ? BLDG . HEIGHT . . : 0 . Ott IPRMT j 47.51 KS 03J23J93 32367 1
TYPE OF CONST . . : ? FIREPLACES . . . . : 0 PICK ; 19.11 KS 13J23J93 32307
0CCUP . LOAD . . . . : 0 WOODSTOVES . . . . : 0 STFE Z 4.51 KS 13J23J93 3 230 7
DWELL . UNITS . . . . : 0 PARKING SPACES : 0
INSPECTION AREA : 3 SHORELINE ? . . . . : Y TOTAL: 71.00 VALULATION: 3417
SETBACKS-------------- TOILETS . . . . . . . . . . : 0 FUEL TYPES---------- BOILERS/COMP---- MOBILE HOME--
FRONT . . . ? 0 . Oft BATH BASINS . . . . . . : 0 : ? 0-3 HP . : 0
REAR . . . . ? 0 . Oft BATH TUBS . . . . . . . . : 0 3-15 HP . : 0 MODEL : ?
SIDE ( 1 ) . ? 0 . 0tt SHOWERS . . . . . . . . . . : 0 FURN < 100K BTU : 0 15-30 HP . : 0 —MAKE------
SIDE ( 2) . ? O . Ott WATER HEATERS . . . . : 0 FURN )=100K BTU : 0 30-50 HP . : 0 ?
SHRLINE . ? 0 . 0ft CLOTHES WASHERS . . : 0 FURN — FLOOR . . . : 0 50+ HP . : 0 —YEAR------
AREA ---------------- KITCHEN SINKS . . . . : 0 HEAT PUMP . . . . . . : 0 ?
LOT SIZE . . : ? FLOOR DRAINS . . . . . : 0 VENT SYSTEMS . . . : 0 EVAP COOLERS : 0 LENGTH : 0
BUILDING . . . : 0st DRINKING FOUNT . . . : 0 VENT FANS . . . . . . : 0 HOODS . . . . . . . : 0 WIDTH . : 0
BASEMENT . . . : 0st LAUNDRY TRAYS . . . . : 0 DOMES . INCIN : O —SERIAL#----
DECKS . . . . . . : 0st DISHWASHERS . . . . . . : 0 AIR HANDLING UNITS-- COMML . INCIN : O ?
GAR /CARP : ? 0st GARB DISPOSALS . . . : 0 <= 10000 ctm . : 0 RELOC/REPAIR : 0
AT/DT . : ? URINALS . . . . . . . . . . : 0 > 10000 ctm. : 0 OTHER UNITS . : 0
MISC PLM FIXTURES : 0 GAS OUTLETS . : 0
PROJECT 0ESCRIPTI0N:BULKHEA0
PROJECT LOCATION:3J4 MILE PAST ALDERBROOK INN TOWARD TWANOH STATE PARK. LOG HOUSE ON UPHILL SIDE OF RDJBULKHEAD AT WATER SIDE.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 181 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED FOR A PERIOD
OF 181 DAYS AT ANY TINE AFTER WORK IS COMMENCED. EVIDENCE Of CONTINUATION OF WORK IS A PROGRESS INSPECTION WITHIN THE 181 DAY PERIOD. FINAL INSPECTION MUST BE
APPROVED BEFORE B U I L D I N 6 CAN BE OCCUPIED.
OWNER OR AGENT: 224� M LJ 'L DATE:
RLD_PRMT, rev: 13J31J91
MASON COUNTY PERMIT Mason County Bldg. III 426 W. Cedar NULL &DATE NBY
D BY EXPIRATION
P.O. Box 186 Shelton, Washington 98584
I
lit.(r92-1423 PAkl.;[ 1.
