HomeMy WebLinkAboutSEP2023-00082 SHR2024-00003 Chelsea Farms Aquaculture 3 parcels - SEP Application - 2/9/2024 RECEIVED �p
DEC 13 2023
615 W. Alder Street SEPA ENVIRONMENTAL CHECKLIST
Purpose of checklist
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance,
minimization, or compensatory mitigation measures will address the probable significant impacts or if an
environmental impact statement will be prepared to further analyze the proposal.
Instructions for applicants
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable" or
"does not apply" only when you can explain why it does not apply and not when the answer is
unknown. You may also attach or incorporate by reference additional studies reports. Complete and
accurate answers to these questions often avoid delays with the SEPA process as well as later in the
decision-making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your
proposal or its environmental effects.The agency to which you submit this checklist may ask you to
explain your answers or provide additional information reasonably related to determining if there may
be significant adverse impact.
Instructions for lead agencies
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made,the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B, plus the Supplemental Sheet for Nonproiect Actions (Part D1. Please completely
answer all questions that apply and note that the words "project," "applicant," and "property or site"
should be read as "proposal," "proponent," and "affected geographic area," respectively.The lead agency
may exclude (for non-projects) questions in "Part B: Environmental Elements" that do not contribute
meaningfully to the analysis of the proposal.
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 1 of 15
A. Background Find help answering background questions
1. Name of proposed project, if applicable:
Chelsea Farms Dickson Farm
2. Name of applicant:
Chelsea Farms , Martin Beagle authorized agent
3. Address and phone number of applicant and contact person:
6438 Young Road Olympia, WA 98502 360 866 8059 Martin Beagle
4. Date checklist prepared:
December 12, 2023
5. Agency requesting checklist:
Mason County
6. Proposed timing or schedule (including phasing, if applicable):
Spring of 2024
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
NO
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
DARPA, 401 Water Quality
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
NO
10. List any government approvals or permits that will be needed for your proposal, if known.
Mason County Determination of NonSignificance;Army Corps of Engineers Letter of
Permission, Washington State Department of Ecology 401 Water Quality
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 2 of 15
11. Give a brief, complete description of your proposal, including the proposed uses and the
size of the project and site.There are several questions later in this checklist that ask you
to describe certain aspects of your proposal. You do not need to repeat those answers on
this page. (Lead agencies may modify this form to include additional specific information
on project description.)
Cultivation of Oysters, Manilla Clams, Geoduck on privately owned tidelands located in
Totten Inlet, Puget Sound. Cultivation in a 2.23 acre area within a project area of 2.82 acres,
and over a tidal elevation range from -4.5 feet to +5 feet Mean Low Lower Water (MLLW).
Harvest of oysters and Manila clams begins approximately 18 months after planting;
geoduck duck harvest will be conducted when the organisms reach market size-typically 5
to 7 years after planting.
12. Location of the proposal. Give sufficient information for a person to understand the
precise location of your proposed project, including a street address, if any, and section,
township, and range, if known. If a proposal would occur over a range of area, provide the
range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and
topographic map, if reasonably available. While you should submit any plans required by
the agency, you are not required to duplicate maps or detailed plans submitted with any
permit applications related to this checklist.
621 Totten Shores Drive, Shelton WA 98584. See attached document for maps, site plans,
etc.
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 3 of 15
B. Environmental Elements
1. Earth Find help answering earth questions
a. General description of the site:
Tidelands abutting Mason County tax parcels 22301-50-00020, 22301-50-00021, 22301-50-00022
Circle or highlight one: Flat, rolling, hilly, steep slopes, mountainous, other: Tidelands
b. What is the steepest slope on the site (approximate percent slope)?
1.5
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them, and note any agricultural
land of long-term commercial significance and whether the proposal results in removing any of
these soils.
Intertidal sediments are unvegetated, sandy.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
NO
e. Describe the purpose, type, total area, and approximate quantities and total affected area of any
filling, excavation, and grading proposed. Indicate source of fill.
NONE
f. Could erosion occur because of clearing, construction, or use? If so, generally describe.
NO, no work on the uplands.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
None
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any.
Not applicable
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 4 of 15
2. Air Find help answering air questions
a. What types of emissions to the air would result from the proposal during con struction,_operation,
and maintenance when the project is completed? If any, generally describe and give approximate
quantities if known.
Very very small amounts of gasoline engine exhaust fumes during harvesting of geoducks-( which occurs
only after 5—7 years of growth). The engine powers the water pump used to harvest the geoducks.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
NO
c. Proposed measures to reduce or control emissions or other impacts to air, if any.
Not applicable
3. Water Find help answering water questions
a. Surface Water: Find help answering surface water questions
1. Is there any surface water body on or in the immediate vicinity of the site (including year-round
and seasonal streams, saltwater, lakes, ponds,wetlands)? If yes, describe type and provide names.
If appropriate, state what stream or river it flows into.
