Loading...
HomeMy WebLinkAboutBLD2010-00345 Demo - BLD Permit / Conditions - 6/1/2010 ` Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Irp, Shelton,WA 98584 RESIDENTIAL BUILDING PERMIT BLD2010-00345 OWNER: PAM HANSON RECEIVED: 5/3/2010 CONTRACTOR: DOGWOOD CONSTRUCTION 360-898-6102 LICENSE: DOGWOC1990R4 EXP: 12/242011 ISSUED: 6/1/2010 SITE ADDRESS: 6873 E STATE ROUTE 106 UNION EXPIRES: 12/1/2010 PARCEL NUMBER: 322335000003 LEGAL DESCRIPTION: SUNNY BEACH PCL 4 OF BLA#04-54 &T.L. PROJECT DESCRIPTION: DIRECTIONS TO SITE: Demo of existing cabin and construction of new in same footprint Brockdale, McReavy, R on Dalby, at intersection with St Rt 106 go straight to site address General Information Construction&Occupancy Information Square Footage Information No. of Bedrooms: 1 Type of Constr.: VB Type of Use: SF Insp.Area: No. of Bathrooms: 1 Occ. Group: R-3 Lot Size: Deck: Type of Work: NEW Fire Dist.: 6 No. of Stories: 1 Occ. Load: Building:584 Valuation: Building Height: 16 Occ. Status: Unknown Basement: COV PORCH 50 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: S 100.0 Ft. Shoreline: 13.0 Ft. Water Body: Hood Canal SEPA?: No 35 Model: Width: Ft. Rear: N .0 Ft. Slope: Ft. Shoreline Desi Side 1: E .0 Ft. 9.: Urban Year: Serial No.: Side 2: W 5.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Hosebibs 2 Exhaust Hood 1 Plan Check Fee TW 5/3/2010 $463.94 S12010000 Kitchen Sink 1 Ventilation Fan 1 Planning Review Fee TW 5/3/2010 $205.00 512010000 Lavatories 1 EH Plan Review SJC 5/3/2010 $103.00 S72010000 Water Closets (Toilets) 1 Building State Fee LDK 5/12/2010 $4.50 S12010000 Water Heaters 1 Building Permit Fee LDK 5/12/2010 $713.75 S12010000 Bath Tubs 1 Mechanical Permit Fee LDK 5/12/2010 $22.20 S12010000 Mechanical Base Fee LDK 5/12/2010 $28.50 S12010000 Plumbing Permit Fee LDK 5/12/2010 $49.70 S12010000 Plumbing Base Fee LDK 5/12/2010 $24.70 S12010000 Total $1,615.29 BLD2010-00345 Please referto the following pages for conditions of this permit. 1 of 5 + CASE NOTES FOR BLD2010-00345 CONDITIONS FOR BLD2010-00345 1) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Depart p?t prior to any further inspections being performed or approvals granted. X 2) Owner/�gpnt is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. 3) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or rerr�evaI of approved documents will result in failure of required building inspections. XI 4) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X t : 5) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building D�p 1rtment prior to any further inspections being performed or approvals granted. 6) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab Insulation R-10. Exception: R-30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the undersid�of the roof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation. X ( 4 0 7) Per IRC -SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in accordance with the applicable provisions of this section and the manufacturer's installation instructions. X >�fl BLD2010-00345 Please referto the following pages for conditions of this permit. 2 of 5 J 8) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. A. Drainfield/Reserve requires a 10ft setback from all footing/foundations. B. Septic tank(s) requires 5ft setback from all footing/foundations. C. No foundation drains within 30ft, down gradient of drainfield/reserve area. X ,)rl 9) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). X �1 10) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in perml avocation. X_ 11) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X__ 12) Placement of structure must comply with standards set forth per the international codes regarding descending and/or ascending slopes. X ,_'-(f 13) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County or"c or regulation, must be reviewed and approved by Mason County prior to construction. 14) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspes�for shall be made prior to requesting additional inspections. 15) All property lines shall be clearly identified at the time of foundation inspection. X ,,,)q 16) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Maso County ordinances and building regulations. BLD2010-00345 Please referto the following pages for conditions of this permit. 3 of 5 17 All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for P P Y P Y p tY� P 9 Y action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder- is ve prevented action from being taken. No more than one extension may be granted. X -,�24 18) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X. 19) Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. X 20) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X, � 21) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan" to ensure these structures are shown and meet the setback conditions listed. X dj 22) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X d 23) The proposed project must be consotent wi h all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline Master Program.X 24) Prior to final approval, all upland areas disturbed or �YY Created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). 77,, " 25) All construction and demolition debris must be removed from the shore area after project completion.;l-ro er.disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degredation of State waters. X` 26) Timer, elaspe meter and event counter will be required. Installation permit will be required for the pump tank at the cabin. BLD2010-00345 Please refer to the following pages for conditions of this permit. 4 of 5 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described prp-perty and structure for review and inspection. OWNER OR AGENT DATE: BLD2010-00345 Please referto the following pages for conditions of this permit. 5 of 5 e co o CONCRETE MECHANICAL MANUFACTURED HOME y 0 o Footings!Setbacks Date By Ribbons Cl) Gas Piping o Intenor Date By Interior-Date By Date B Y Z .N Extefw Date.22-/U By ',,17 Exterior-Date By Set-up Point Load I Isolated Footings INSULATION Da By D Date By BG 1 SLAB INSULATION -- Data By FIRE DEPARTMENT Foundation Wails Floors Date By Date By Data By DECKS FRAMING Walls Date By Date 16 gy�,0 Data �7� D By 1�1 PROPANE TANKS PLUMBING vault Date ev Date By OTHER Groundwork Attic Date By Date By TypeDate By D.W.V DRYWALL Type. ,1 //�� Int.Brace Wall Date By Date Ss /U Bya Date By FINAL INSPECTION p v Water Line Fire Separation N Uate By Dates by UaW By Oj m O `° Pass or Request Inspect. 6 5 Type of Insp. Fail Date Date Done By Comments w CD TrpP Tv oK Tv c, ov Z fj` C - dC/--�O v m y O 1_ g 7 ass Z ` t b L=3 4- All IB( o Ld- S/6:-� d 9Cr - ,—VvG Ld/cL &' S:- ss� I d- ,-7 L �. -/U /G'�S'� // St 1c,r�� , (/ f V�_ ell j VIC ,