E f 4. 0 11WY l Mt, . ton+ t ON
ff'J(dl 1, t Vt I YN Mt1RNI N t+ t;.a lH:rt
r + tlWNI-k t '+ 'ON l kl►t: I tilt
Iks ile, 7? 7) of lie + t I 1 IS a
i 'tl`I uI+' U:�k .�~ : U7NIrri ( ,
r,rr,rr (tl l,f, .�.
ll;t
i
a1
it
ri
• I
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date by
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date b date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
S27 ,
Plumbing Fixtures ($2 each) Fee Fee
No . Toilets Vent Systems X 3 . 00
Bath Basins Vent Fans X 3 . 00
Bath Tubs No. Boilers/Compressors
Showers 0-3 HP 6 . 00
Hot Water Htr 3 - 15 HP 5 . 00
Laundry Washer 15- 30 HP 6 . 00
Sinks 30-50 HP 6 . 00
Floor Drains 50 + HP 6 . 00
Laundry Basins No. Air Handling unit
Dishwasher « 10000 cfm. 7 . 50
Disposal > 10000 cfm. 7 . 50
Urinals Other
Other EvaD Cooiers
Hoods
Permit Basic Fee 3 . 00 Fire Suppression
TOTAL PLMMING $ Domes . Incin.
Comml . Incin.
Reloc/Repair 6 . 00
Mechanical Fixtures Gas Outlets X 2 .00
No. Fuel Types Woodstove segarate
Furn < 100K BTU 6 . 00 Other
Furn >- 100K BTU 6 . 00
Furn - Floor 5 . 00 Permit Basic Fee 10 . 00
Heat Pumps 6 . 00 TOTAL MECHANICAL $
NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AIITHORIZED IS NOT COMMENCED WITHIN I80 DAYS, OR IF CONSTRUCTION OR WORK
IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANYTIME AFTER WORK
IS COMMENCED
OWNERS AFFIDAVIT CONTRA=RS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FRDN THE RMIR9"TS OF THE I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR
CONTRACTORS REGISTRATION LAY RCU 18.27 , AND AN AWARE IN THE STATE OF WASHINGTON AND I AN AWARE OF THE
OF THE MASON COUNTY ORDINANCE REQUIREMENTS FOR WHICH ORDINANCE REOUIREMEMTS REGULATING THE WORK FOR WHICH
THIS PERMIT IS ISSUED AND THAT ALL WORK DOME WILL BE IN THE PERMIT IS ISSUED AND ALL WORK DONE WILL IRE IN
CONFORMANCE THEREWITH. MO CHANGES SHALL BE MADE CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE
WITHOUT FIRST OBTAINING APPROVAL.F" THE BUILDING WITHOUT FIRST OBTAINING APPROVAL FROM THE BUILDING
DEPARTMENT. ----- DEPARTMENT.
= z BY
DATE
Return permit to: Department of General Services
426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628
FOR OFFICIAL USE ONLY: Accepted by: Date :
DEPART IE TAL REVIEW
FOR OFFICE USE MMY
Avprcwa Cold Nota
Approval
Planning:
�v
Environmental Health:
Building Plan Review:'-
V
Occupancy Group:
Fire Marshall:
Other:
Is PEES
11Special Conditions: II 11Site Inspection ( II
n
x II (IBuiiding Permit
II ,(
II lViolation Fee ( 11
II II
pViolation Investigati= Fee ( p
II II I
II 11 u Plan Check ( p
n C7, ,(
II 11 11Plumbing Fee ( n
it II Q �---„
II 11mecaanical Fee ( 11
II 11 Ilwoodstove Fee ( II
II II I. ;I
II 11 IlBuiiding State Fee
11Buildi.^.g Valuation: II (( TOTAL ' i(�'1
40 Permit No.BLD
MASON COMM
BUILDING PERMIT APPLICATION
#1 `� Owner Evelyn S. Murnen Phone# 533-7828 (Dave Murnen)
Site Address 7920 E. SR106
City Union St WA Zip 98592
Directions to Job Site 14 ,,,; , A naQ+ A, nnrl rnn'r T n n i-n01�r-1 'Tgxia 11 a
State Park. Log house on uphill side of road/ bulkhead at water side.
Owner Mailing Address °10 Prospect Ave.
City Hoauiam St WA Zip 9855'0
Lien/Title Holder t!ONTE other
Address
City St Zip _
#2 Contractor Name 11TWF Contractor Reg#
Address Expiration date
City St Zip Phone
#3 If septic is located on project site, include records.