Yes, the project is located on privately owned tidelands in Totten Inlet.
2. Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans.
Yes, all work will occur in the intertidal area of Puget Sound from approximately-4.5 feet to +5 feet tidal
elevations.
3. Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected. Indicate
the source of fill material.
No Fill
4. Will the proposal require surface water withdrawals or diversions? Give a general description,
purpose, and approximate quantities if known.
No
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 5 of 15
5. Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
no
6. Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
no
b. Ground Water: Find help answering ground water questions
1. Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a
general description of the well, proposed uses and approximate quantities withdrawn from the
well. Will water be discharged to groundwater? Give a general description, purpose, and
approximate quantities if known.
no
2. Describe waste material that will be discharged into the ground from septic tanks or other sources,
if any (domestic sewage; industrial, containing the following chemicals...; agricultural; etc.).
Describe the general size of the system, the number of such systems, the number of houses to be
served (if applicable), or the number of animals or humans the system(s) are expected to serve.
none
c. Water Runoff(including stormwater):
1. Describe the source of runoff(including storm water)and method of collection and disposal, if any
(include quantities, if known). Where will this water flow?Will this water flow into other waters? If
so, describe.
none
2. Could waste materials enter ground or surface waters? If so,generally describe.
no
3. Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so,
describe.
no
4. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern
impacts, if any.
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 6 of 15
4. PlantS Find help answering plants questions
a. Check the types of vegetation found on the site:
❑ deciduous tree: alder, maple, aspen, other
❑ evergreen tree: fir, cedar, pine, other
0 shrubs
0 grass
0 pasture
0 crop or grain
❑ orchards, vineyards, or other permanent crops.
0 wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
❑ water plants:water lily, eelgrass, milfoil, other
® other types of vegetation-small intermittent prescence of ulvoid algae
b. What kind and amount of vegetation will be removed or altered?
None
c. List threatened and endangered species known to be on or near the site.
None
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation
on the site, if any.
None
e. List all noxious weeds and invasive species known to be on or near the site.
None
5. AnimalS Find help answering animal questions
a. List any birds and other animals that have been observed on or near the site or are known to be
on or near the site.
• Birds: hawk, heron, eagle, songbirds, other:
• Mammals: deer,otters:
• Fish: bass, salmon, trout,shellfish, other:
b. List any threatened and endangered species known to be on or near the site.
None observed on site.
c. Is the site part of a migration route? If so, explain.
Yes, listed species that may use the area potentially are steelhead and perhaps Chinook Salmon.
d. Proposed measures to preserve or enhance wildlife, if any.
Mitigation: the proposed activities include avoidance, minimization, and conservation measures as
required by the Army Corps of Engineers
e. List any invasive animal species known to be on or near the site. None known.
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 7 of 15
6. Energy and Natural Resources Find help answering energy and natural resource questions
a. What kinds of energy(electric, natural gas, oil,wood stove, solar)will be used to meet the completed
project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
During Planting and harvesting: fuel for boats ( one round trip per day); fuel for water pumps utilized in
the harvest activity.
a. Would your project affect the potential use of solar energy by adjacent properties? If so, generally
describe.
NO
b. What kinds of energy conservation features are included in the plans of this proposal? List other
proposed measures to reduce or control energy impacts, if any.
Project does not consume copious amounts of fuel or electricity.
7. Environmental Health Find help with answering environmental health questions
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and
explosion, spill, or hazardous waste, that could occur because of this proposal? If so, describe.
NO
1. Describe any known or possible contamination at the site from present or past uses.
NONE
a. Describe existing hazardous chemicals/conditions that might affect project
development and design.This includes underground hazardous liquid and gas
transmission pipelines located within the project area and in the vicinity.
NONE
b. Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the
operating life of the project.
NONE
c. Describe special emergency services that might be required.
NONE
d. Proposed measures to reduce or control environmental health hazards, if any.
Not applicable
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 8 of 15
b. Noise
1. What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?
None
2. What types and levels of noise would be created by or associated with the project on a short-term
or a long-term basis (for example:traffic, construction, operation, other)? Indicate what hours
noise would come from the site)?
Little noise generated;Harvesting uses 4-stroke gas engines with mufflers
3. Proposed measures to reduce or control noise impacts, if any.
None needed.
8. Land and Shoreline Use Find help answering land and shoreline use questions
a. What is the current use of the site and adjacent properties? Will the proposal affect current land
uses on nearby or adjacent properties? If so, describe.
Only current use of the site is recreational. Parcels to the North and the South of the project area have
shellfish cultivation occurring.
b. Has the project site been used as working farmlands or working forest lands? If so, describe. How
much agricultural or forest land of long-term commercial significance will be converted to other
uses because of the proposal, if any? If resource lands have not been designated, how many
acres in farmland or forest land tax status will be converted to nonfarm or nonforest use?
Not applicable
1. Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides, tilling,
and harvesting? If so, how?
No
c. Describe any structures on the site.
