Loading...
HomeMy WebLinkAbout08-87 - Res. County Road Projects 1100 - 1102 RESOLUTION NO. 8-87 BEFORE THE BOARD OF COUNTY COMMISSIONERS of MASON _ _ County, Washington. In the matter of initiating county road projects and assigning CRP numbers. IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated. These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law provided.(RCII';6.75.05o, 36.80.03o. ;n.,5'O.f)70J�O�Irrr ,ral Rc frrcoces). IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineer's estimates are hereby made in the amounts and for the purposes shown: (1) (2)_ (3) 14) (5C) (6) (7) (9) I91 O D ROAD N Annus+ TYPE OF 77 COST ESTIMATE (THOUSANDS) Const. ROAD NAME AND/OR WORK R Plog. CRP BRIDGE NUMBER LOG ENGIN CONSTRUC I iOPi Item NO. (Soo Code) [A No. No. l.�,P. TO M,P. FEpF=PAL LUCAL Grapeview Loop Road (Int. w/Hwy. 3,!!llyn) 96140 7.96 8.03 A X X 4 12 110 Island View Road 29460 0.00 0.10 A X X 5 20 1101 (Int. w/Hwy. 3) Krabbenhoft Road 29120 0.00 0.10 A X X 4 19 1.102 (_Int. w/Hwy. 3) TYPE OF WORK CODE (5) The construction is to be accomplished by contract A. PRELIMINARY ENGINEERING F. CURBS & GUTTERS If, accordance with RCW 36.77.020 et. seq. B. RIGHT-OF-WAY G SIDEWALKS C. GRADING,DRAINING,SURFACING H. TRAFFIC FACILITIES D. LIGHT BIT,SURF.TREATMENT I. BRIDGE CONSTT3U( TION (6) The construction is to be accomplished by county E. A.C. OR P.C.C.PAVEMENT J. PATHS &TRAILS RCW forces in accordance with RCW36.77.060 and WAC 47.301 136-18. ADOPTED this 27thda of January, 1987 y BOARD OF COUNTY COMMISSIONERS OF ATTEST PIASON ---- ------ —� C LINT �CSjFi. Clerk o e BoarT-" ---- -"-"-- _ cc: Commissioners Engineer JOURNAL : Publ . lt : 1/29/87 (Bill Road Dept. )