Connect to Septic? rno Public Water Supply n� Well no
(If residential, proof of potable water may be required)
#4 Parcel No. 24-22-3, Tract 22A of Gocvt. lot 3 & TL. 324 3 4 0O C�
Legal Description cPrt 24 Tw 22N R3W Mason County
#5 Building Square Footage: (existing/proposed) `S �`L�
1st F1 / 2nd F1 / 3i Fl / Loft /
Basement / Deck / #bedrooms #bathrooms ..
Garage / Carport / (Circle: Attached or Detached?)
Other sq ft /
#6 Use of building -- Describe work R oai r ;f (-x; st-.i ny
log bulkhead using_ hand tools and family labor . All work will be above
mean high tide and backfilledwith neighbors ors i .
#7 Type of Job: New Add Alt Repair***** Demolition
Woodstove Re-Roof Bulkhead" Other
#8 MOBILE HOME INFORMATION
Model Year Make Model
Length Width Serial No.
#Bedrooms #Bathrooms Type of Heat
#9 Any water on or adjacent to property: saltwater ***** lake
river pond wetland seasonal runoff
other
Show following on the site plan
Lot Dimensi6ns Flood Zones
Existing Structures Fences '
Structure Setbacks Driveways
Water Lines Shorelines
Drainage Plan Topography
Septic Systems Wells
Proposed Improvements Easements
Name of Flanking Street Scale:
Name of Fronting Street Date:
APPLICANT' TO DRAW SITE PLAN BEL01 - -
I
II
APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW
I
i
i,
I
0 4
.24C' -�- f"r 1 rl n 0 n 3 _
#� '" Q V OLL INS DOS , yAY
D u cka b u s ft 5 ' `r
�`�` FOREST z-eabeck .
Q
b. ,f.1 �ENA HAMMA
-
MtNe 'erso ; ���.. . _...�. -.._�,.._ . ,.�__.,,���._..,.e.,..HA M MA 9
BE
y'" 'Sc
3 <: E.
_ A
4 X �----�L ENA
. , CREEK
BREFX �,� `- 6255 Edon rem
'STA/RCASE
LAKE
La 1 � ':•,,.•.:�
K�YNOOCHEE ; '
A h CUSHMAI�l.
t � F LLS .`� .
Lilliwaup
L. Cushman :� f� BELFAIR —3 -
<; DAMS ,�Dewatto
r Hood s port
BROWN t ! 2
CREEK � Ta h u yap 5
j'Potlatch - � 'Allyn
R T ` � : POT TC}- °' IO6 TWANOH t
SK OK O M tS .<... —�`
e '✓' NDIA 1J' AT TAC0Af�
a le.: . . .. . ............. ... \ I N,. r, t"7ACOMA N
t -,� R = n ion ARROWS !
ASHINGTON STATE HISTD,9
'fin, \ : :•::U ,'i
FOR T NiSQ UA1
3 POINT DEf I N(
`'� 1�/QjZLL'CLtzel ` JARR E
. is i E L %
Matlock Lake cave
102
, / WA Rf.IVF1
Dayton 7 ��
0 _ �v S6ttAX/N L
h A �.W A RIN�j
Se o
Lost
L 7
sabellc - ' �ttND, r
23
. : Es.
S Lake 'Bostob Harbor, '
CHAFER P
--USER Cloquallum
IVII
TOLE
1 Q J .. .�
9 n
4
1 I
f .. _.... . . _ _ . _. _ ...._ __ _.
�l
1 /�f
�� -- -- -
_- /
- '�=.
--- -- -- ------- 1�� __ .� - ___
3-
. . ._
� ;;-=-
, ,
_. . _
-t--�----- �� - - - - - -
., .
_ .
1
4
•• t t
,` »... .. `... .. ` ,'f' ,� � "t.y. •.{l5'af.ki...:Y F,.y'�✓F.,....n.•.Se ..daersl w.w+n.:9.^wr:
+.,t•.w ,�a.u�YM � _"— '►.._ y. r..w'•vy,•ora., nn:a,v r �r.'w ....:"«"; ,....