None
d. Will any structures be demolished? If so, what?
Not applicable
e. What is the current zoning classification of the site?
Rural
f. What is the current comprehensive plan designation of the site? I would think the
designation would be aquaculture.
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 9 of 15
g. If applicable, what is the current shoreline master program designation of the site?
Rural
h. Has any part of the site been classified as a critical area by the city or county? If so,
specify.
NO
i. Approximately how many people would reside or work in the completed project?
None
j. Approximately how many people would the completed project displace?
None
k. Proposed measures to avoid or reduce displacement impacts, if any.
Not applicable
I. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any.
We do not anticipate any significant impacts from the project.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term
commercial significance, if any.
Not applicable
9. Housing Find help answering housing questions
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-
income housing.
None
b. Approximately how many units, if any,would be eliminated? Indicate whether high,
middle, or low-income housing.
None
c. Proposed measures to reduce or control housing impacts, if any.
None
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 10 of 15
10. Aesthetics Find help answering aesthetics questions
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?
Cultivation tubes would extend approximately 3" above the beach surface during their 18
months of residence on the site.
b. What views in the immediate vicinity would be altered or obstructed?
none
c. Proposed measures to reduce or control aesthetic impacts, if any.
No impact
11. Light and Glare Find help answering light and glare questions
a. What type of light or glare will the proposal produce?What time of day would it mainly occur?
There is a slight potential for harvesting at night. Harvest personnel would employ the use of
individual headlights.
b. Could light or glare from the finished project be a safety hazard or interfere with views?
NO
c. What existing off-site sources of light or glare may affect your proposal?
None
d. Proposed measures to reduce or control light and glare impacts, if any.
No light impacts.
12. Recreation Find help answering recreation questions
a. What designated and informal recreational opportunities are in the immediate vicinity?
Fishing, boating
b. Would the proposed project displace any existing recreational uses? If so, describe.
No
c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities
to be provided by the project or applicant, if any.
No impact
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 11 of 15
13. Historic and Cultural Preservation Find help answering historic and cultural preservation
questions
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old
listed in or eligible for listing in national, state, or local preservation registers? If so, specifically
describe.
No
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?This
may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas
of cultural importance on or near the site? Please list any professional studies conducted at the
site to identify such resources.
None known
c. Describe the methods used to assess the potential impacts to cultural and historic resources on
or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
Consult online WIZAARD database.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to
resources. Please include plans for the above and any permits that may be required.
No evidence of anything that would be impacted.
14. Transportation Find help with answering transportation questions
a. Identify public streets and highways serving the site or affected geographic area and describe
proposed access to the existing street system. Show on site plans, if any.
Access is by boat only
b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If
not, what is the approximate distance to the nearest transit stop?
No
c. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle,
or state transportation facilities, not including driveways? If so, generally describe (indicate
whether public or private).
No
d. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air
transportation? If so, generally describe.
NO
e. How many vehicular trips per day would be generated by the completed project or proposal? If
known, indicate when peak volumes would occur and what percentage of the volume would be
trucks (such as commercial and nonpassenger vehicles). What data or transportation models
were used to make these estimates?
One boat trip per day when planting or harvesting.
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 12 of 15
f. Will the proposal interfere with,affect, or be affected by the movement of agricultural and forest
products on roads or streets in the area? If so, generally describe.
NO
g. Proposed measures to reduce or control transportation impacts, if any.
NO impacts
15. Public Services Find help answering public service questions
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe.
NO
b. Proposed measures to reduce or control direct impacts on public services, if any.
None
16. Utilities Find help answering utilities questions
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other:
None
b. Describe the utilities that are proposed for the project,the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which
might be needed.
NONE
C. Signature Find help about who should sign
The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
x
SEPA Resp Bible Offical
Type name of signee: Martin Beagle
Position and agency/organization:Authorized Agent
Date submitted: 12/14/2023
SEPA Environmental checklist(WAC 197.11-960) January 2023 Page 13 of 15
D. Supplemental sheet for nonproject actions Find help for the nonproiect actions
worksheet
IT IS NOT REQUIRED to use this section for project actions.
Because these questions are very general, it may be helpful to read them in conjunction
with the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate
than if the proposal were not implemented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; pro-
duction, storage, or release of toxic or hazardous substances; or production of noise?
• Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals,fish, or marine life?
• Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
• Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated (or eligible or under study) for governmental protection, such as parks,
wilderness,wild and scenic rivers, threatened or endangered species habitat, historic or
cultural sites,wetlands, floodplains, or prime farmlands?
• Proposed measures to protect such resources or to avoid or reduce impacts are:
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
• Proposed measures to avoid or reduce shoreline and land use impacts are:
SEPA Environmental checklist(WAC 197-11-960) January 2023 Page 14 Of 15
6. How would the proposal be likely to increase demands on transportation or public
services and utilities?
• Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible,whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
SEPA Environmental checklist(WAC 197.11-960) January 2023 Page 15 Of 15