Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2015-00652 Garage - BLD Permit / Conditions - 10/1/2015
Inspection Line (360)427-7262 �PSON �oU�Tf MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2015-00652 OWNER: LYNNETTE PAYSON RECEIVED: 7/30/2015 CONTRACTOR: TOWN & COUNTRY POST FRAME BLDS 425-743-1555 LICENSE: TOWNCPF099LT EXP: 6, ISSUED: 10/1/2015 SITE ADDRESS: 101 E STEVES PLALLYN EXPIRES: 4/1/2016 PARCEL NUMBER: 122203490363 LEGAL DESCRIPTION: LOT: C OF SP#2455 PTN S1/2 SW PROJECT DESCRIPTION: DIRECTIONS TO SITE: NEW 24' x 36' DETACHED POST AND FRAME GARAGE/STORAGE NORTH ON A S.R. 3 FROM SHELTON LEFT ON STEVES PLACE PAST 101 E BLDG STEVES PLACE General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: u Type of Use: SF Insp. Area. No. of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: ACC Fire Dist.: 5 No. of Stories: 1 Occ. Load: Building: Garage-Detached 864 Valuation: $ 37,065.60 Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline& Planning Information Make: Length: Ft. Front: N 25.0 Ft. Shoreline: Ft. Water Body: Rear: S 100.0 Ft. Slope: Ft. SEPA?: Model: Width: Ft. Side 1: E 20.0 Ft. Shoreline Desig.: Not Applicable Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Urban Growth Area Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Planning Review Fee TW 7/30/2015 $20500 S220150000000i Address Fee TW 7/30/2015 $ 173.50 S220150000000i EH Minor Plan Review TW 7/30/2015 $ 100.00 S6201500000001 Plan Check Fee JBN 7/30/2015 $ 104.51 S220150000000i Building State Fee SLC 9/22/2015 $4.50 S220150000000i Building Permit Fee SLC 9/22/2015 $ 522.55 S220150000000i Total $ 1,110.06 BLD2015-00652 Please refer to the following pages for conditions of this permit. Page 1 of 5 CASE NOTES FOR BLD2015-00652 CONDITIONS FOR BLD2015-00652 1) A Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at (360)427-9670, ext. 450. The building permit will not be"finaled" until the permit holder can show proof that the access permit from Public Works has been "finaled"and approvedZZE X 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1 4 T n signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 3) Owner/Agent is respog3ibto post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X n— 4) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. Tr signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 5) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any f rispections being performed or approvals granted. X 6) Owner/Agent is ible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 7) This structure is approved as unheated space. To be considered unheated space the area may be provided with a heating system that does not exceed energy usage of 1 watt per sq. ft., or 3.4 Btu/h per sq. ft. A permit and approval shall be required prior to installation of any heating system. When a heating system exceeds 1 watt per sq. ft(or 3.4 btu/h per sq. ft)the heated space shall be insulated in accordance with the energy code in effect at the time of permit application. X /�W_ BLD2015-00652 Please refer to the following pages for conditions of this permit. Page 2 of 5 8) THE FOUNDArz STEM SHALL BE PLACED ON UNDISTURBED, FIRM-NATIVE SOIL. X 9) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building De �t prior to any further inspections being performed or approvals granted. X 10) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. A. Drainfield/ Reserve requires a 10ft setback from all footing/foundations. B. Septic tank(s) requires 5ft setback from all footing/foundations. C. No foundatc ins within 30ft, down gradient of drainfield/reserve area. X QQ�� 11) Stock Plan Identification number: This project is approved subject to the provisions identified the Mason County Stock Plan Policy. The site plan approved by the Planning Department, original building plans, and all attachments approved by the Mason County Building Department shall be available for the Mason County Building Inspector at ired inspection. X 12) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. �L X 13) Proposed structure(s) must maintain a minimum of a 5' setback from all property lines, easements and 25' from all County and State Road right of ways. Setbacks are mea the furthest projection of the structure. X 14) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENTAND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall