HomeMy WebLinkAboutPAR2002-00021 - PAR Application - 3/13/2002 Case number:MIS
PAI?—Zoo Z—pUb e—
MASON COUNTY D i--S
PRE-SUBMISSION CONFERENCE REQUEST FORM
The purpose of the pre-submission application is to identify and/or eliminate as many potential problems as
possible in order for the project to be processed without delay. Representatives from the Building Department, Fire
Marshal's office, Environmental Health, Planning, and Public Works departments may attend the meeting to discuss rules
and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan,
shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire
protection and life safety of the proposed project. By providing the most accurate and detailed information on the
application and site plan your pre-submission conference will be more informative.
Pre-Submission conferences are held every Wednesday and last approximately one hour. To schedule a meeting
complete the application on both side and return 7 copies of the site plan to the Mason County Permit Assistance Center,
attn.M. MacSenis. If you have questions call (360)427-9670 ext. 281.
Date: March 6, 2002 Submit 7 copies
'l bc�
Applicant: Include the following
Name: Harmony Hill of Union �,�,�C ` information on site plans:
Address: 7362 E. S.R. 106 e ✓ Property lines,easements,and right-
Union WA 98592 of-ways.
{
✓ 'Ilse location of all existing and
Daytime telephone: 360-898-2363 f proposed structures.Include square
footage of existing and proposed
Representative buildings.
Name: Michael Sumner ✓ Setback distance,in feet,from all
property lines and buildings.
Address: 7362 E. S.R. 106
✓ Existing and proposed road access to
Union WA 98592 and from the site.
✓Daytime telephone: 360-898-2370 Zero _ 3 — �r'�/p Parking sites
✓ Location of on-site sewage tanks and
Parcel Number: 12 digits drain fields.
32233 —44—00040 ✓ Location of drinking water supply of
proposed site and surrounding sites.
Description of Project: ✓ Steep bluffs,wetlands,streams,and
Include square footage of structure,use of buildings i.e.office,warehouse,etc, bodies of water
occupancy classification(UBC,Table 3-A), and construction type. Provide ✓ Location of fire hydrants and
emergency vehicle access roads,
one set of plans, if available. including grade.
The Remodel and expansion of an existing 1000 sf residence into a ✓ Surface and storm water rim-off
2500 sf Guest facility with Approx.20leds. routes.
16
Site Plan (See Attached)
Continued on reverse side
Case number:MIS
Has this project been discussed during a previous Pre-Submission Conference? If yes,please indicate date
A Pre-Submission Site visit was conducted in February 2002 by Pam Bennett-Cummings
Will the building have employees?If yes, how many? The Site as a whole will have employees.
Ranging from 2— 10 dependent on site activity.
What is the water availability of the proposed project?If there is an existing well,what is the name of the system?
The site is currently operating with a Group B well located within the boundaries of the property.
WRI# 001951 with application for upgrade to group A water system
What is planned for an on-site sewage system?If you are proposing a new on-site system provide detail on the required
site plan.
A comprehensive site wide sewer system designed by Chris Webb of 20/20 Engineering was installed and placed online
in February 2002. This system anticipated site growth with 4"feed into 6"truck lines.
ADDITIONAL COMMENTS:
APPLICABLE BUILDING CODES:
1997 Uniform Building Code-WAC 5140
1997 Uniform Mechanical Code-WAC 5142
1997 Uniform Plumbing Code-WAC 5146/5147
1994 Non-Residential Energy Code/Ventilation and Indoor Air Quality Code
Mason County Ordinance
Date and Time Conference Scheduled: 3/13/(D-Z 2-12—'3 0
Location: i34e,/,J h 1 k_2_'?S
Continued on reverse side
. .r
NON RESIDENTIAL DEVELOPMENT
INITIAL REVIEW QUESTIONNAIRE
In accordance with Washington State's Growth Management Act, the
Mason County Comprehensive Plan regulates the placement, expansion or
7modification of commercial, industrial and public facilities to certain areas of
the county. In the interest of saving you time and money the Department of
Community Development requires this initial review checklist to be completed
and reviewed by this department prior to the submission of any building
permits.
Applicant Name: Harmony Hill of Union Phone#: (360)898-2370
Mailing Address: 7362 E. S.R. 106
Union WA 98592
Directions to Site: North on Hwy 101 to S.R. 106 intersection. Turn right onto S.R. 106(East). Approx 13.5
miles to Harmony Hill. Signage on right. Proceed uphill to Office. (Located'/,miles East of Alderbrook Inn)
Sewer. No Septic:Yes
Water Supply: WRI 001951 Group B water system.
