Loading...
HomeMy WebLinkAboutEcology Surface Mine Permit - PLN General - 10/28/2002 r, Surface Mining and Associated Activities General Permit WASNIN6T0N STATE DEPAATMI NT OF �3.a; E C O L O G Y Site- Specific Fact:Sheet WAG 50-1177 Facility: Mailing Address: Belfair Sand and Gravel Hartman Family Trust 2493 NE Old Belfair Hwy 4 Corporate Plaza Ste 215 Belfair,WA 98528 Newport Beach CA 92660 Allen Shearer Sand and Gravel,LLC Allen Shearer Sand and Gravel,LLC 2493 NE Old Belfair Highway P.O.Box 1880 Belfair,WA 98528 Belfair,WA 98528-1880 County: Mason WRIA: 15 Phone Number: (360) 275-7110 Latitude: 470 29' 15" Contact Person: Bill Leber Longitude: 1220 49' 17" Status'of Facility and Discharges Process Water: 5 discharge points to ground water 2 discharge points to surface water BMPs: Oil/water separator*, Management BMPs*, Collection/routing of water, Water recycling, Infiltration basins, containment*, chemical additives, detention facilities*, spill prevention* Storm Water: discharge points to ground water 2 discharge points to surface water BMPs: Management BMPs*, Collection/routing of water, Water Recycling, Infiltration basins, Vegetation management* * BMPs deficient or lacking (as of 8/13/02) that must be upgraded and implemented. SPECIAL NOTE: THIS GENERAL PERMIT ONLY COVERS WATER DISCHARGES FOR EXISTING OPERATIONS AUTHORIZED BYMASON COUNTY. ALL OTHER PROPOSED ACTIVITY(MINING EXPANSION OR ASPHALT BATCH PLANT)ARE NOT COVERED. SIC Codes for this site: Quantity produced: 1442 - Construction Sand and Gravel MB Coverage date: Ortober 28, 2002 OUTSTANDING REQUIREMENTS • See Discharge Matrix for monitoring. • Prepare and implement Monitoring Plan, ohn M. Pearch Permit Manager Stormwater Pollution Prevention Plan, Erosion & Sediment Contorl Plan, and Sand and Gravel General Permit Spill Plan. Southwest Regional Office BELFAIR SAND AND GRAVEL (ALLAN SHEARER SAND AND GRAVEL LLC) WAG-50-1177 MONITORING REQUIREMENTS AT RESPECITVE DISCHARGE POINTS REQUIRED BMPs AT OR UPGRADIENT FROM EACH DISCHARGE POINT SAMPLE DISCHARGE DISCHARGE DMR FREQUENCY OF BMPS FOR DEFICIENT/LACKING BMPs POINT TYPE TO MEASUREMENT MONITORING DISCHARGE (AS OF 8/13/02) (Site specific REQUIRED BY TREATMENT/ point name) PERMIT MANAGEMENT Pond#1 Process water Groundwater pH Monthly 1) Infiltration 1)Management BMPs basin 2) Erosion/Sediment Control BMPs 2)Collection/ 3)Detention basin---Engineering report required Routing of water (Manage 10 year/24 hour design storm event) Pond#2 Process water Groundwater pH Monthly 1) Infiltration 1)Management BMPs basin 2) Erosion/Sediment Control BMPs 2)Collection/ Routing of water Pond#3 Process water Groundwater pH Monthly 1)Infiltration 1)Management BMPs basin, 2)Erosion/Sediment Control BMPs 2)Collection/ Routing of water Pond#4 Process water Groundwater pH Monthly 1)Infiltration 1)Management BMPs basin 2)Detention basin---Engineering report required 2)Collection/ (Manage 10 year/24 hour design storm event) Routing of water 3 Erosion/Sediment Control BMPs Pond#5 Process water Surface water pH Monthly 1) Infiltration 1)Containment of chemicals&petroleum (Primary (Tributary to basin, products, Gravel wash Union River) Turbidity 2 Times Monthly 2)Chemical 2) Oil/water separator, water pond) additives, 3)Detention basin---Engineering report required Total Suspended Quarterly 3)Water (Manage 10 year/24 hour design storm event) Solids recycling 4)Management BMPs 4)Collection/ 5) Spill prevention Routing of water 6)Erosion/Sediment Control BMPs Pond to be Process water Groundwater pH Monthly Infiltration basin 1) Management BMPs deleted 1 2) Erosion/Sediment Control BMPs X1 Water Stormwater Surface water pH Monthly Collection of 1) Vegetation management(soil upgradient) Sample Point (Tributary of Turbidity 2 Times Monthly water 2) Management BMPs Site entrance Union River 3 Erosion/Sediment Control BMPs X2 Water Process water Surface water pH Monthly Collection of 1) Vegetation management(soil upgradient) Sample Point (Tributary of Turbidity 2 Times Monthly water 2) Management BMPs (Discharge Union River) Total Suspended Quarterly 3) Erosion/Sediment Control BMPs Ditch) Solids X3 Water Stormwater Surface water pH Monthly Collection of 1) Vegetation management(soil upgradient) Sample Point (Tributary of Turbidity 2 Times Monthly water 2) Management BMPs coric I Union River 13) Erosion/Sediment Control BMPs PERMIT No. WAG-50- 1177 Coverage Date:October 28, 2002 Issuance Date: June 25, 1999 Effective Date: August 6, 1999 Expiration Date: August 6, 2004 THE SAND AND GRAVEL GENERAL PERMIT A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM AND STATE WASTE DISCHARGE GENERAL PERMIT FOR PROCESS WATER, STORMWATER, AND MINE DEWATERING WATER DISCHARGES ASSOCIATED WITH SAND AND GRAVEL OPERATIONS, ROCK QUARRIES, AND SIMILAR MINING FACILITIES, INCLUDING STOCKPILES OF MINED MATERIALS, CONCRETE BATCH OPERATIONS AND HOT MIX ASPHALT OPERATIONS State of Washington DEPARTMENT OF ECOLOGY Olympia, Washington In compliance with the provisions of The State of Washington Water Pollution Control Law Chapter 90.48 Revised Code of Washington and The Federal Water Pollution Control Act (The Clean Water Act) Title 33 United States Code, Section 1251 et seq. Until this permit expires, is modified or revoked, permittees that have properly obtained coverage under this general permit are authorized to discharge in accordance with the special and general conditions which follow. 4 VA Megan te, P.E., Manager Water ity Program Washington State Department of Ecology Sand and Gravel General Permit Final.doc June 25, 1999