prior to requesting additional inspections. X 15) All property lines shall be clearly identified at the time of foundation inspection. X 16) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordi c and building regulations. X `/ BLD2015-00652 Please refer to the following pages for conditions of this permit. Page 3 of 5 17) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevention from being taken. No more than one extension may be granted. X 18) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connect flfl hing. Install metal connectors approved for contact with the new types of pressure treated material. X 19) Approved per dimensions and setbacks on 07.31.2015 submitted site plan. Setbacks are measured from the furthest projection of the structure. X 20) All property lines shall be clearly identified at the time of foundation inspection. X 21) All construction and demolition debris must be removed from the site after project completion. Proper di�pq�f construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X 22) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent or properties. Silt fencing, straw, or surface matting must be installed and maintained until upland vegetation has become established. X— 23) Concrete le ate or wash water must be contained during construction pouring, such that water quality degradation of adjacent waters does not occur. X 24) The approval of this project is subject to the recommendations and specifications outlined in the 2010 geotechnical report or assessment. All applicable recommendations and specifications shall be applied to the development on this site. Any deviation requires stamped written approval from the registered design professional responsible for the report/assessment, and may require special inspection by same. Structures and/or land modifications (grading, cuts, fills, etc.) required in the geotechnical report/assessment, may require a separate permit. The geotechnical report/assessment shall remain attached to tea-agq�ved building plans. f/l' 25) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Sit�rP fig"to ensure these structures are shown and meet the setback conditions listed. X ��/� 26) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X a- _— 27) All surface water and potential runoff from the proposed development will be controlled on site in drywells and infiltration trenches, and shall not adversely affect any adjacent properties, cause sediment deposits, nor increase the velocity now entering or abutting to any state or county cul of ditch system or road way. X ,,of - BLD2015-00652 Please refer to the following pages for conditions of this permit. Page 4 of 5 OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMI PP CATION F 180 DAYS WILL INVALIDATE THE APPLICATION. gnature Date OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to in ' ate) BLD2015-00652 Please refer to the following pages for conditions of this permit. Page 5 of 5 alte clan Town SZ CoUn 0 16521 Highway 99,Suite C•Lynnwood,WA 98037-3161 PJpase Check After Doing Site Plan: ❑Septic and drainfield POST FRAME BUILDINGS Everett:(425)258-4171 • Puyallup:(253)840.9552 ®Property dimensions /Lot size Draw North Arrow in Cin ® Administrative Headquarters: (425)743-1555 SeW r lines (Existing buildings ❑Elevation of property HW FAX: (425)742-4378 •800-824-9552 etbficks of proposed&existing buildings ❑Bodies of water Contractor's Lic.q:TOWNCPF099LT YJ roposed building ain road with name loor Ian Quality:Our Future Depends On It.'" permabilt.com• facebook.condpermabilt Easements t1 Access t0 proposed building p Job Name:-BEAR- t� rn �.3r�'��y h? g t1E151opes&Contours(5'increments) ` Legal Job Site Address: TaxAccountN: �G" �N' ( ��; � 9 Description: 44 � JLI�I,�GL-D 20 1 J7- 00 69 5Z PLA ,1- , 54 RECEIVED�r r�G -�"'` a ' . JUL 3 1 2015 �Ile 426 W. CEDAR ST. PLANNING: ALL SETBACKS ARE MEASURED ?e,� FROM THE FURTHEST PROJECTION OF THE BUILDING 'a�tA)AY MASON COUNTY DCD PLANNING SITE PLAN REQUIRED TO BE ON SITE CHAN EWUBIECTTO APPROVAL By Date —G '?f'L TOWN ® C 16521 Highway 99, Suite C•Lynnwood,WA 98037-3161 oun Everett:(425)258-4171 •Puyallup:(253)840-9552 POST FRAME BUILDINGS Administrative Headquarters: (425)743-1555 ® FAX: (425)742-4378.800-824-9552 Contractor's Lic.