Tax Parcel Nr. 32233 —44—00040
Legal Description: The West one half of gov't lot 1, Sec 33 T22N, R3W,W.M. in Mason County,
Washington. Excepting therefrom the following described: Beginning at a point on the shore of Hood
Canal, S84°09'46"W, 671.31 feet distant from meander corner of fractional Sections 33 AND 34.
T22N,R3W,W.M. in Mason County,Washington. Thence S00°50"E 273.04 feet,Thence S81°
29W 50.56 feet: Thence N00°50'W 272.53 feet; Thence N80°54'E, 50.64 feet to the point of
Beginning.
Excepting therefrom right of way 60 Feet in width for navy Yard Highway,as the same is now
located and in use;The forgoing land being also known and described as tracts lettered U and V and
the East 50 Feet of Tract No. 12 of the unrecorded plat of Callison's Olympic View tracts, being a
subdivision of the West one Half of Gov't Lot 1, Sec 33,T22N R3W,W.M. Mason County,
Washington.
Type of development: The Enhancement and expansion of a retreat center. Remodel of
existing Structure from 1000 sf to approx 2500sf for Guest lodgi
Applicant's Signature: 2-4
fJ�.
OFFICIAL USE
...............................................................................
WGA Approved By:
Existing Commercial Date:
Continued on reverse side
120' 0 60' 120' 240'
OL GAR
�i� �� �1 \
%ice-�\�
x
111 ; f.
\ \ I I I
\ �\\\\\\\\�\\\�\111 �111 IIIIIIII�i�� � IIIIIIIIIIII I
PROPOSED ADDITI N
2020 ENGINEERING,Inc. ::::�r: :; :. HARMONY HILL OVERALL SITE PLAN '
Im aroe vWW/ro am$$m :. .:.—:w. >i WELLNESS RETREAT CENTER
,�,la PROPOSED BUILDING ADDITION
(3opn-2=►An(3@WIM-Wu '%' :>::.:':`.';, 7M2 EAST SW106,UNION.WA 86582
--- -*+-- ^n°° Guest Dwellings Addition&New Mobile Structure a
�"'�� are .we 6. 2M2 I.ATE 2304W sc*ir-. 1v/20' p44NN M' C NEW "vrAW an c mye ararm er:
its � /j
1 � 6OaM 1
Me
�rnrs � r
a.
HARMONY HILL SITE PLAN
1
20' 0 IV 21Y 40'
t
24.0'
} r
1
' LD
G AGE
J i FOO RINT N ti
11100
1 i 33.6
nl i
i .....
rri
j ad ,
2020 ENGINEERING,Inc. ;,�;:: ;„� : HARMONY HILL SITE PLAN Par
no arawr near/w sm 1Q1 :- :. WELLNESS RETREAT CENTER
malm,,,14.,%"mfA„ :>_ "; PROPOSED BUILDING ADDITION
(r0)n1-WW►M4MV)M-o.Ra 736Y EAST SR-108 UNION.WA 88592
New Mobile Structure
.... *—
r..._..r...._......�.. �.w... .w
••••••••�`- are "4k 4 2W2 1.0&2-WftW 9Gfc: 1-.20' [W411W Br: G form DEsr-%w Brk G ofDo C"n xm or 3
Mull
tt � �y
s F��
ej
R
k
e.
d
r �
L
II
4 '�
�..n r ,.. _. .. .. i
� . — ,. �_ I
i —�,�, -- -- i
_...
i
I��
� :�2d t c�� � tP�yy,",," �. 5 �" f.#�
i
y }� t
tip, , F2 �
..e,M —T a >`
r � `ae
'� •, �a� a
:.rw..z� .;�� . .
MASON COUNTY FIRE MARSHAL ' MEDepartent of Emergency Management F5121 �
Sanderson Industrial Complex
410 W. Business Park Road
Shelton,Washington 98584
(360)427-7535
CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION
April 19, 2002
TO: Mike Sumner
FROM: Dave Salzer
RE: Harmony Hill
Pursuant to our phone conversation today, I'm confirming the issue that we
discussed:
A new 2700 sft. structure will be constructed and will be connected to an
existing 800 sft. structure via a 20 ft. long +/- breezeway.
The following fire protection issues will apply:
1. An automatic fire alarm system is required in the new building, the
breezeway and the existing building. The fire alarm system is to be
connected to the campus fire alarm panel that was installed in the
maintenance shop/caretakers apt.
2. The fire alarm installation is to report to the campus fire alarm panel as
a separate zone for each building. The breezeway can be included on
either zone.
3. A separate permit is required for the fire alarm system.
If you have any questions, please contact me.