HomeMy WebLinkAboutEcology Surface Mine Permit - PLN General - 10/28/2002 r, Surface Mining and
Associated Activities
General Permit
WASNIN6T0N STATE
DEPAATMI NT OF �3.a;
E C O L O G Y Site- Specific Fact:Sheet
WAG 50-1177
Facility: Mailing Address:
Belfair Sand and Gravel Hartman Family Trust
2493 NE Old Belfair Hwy 4 Corporate Plaza Ste 215
Belfair,WA 98528 Newport Beach CA 92660
Allen Shearer Sand and Gravel,LLC Allen Shearer Sand and Gravel,LLC
2493 NE Old Belfair Highway P.O.Box 1880
Belfair,WA 98528 Belfair,WA 98528-1880
County: Mason WRIA: 15
Phone Number: (360) 275-7110 Latitude: 470 29' 15"
Contact Person: Bill Leber Longitude: 1220 49' 17"
Status'of Facility and Discharges
Process Water: 5 discharge points to ground water
2 discharge points to surface water
BMPs: Oil/water separator*, Management BMPs*, Collection/routing of water, Water recycling,
Infiltration basins, containment*, chemical additives, detention facilities*, spill prevention*
Storm Water: discharge points to ground water
2 discharge points to surface water
BMPs: Management BMPs*, Collection/routing of water, Water Recycling, Infiltration basins,
Vegetation management*
* BMPs deficient or lacking (as of 8/13/02) that must be upgraded and implemented.
SPECIAL NOTE: THIS GENERAL PERMIT ONLY COVERS WATER DISCHARGES FOR
EXISTING OPERATIONS AUTHORIZED BYMASON COUNTY. ALL OTHER PROPOSED
ACTIVITY(MINING EXPANSION OR ASPHALT BATCH PLANT)ARE NOT COVERED.
SIC Codes for this site: Quantity produced:
1442 - Construction Sand and Gravel MB
Coverage date: Ortober 28, 2002 OUTSTANDING REQUIREMENTS
• See Discharge Matrix for monitoring.
• Prepare and implement Monitoring Plan,
ohn M. Pearch
Permit Manager Stormwater Pollution Prevention Plan,
Erosion & Sediment Contorl Plan, and
Sand and Gravel General Permit Spill Plan.
Southwest Regional Office
BELFAIR SAND AND GRAVEL (ALLAN SHEARER SAND AND GRAVEL LLC) WAG-50-1177
MONITORING REQUIREMENTS AT RESPECITVE DISCHARGE POINTS
REQUIRED BMPs AT OR UPGRADIENT FROM EACH DISCHARGE POINT
SAMPLE DISCHARGE DISCHARGE DMR FREQUENCY OF BMPS FOR DEFICIENT/LACKING BMPs
POINT TYPE TO MEASUREMENT MONITORING DISCHARGE (AS OF 8/13/02)
(Site specific REQUIRED BY TREATMENT/
point name) PERMIT MANAGEMENT
Pond#1 Process water Groundwater pH Monthly 1) Infiltration 1)Management BMPs
basin 2) Erosion/Sediment Control BMPs
2)Collection/ 3)Detention basin---Engineering report required
Routing of water (Manage 10 year/24 hour design storm event)
Pond#2 Process water Groundwater pH Monthly 1) Infiltration 1)Management BMPs
basin 2) Erosion/Sediment Control BMPs
2)Collection/
Routing of water
Pond#3 Process water Groundwater pH Monthly 1)Infiltration 1)Management BMPs
basin, 2)Erosion/Sediment Control BMPs
2)Collection/
Routing of water
Pond#4 Process water Groundwater pH Monthly 1)Infiltration 1)Management BMPs
basin 2)Detention basin---Engineering report required
2)Collection/ (Manage 10 year/24 hour design storm event)
Routing of water 3 Erosion/Sediment Control BMPs
Pond#5 Process water Surface water pH Monthly 1) Infiltration 1)Containment of chemicals&petroleum
(Primary (Tributary to basin, products,
Gravel wash Union River) Turbidity 2 Times Monthly 2)Chemical 2) Oil/water separator,
water pond) additives, 3)Detention basin---Engineering report required
Total Suspended Quarterly 3)Water (Manage 10 year/24 hour design storm event)
Solids recycling 4)Management BMPs
4)Collection/ 5) Spill prevention
Routing of water 6)Erosion/Sediment Control BMPs
Pond to be Process water Groundwater pH Monthly Infiltration basin 1) Management BMPs
deleted 1 2) Erosion/Sediment Control BMPs
X1 Water Stormwater Surface water pH Monthly Collection of 1) Vegetation management(soil upgradient)
Sample Point (Tributary of Turbidity 2 Times Monthly water 2) Management BMPs
Site entrance Union River 3 Erosion/Sediment Control BMPs
X2 Water Process water Surface water pH Monthly Collection of 1) Vegetation management(soil upgradient)
Sample Point (Tributary of Turbidity 2 Times Monthly water 2) Management BMPs
(Discharge Union River) Total Suspended Quarterly 3) Erosion/Sediment Control BMPs
Ditch) Solids
X3 Water Stormwater Surface water pH Monthly Collection of 1) Vegetation management(soil upgradient)
Sample Point (Tributary of Turbidity 2 Times Monthly water 2) Management BMPs
coric I Union River 13) Erosion/Sediment Control BMPs
PERMIT No. WAG-50- 1177
Coverage Date:October 28, 2002
Issuance Date: June 25, 1999
Effective Date: August 6, 1999
Expiration Date: August 6, 2004
THE SAND AND GRAVEL GENERAL PERMIT
A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
AND STATE WASTE DISCHARGE GENERAL PERMIT FOR PROCESS
WATER, STORMWATER, AND MINE DEWATERING WATER DISCHARGES
ASSOCIATED WITH SAND AND GRAVEL OPERATIONS, ROCK
QUARRIES, AND SIMILAR MINING FACILITIES, INCLUDING STOCKPILES
OF MINED MATERIALS, CONCRETE BATCH OPERATIONS AND HOT MIX
ASPHALT OPERATIONS
State of Washington
DEPARTMENT OF ECOLOGY
Olympia, Washington
In compliance with the provisions of
The State of Washington Water Pollution Control Law
Chapter 90.48 Revised Code of Washington
and
The Federal Water Pollution Control Act
(The Clean Water Act)
Title 33 United States Code, Section 1251 et seq.
Until this permit expires, is modified or revoked, permittees that have properly obtained coverage
under this general permit are authorized to discharge in accordance with the special and general
conditions which follow.
4 VA
Megan te, P.E., Manager
Water ity Program
Washington State Department of Ecology
Sand and Gravel General Permit Final.doc
June 25, 1999