Loading...
HomeMy WebLinkAboutSEP2005-00106 Danger Trees TPN322344490012 - SEP Determinations - 5/4/2006 ���STATg pt. z E � EiVED 1889 spy MAY 0 5 2006 STATE OF WASHINGTON DEPARTMENT OF ECOLOGY MASON W, PLANNING DEPT. PO Box 47775 • Olympia, Washington 98504-7775• (360) 407-6300 May 4, 2006 Mr. Michael MacSems r Your address Department of Community Development _- is in the Planning Division -1 Kennedy- Mason County Goldsborough PO Box 279 watershed Shelton,WA 98584 Dear Mr.MacSems: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Vermillion Phased project(SEP2005-00106), located at 8371 East State Route 106 in Union,as proposed by Jerry Vermillion. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): SHORELANDS: Kim Vanzwalenburg(360)407-6520 It is unclear to me what the full proposal is, but it would appear that a Shoreline Substantial Development Permit may be necessary. It would also appear that this proposal is inconsistent with the Shoreline Management Act(SMA)and the Mason County Shoreline Master Program(MCSMP). Even if it is determined that a shoreline permit is not necessary,the proposal must be consistent with the SMA and the MCSMP. Hood Canal is a Shoreline of Statewide Significance. As such,only selective commercial timber cutting is allowed,with no more than thirty percent of the merchantable trees harvested in any ten year period(RCW 90.58.150). Clear cutting of timber is allowed if solely incidental to the preparation of land for other uses authorized by this chapter. It is not clear in the checklist whether this is the case or not,though that does not appear to be the case. In addition,as a Shoreline of Statewide Significance,there is a preference for uses set forth in the Shoreline Management Act(SMA)and the Mason County Shoreline Master Program in the following order: 1. Recognize and protect the statewide interest over local interest 2. Preserve the natural character of the shoreline 3. Result in long term over short term benefit 4. Protect the resources and ecology of the shoreline 5. Increase public access to publicly owned areas of the shoreline 6. Increase recreational opportunities for the public in the shoreline I saw no discussion in the checklist regarding how this proposal is consistent with these preferences. As presented, it appears that this proposal is inconsistent with the first four preferences. i10 May 4,2006 Page 2 I saw little discussion of why or how it was determined that this entire 100 foot long corridor has been deemed to be full of danger trees that must all be removed. There is a reference to"PUD assistance with danger tree removal Is there a program being undertaken by the PUD to remove danger trees along SR 106? If so,this should be looked at in a comprehensive manner and not lot by lot. Will there be similar requests along other portions of SR 106,or State Route 101 for that matter? I am having difficulty understanding how the cumulative impacts of proposals such as this would be consistent with the Shoreline Management Act or the Mason County Shoreline Master Program. The geo-tech report was not included with the checklist so I am unclear how removal of vegetation on this slope above the state highway will affect slope stability. There is ample research on forest lands that show deforestation of slopes does have a negative impact on slope stability. I also have concern about how erosion and sedimentation will be managed as there appears to be shellfish beds along this portion of shoreline. Ecology's comments are based upon the information provided with the SEPA checklist. As such,they do not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (DN: 06-3286) cc: Kim Vanzwalenburg, SEA Jerry Vermillion(Proponent) oN.STATE MASON COUNTY �P5 MO O ° DEPARTMENT OF COMMUNITY DEVELOPMENT 4 r s u = Planning Division ~ 0 T L? P O Box 279, Shelton,WA 98584 �0, Y o~ (360)427-9670 1864 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2005-00106 Description of Proposal: Montana Reach: Timber Harvest and removal of "danger trees" adjacent to Hwy 106. This project involves the destruction of Fish and Wildlife Habitat in the 100-foot buffer of Hood Canal and a Type IV stream. A habitat management plan has been written by Lee Boad and approved by Mason County for the restoration of the damaged buffers. In this case the destruction of habitat was considered necessary to protect Hwy 106 and a PUD power right of way. See conditions. Cutting elsewhere on the site will result in a homesite and driveway for the eastern most parcel. Mitigation for the removal of some Pileated Woodpecker habitat is required in order to comply with Washington Labor's and Industries regulations. MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2005-00106 Proponent: JERRY VERMILLION Site Address (If Assigned): 8371 E STATE ROUTE 106 UNION Directions to Site: SR 106, about four miles east of Union. Parcel Number: 322344400000 Legal Description: G.L. 1 LYING NLY OF CO R/W EX S 24/53 PCL 1 OF BLA #00-40 SEE BLA #05-10 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverser impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Michael MacSems at ext. 571 with any questions. This DNS is issued under 