Loading...
HomeMy WebLinkAboutFinal Drainage Review - PLN General - 3/12/2013 .. La c t o r f N 6 1 N I f R I N 6 . IN ( 2724 Black Lake Blvd. SW Suite 202 Tumwater WA 98512 Phone: 360-352-2477 Fax: 360-352-0179 3.12.2013 Larry Waters Mason County Community Development PO Box 279 Shelton, WA 98584 Via e-mail: law(a-)_co.mason.wa.us RE: Alderbrook Clubhouse— Final Drainage Review We have performed 2 separate inspections of the storm drainage system designed by Vector Engineering Inc at the above referenced site. The first inspection was for all plan work up to the retaining pond connection and the second inspection was to verify the construction of the bioswale outlet. The built conditions meet the requirement of the plan and specifications. The plans and specifications are based on the 1992 Stormwater Manual as amended by Mason County at the time of submittal. The new construction meets the requirements of this manual. The facility is approved for use. Please call or e-mail with any questions or further requirements. Sincerely �P- WA, �a�� .4 ,r ... XV Ryan Moore, PE `• r Vector Engineering Inc 360.970.5192 ' rmoore(a)vectorengineeringinc.com cc: file XA2010 Jobs\Alderbrook(Biosfiltration)7058\Communication\Serial Letters\SL02_Fina1_Drainage.docx 1