� �;. �. ..,sire 4a •` 7,1lt4^(+;b� K.rh.w N.t;yek„ayyx•�w rrrnuti.�.�,(�trm+•�' eio«aY��n... �,r.,� _ -"'�'" •�}�.•�� A-,aiIN
ry
a.r.w...w....i „w..a•w�..o++......r.k. t
9 I '
Li
� _ `r-J' �,, �,��`; - �..._ . ... �•- . �+1 �� �]�w,� lam.• ,r' • �- ----�1
J)/ t�;�.ew+.� l(d'�'�'n�•r..� i�.T».Mf+��� •� �'JG�� •V �w �'. .�.. i �,e I C� `�• J
•( «.i' ..t�:?%� � � ..v'Y""., v-.. •' , a ♦ f rw ,y1' •^r"�• 1.
�,�.�^'''� ,y�' 7 (. � `�'�'�i'"'��""V �/. "_ ��" �f.•{_.�!� � '}�P e •?4y )+tl'� �` `,•4 � -- i
n ... •"""— ,�' `Yrr r .`J,.! it r .•+P 'I y F f.f 'y t l• -'I r:�/'r � `/'...�� A �I,�;:�iN'y, /J1 d1l� l .���•/r! 'Y..,.I;,r,`+.•`••ti.y� ;S� �:1.
f A� �,,.r^"" �'+�; /'" d- I' �t' r. s �j !- �� ' 7r r"�.,ti•••. :�.,s,,..f
..•"' %!�s'J''! r'� � Yi� ;� .,p� �����f1•s r. �{ �_ , 1 . � a �i 1+�.� �'y'7r y'tix�,G,•e_k1� ��� !L' tC8.1q,G�i( v/a�.� f"� �L.if awl��•,
tll
40
/ ..'`� !� �J,� y 7Mi {`� p !:i :P: t$,i FF�i�y,,y�,,..:r y�}-•�.'S•_`iy 4 4 ,..kM !k�r i` •' ,� _.is »W�� �d.''� ��lpiJ(�. G�� •• ,,,'�.r 1 ,•M 1�
y,key,`ka r a..,t•t y ,�,' J. �r!+1P;xi ::,,�+�°� "` s I i ,
3
t �
RECEIVED
FEB 0 3 1993
MASON CO. PLANNING DEPT.
Mason County DCD Murnen
Planning Dept . 1505 W. First
Attention : Don Brush Aberdeen,WA
P . O . Box 578 98520
Shelton, WA 98584
RE. Bulkhead repair at: sec 24, twp 22, r 3 Mason
Dear Don,
Thankyou for the onsite visit of January 26th.
The purpose of this letter is to provide you with a
narrative of the repair process of our bulkhead,
specifically as it related to the decision to use or replace
the lowest (3) rows of logs.
The two top-most logs were removed by trenching behind the
bulkhead, then chain-sawing and prying between the layers.
Several strong backs with peewees, bars and saws made clean
work of this job . None of the backfill soils ever made
contact with the tide waters . Many of the original metal
drift pins had to be cut off with a power cutting wheel .
Not being able to remove these 62 year old pins was our
second clue that the lower (3) logs might be very worthy of
reusing. The first clue was their stalwart visual
appearance .
The final clue was driving in a few test pins . From there,
having pre-drilled the upper log, it was all we could do to
drive 30"x 3/4" zinc coated rebar spikes into the logs
below.
In trying to account for our good luck, we decided that
these logs were inundated at most every tide and were
impervious to all but toritos and sand blasting wave
action . This, in our minds, defined mean " high tide . "
The location of the "dead-men" was determined by excavating
the original materials and replacing them.
We added one more log than the original to prevent winter
storms and exceptional tides from removing any fill .
Our next door neighbor, Al Kane, donated the materials
needed for filling the balance . It was clean glacial fill
from just across the road .
There is a sloping ramp like area at the east end of the
bulkhead . This material would be used to fill behind the
proposed new terraced pathway. Please see the original cross
section print for this detail . We feel this will also help
to support the highway edge and prevent erosion .
I hope this will adequately describe our process for you to
come to the same conclusion we did on the site . Our obvious
intention has been for this bulkhead to last as long as the
one be o e it and no amount of labor or material would have
been par d to t end .
Sin rely
D S . Murne
I