197-11-340(2), the Lead Agency will not act on this proposal for 14 days from the date below. Comments must be submitted to Michael MacSems, C/O Mason County DCD, Planning Division, PO Box 279, Shelton WA 98584 by 5/5/2006. There is no SEPA administrative appeal. a t -2f— 66 Authorized Local Government Official Date e�DNR SEPA Review Anny Corps ` Fish& Wildlife 61cy SI Q /DNR S Puget Sound f'Applicant Squaxin Tribe j/ Dept of Ecology y Contractor d Skokomish Tribe e 14 h Dept of Transportation School District City of Shelton Rc='C4 nen} Mason County Transit v/0 /-) V4P MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2005-00106 CONDITIONS OF THIS DETERMINATION �) LANDSLIDE HAZARD Timber removal and road construction shall be consistent with the conditions of geo-technical reports written by Geo-Technical Laboratory and Sub Terra Inc for this site. Violations of this condition shall be enforced per chapter 15.13 of the Mason County Development Code. X 2) FISH & WILDLIFE HABITAT BUFFERS Destruction of fish and wildlife habitat in the salt water buffer as well as the buffer of a Type IV stream shall be mitigated per the conditions of a habitat management plan written by Lee Boad. Restoration work shall begin as soon as feasible. Monitoring of the success rate for the mitigation shall be done on an annual basis for three consecutive. Restoration/Mitigation work to be consistent with section 17.01 .210 of the Mason County Resources Lands and Critical Areas Ordinance. Failure to perform shall result in penalties per section 15.13 of the Mason County Development Code. X 3) PILEATED WOODPECKER HABITAT Supplemental to Lee Boad's Habitat Management Plan, Mr. Boad mapped and flagged two Pileated Woodpecker habitat patches on parcel 32235-32-00130. Violations of this condition shall be enforced per chapter 15.13 of the Mason County Development Code. X 4) STORMWATER & EROSION CONTROL MEASURES Escape of silty water or mud from the timber harvest area shall be considered a violation of County and State stormwater management regulations, and could subject the applicant(s) to civil fines or penalties. X MASON CO. ENVIROMIENTAL CP.ErKLI. BACKGROUND StP Z oo S . O G�d6 r. Name of proposed project, if applicable: It,0NTR 4/0 to �` c 2. Name of applicant: 3. Address and phone number of applicant and contact person: .Jlln l{uJv4jEaj::�o" - z7124- - S'o $374 5'R1d4- T! — 33�oQ �t�110hk A ' p_� w GRke— , Jo „rs �Feu/s �) .��� -SLo-o�f�-� ggsq I- 4. Date checklist prepared: 5. Agency requesting checklist: /rIRSo� Go. 6. Proposed timing or schedule (including phasing, if applicable): MliKs4oWP4 PHA-3E 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: If yes, explairy� (7A�,G �2 _�_, f g g�1y��df�L� //n�B IZ {�A�v�sv � g'l ie CAL (p ,2 ,S�P ri L 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. '0aRq 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. /VD n(C 10, List any government approvals or permits that will be needed for your proposal, if known. 1 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) &AP �dAl g�a /0tJ ptTE-D .- 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one): Flat, rollin , hi eep slopes, ountainous, other b. What is the steepest slope on the site (approximate percent slope)? C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. d. Are there surface indications or history of unstable soils in the immediate vicinity: If so, describe. S G'C 0 • Mason County Environmental Checklist Page 2 e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. IT�PRbK 8pD /A'i2As t�+= (iK.'f/F��+.— ON DAD — �AT/vL o�c/ stT� MAT��►A L f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. e g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? 3 CRB II h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: A(o)vt 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. �o�tdwS7�ol� �i►rG��CS� W pv.c� S,rto�� i b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. ' /11/okE Mason County Environmental Checklist Page 3 C. Proposed measures to reduce or control emissions or other impacts to air, if any: 3 WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. WOPP5 eANAL- unl -/JAA'ti�.� TRH B, I'v CAVAL 1-017{40�.'� IQB� vEG �occ,�D C0,4?4 >jfI ° 11,` . 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. yFs — DaAj6cit rRjef tefjt00A,L 4t4n Qok� �oOST0uzO'Vav 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. we'de 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. ,A/D Mason County Environmental Checklist Page 4 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. A/D 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. d b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. �d 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example; domestic sewage, industrial, containing the following chemicals..., agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. #DXla C. Water runoff(including storm water): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this flow into other waters? If so, describe. 2) Could waste materials enter ground or surface waters: If so, generally describe. /1O Mason County Environmental Checklist Page 5 I f X d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: 4. PLANTS: a. Check or circle types of vegetation found on the site: ✓ deciduous tree: alder, maple,,a&pen, other evergreen tree: fir, cedar„Qhfe, tic ✓ shrubs rass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? 14j ` C. List threatened or endangered species known to be on or near the site. ,Ajo IV C. d. Proposed landscaping, use of native plants, or other measures to-preserve or enhance vegetation on the site, if any: AteNE Mason County Environmental Checklist Page 6 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: gam hawk, heron, eagle, songbirds, other als deer, bear,pl"c,4seftr, other Ness, salmon, trout, herring, shellfish, other .DHSS) �'f bg b. List any threatened or endangered species known to be on or near the site. yc1 o t4 E I C. Is the site part of a migration route? If so, explain. /4 D d. Proposed measures to preserve or enhance wildlife, if any: 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. �10 e,4 *S C R /14 Z✓ 3 7 f2 u.t7r�/D I✓ ��/� b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: 'Vo M +G Mason County Environmental Checklist Page 7 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. 1) Describe special emergency services that might be required. NASo,v 4�&"rarj 2) Proposed measures to reduce or control environmental health hazards, if any: i /-I-AZ-Mgly Moot Wy GDP b. Noise. 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise would come from the site. ArcvE. -0X7L , %JSYR-�gLd1�-�,'1 CLtAR��t9� t f�u�rW1L�Y A OK (o PM Argr iK0"( f 3) Proposed measures to reduce or control noise impacts, if any: 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? Mason County Environmental Checklist Page 8 b. Has the site been used for agriculture? It so, describe. ,tlo -- Tier:R�au� C. Describe any structures on the site. C o 2iJ f-: R �ocvy� AND Du,T 6 NAi-O( d L IIGI A10 d. Will any structures be demolished? If so, what? e. What is the current zoning classification of the site? c YlAr j- RK�a f. What is the current comprehensive plan designation of the site. IQu.R E0141I A L g. If applicable, what is the current Shoreline Master Program designation of the site? , j?k.&AL. Rf,#tV(Ni)At h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. &),-rH Wx/ 14,8,041E GQoc���X�L i. Approximately how many people would reside or work in the completed project? go,kr r- PAS s j. Approximately how many people would the completed project displace? �o ft F k. Proposed measures to avoid or reduce displacement impacts, if any: �110 i i i i i Mason County Environmental Checklist Page 9 I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. �o JV 6 )04.4 s F- .� b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. C. Proposed measures to reduce or control housing impacts, if any: C 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? �vo KE f��As E b. What views in the immediate vicinity would be altered or obstructed? Nof4E C. Proposed measures to reduce or control aesthetic impacts, if any: fI0gF- Mason County Environmental Checklist Page 10 -11. LIGHT AND GLARE .a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? C. What existing off-site sources of light or glare may affect your proposal: d. Proposed measures to reduce or control light and glare impacts, if any: lJD µ F 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? Mt-- b. Would the proposed project displace any existing recreational uses? If so, describe. �lv C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: I./oyE Mason County Environmental Checklist Page 11 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, nation plate, or local preservation registers known to be on or next to the site? If so, generally describe. A/'o,4/ 4-� b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. C. Proposed measures to reduce or control impacts, if any: AIOAIC 14. TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any., b. Is site currently served by public transit? If no, what is the approximate distance to the existing street system? Show on site plans, if any. 1(D/it C. How many parking spaces would the completed project have? How many would the project eliminate? NOAlE d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). .AM Mason County Environmental Checklist Page 12 I " e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. V1'OJ X T 7 f. How many vehicular trips per day would be generated by the completed project: If known, indicate when peak volumes would occur. //,pNC' g. Proposed measures to reduce or control transportation impacts, if any: 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? If so, generally describe: ,Uv b. Proposed measures to reduce or control direct impacts on public services, if any: woN E Mason County Environmental Checklist Page 13 16. UTILITIES: a. Circle utilities currently available.at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other: Xo,/F )JNAS J .l b. Describe the utilities that are proposed-for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. ASS/X'X'* AtLtQ 7—RE9 00fA"i/A?L Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to mIa�ke its decision. h IF P r �cw-- (1 t N—ftyv f} i N C— L, Signature: Date submitted: Mason County Environmental Checklist Page 14