#:TOWNCPF099LT - DIVISION OF permabilt.com•tacebook.com/permabilt Quality:Our Future Depends On It."' DIRECTIONS TO SITE RECEIVED AUG 0 4 2015 JOB NAME: 111104.10T`Tt ?AYso�t 426 W. CEDAR ST. SHIP TO ADDRESS: F-. �rf@VIES 'FL.AC✓)r. rpfrr VOO R TELEPHONE#AT JOB DROP: THOMAS GUIDE Can a semi'turn around at the job drop? ❑Yes ❑No ❑Back-in Only ❑Other Can a two tone get into the job drop? ❑Yes ❑ No ❑Other Can a concrete truck get into the drop? ❑Yes ❑ No ❑Other Will a 4 wheel drive vehicle be required for deliveries? ❑Yes ❑ No ❑Other Directions & IRECTION P - .,Fit !R. V M KKK B.'D IPA us It) } ROAM (STD v1s W4C,fi . STA%f 1-*tFT -M S t T E r/,ST (©t E , STive 5 PLAC L �o �ldaRT� WooD FEAct W If \791 1 C*4 T R�n° 'Truck Dimensions:65'long,8'wide, 121/2'high, and it weighs 35,000 lbs.empty. 2Truck Dimensions:30'long, 8'wide, 121/2'high,and it weighs 18,000 lbs.empty. ®2012 Perma-13i10 Industries FR-35 07/12 I IIII�I II�II IIII I II 1A Ht L:t?'- .... -,.S_— .. ,. i'-F=dAat1'..k w 1 4 RECEIVED RECEIVED AUG 04 2015 TS E JUL 2 8 2015 MEMO 426 W. CEDAR ST. Engineering DATE: 7/28/15 Page 1 of 1 TO: Mason County Building Official FROM:Terry Powell, P.E., Principal SUBJECT: Town & Country Post Frame buildings Plan Use Authorization JOB NAME: Payson 24383 LOCATION: Adjacent to 101 E Steves Place Allyn, WA I have reviewed the above referenced building & site and find that it is in accordance with the on-file stock plan and is authorized for use. 19969 TONAL 12810 N.E. 178th Street, Ste 218 Woodinville, WA. 98072 (425) 481-6601 terry@tse-aep.com s STgTF° MASON COUNTY o P A o N DEPARTMENT OF COMMUNITY DEVELOPMENT F o NUZ Planning Division 7 N Y y 426 W Cedar St, Shelton, WA 98584 (360)427-9670 1864 NOTIFICATION OF INCOMPLETE APPLICATION August 21, 2015 LYNNETTE PAYSON 101 E STEVES PLACE ALLYN WA 98524 Parcel No.: 122203490363 Proiect Description: NEW 24' x 36' DETACHED POSTAND FRAME GARAGE/STORAGE BLDG Dear Applicant: You have submitted a permit application (case no. BLD2015-00652) for proposed construction or development in the county. Upon review of your application, I have determined that the contents of the application are incomplete or do not provide enough detail for review. Therefore, review of your application will not proceed until the necessary information is provided (see the comment section of this letter for details.) Once the information is submitted and the application is complete, I will continue to process your application accordingly. If the additional information is not provided to the County within 180 days of this request, the application shall expire and no further action on the proposed development shall take place. Please contact me at (360) 427-9670, ext. 365 if you have questions. Sincerely, Allan Borden Land Use Planner Mason County Planning Department 8/21/2015 Page 1 of 2 BLD2015-00652 NOTIFICATION OF INCOMPLETE APPLICATION 8/21/2015 Case No.: BLD2015-00652 Comments: Your current permit application for a new garage did not include geologic information or an amendment to the geologic assessment prepared in May 2010 by N.L. Olson & Associates (in Port Orchard at 360.876-2284) that addresses the new construction of a detached garage on the subject parcel that has 15 to 80 percent slopes within 200 feet of the building footprint. Please provide this new study or amendment to the 2010 study to the Permit Assistance Center to continue review of this BLD2015-00652 permit. 8/21/2015 Page 2 of 2 BLD2015-00652 Name ,�J Parcel# /ZZZO-331-90363 BLD# 26I Mason County D U I�D I N C� Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 1 of 2) Per Mason County Code,Title 14,Chapter 14.48 a stormwater site plan is required whenever a building application is made for residential development,or redevelopment',with more than 2,000 square feet of impervious surface 2. 'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,structural development including construction,installation or expansion of a building or other structure,and/or replacement of impervious surface that is not part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment. 2Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas, concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the natural infiltration of stormwater.Open,uncovered retention/detention facilities shall not be considered as impervious surfaces. ,Talculate Impervious Surfaces Please Complete This Table .,.. T Surface Type Length X I Width = Area ' All dimensions in feet Buildings z,41 X 3l- _ X = Measurements for buildings are taken at the perimeter of the farthest projections(example: X = eaves/gutters) X = Driveways X j = 360 X = Length of drive begins at the right of way X = Parking Areas X = X = Any paved, gravel or packed area per definition above table X = Patios/Walks X = X = Any paved, gravel or packed area per definition above table X = Others X = X = If the total impervious area of the proposed site development is greater than 2000 square feet a i X \\ Small Parcel Stormwater to Plan is Required ME If the Total Impervious Surface Area is LESS THAN 2000 Square Feet,please read,acknowledge and sign below. Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described pro rty for review and inspection as may be required. X Owner/ g n ontractor(circle one)Date: Z 3 —/S If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet,please read,acknowledge and sign the information provided on page 2 of 2. Page 1 of 2 • 4 Name o Parcel# %ZZ ZO--3�1—9036 3 BLD# Mason County 13 U I L D f N G Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 2 of 2) Based Upon the information you have provided a Storm water Site Plan IS Required for this development activity. Title 14,Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website: hqp//www.co.mason.wa—us/code/commissioners/index.htm Please follow the links to"Title 14,Chapter 14.48 Stormwater Management". Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan (Mason County Code Title 14 Chapter 14.48 section 14.48.70).You will receive a copy of the Public Works document entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan".This document will assist you in preparing the necessary information and plans for Public Works to review and approve. Per Department of Public Works this document will constitute an approved plan if all of the relevant details*are to be installed in their entirety AND no part of the stormwater system adversely affects any septic system(see Environmental Health information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval. A design by a registered professional may be required for more complex sites. *These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan on the pages that begin with"Handout" PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE A)_/—The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. B) An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works Department can provide additional instructions,guidance and examples. (Section 14.48.130)contact Public works at: Phone:(360)-427-9670 EXT.450 Mail: P 0 Box 1850,Shelton WA 98584 Physical: 415 N 6th St, Shelton WA 98584 If this development has,or will have,a septic/drainfield system you may need to contact Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or any other,parcel.You may also wish to consult with the septic design professional involved with the project. Mason County Division of Environmental Health can be reached at: Phone: (360)-427-9670 EXT.352 Mail:P 0 Box 1666,Shelton WA 98584 Physical:426 W Cedar St,Shelton WA 98584 A condition will be added to the building permit that states,in part,that all conditions the stormwater site plan will be met prior to a request for final inspection of the building permit. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledge t f such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I further ac wled that the information provided is accurate and employees of Mason County are granted access to the above- described rop for review dinspection as may be required. Owne Agent/ ntractor(circle one)Date: 7—Z 3/S Page 2 of 2 L 7�'d" BUILDING MASON COUNTY PERMIT NO. Z3 rj - �O(o5Z DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING•PLANNING•FIRE MARSHAL WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 Mason County Bldg. III, 426 West Cedar Street (360)275-4467 Belfair ext.352 txsa PO Box 279,Shelton,WA 98584 (360)482-5269 Elma ext. 352 RECEIVE D BUILDING PERMIT APPLICATION �'���' M v%10 JUL 3 0 2015 OWNER INFORMATION: CONTRACTOR INFORMATION: 426 W. CEDAR ST. NAME: N/`«Tre S0� NAME:�Nfj(.okxnp)�paa&klle i /'U-z s MAILING ADDRESS: ► %kVe,S Ce- MAILING ADDRESS: �/-Z/ HLd'!X 9g��C CITY: a I LimSTA E: WA ZIP: CITY:Ly,,yNw� STATE: /u�4 ZIP:9po 3 7 PHONE:� -?(,S-�ItLL: PHONE: VZ5-7VJ/,S3SCELL: EMAIL: L&I REG#T"Cf'r'o94 LT EXP.( _/.30_//2 PARCEL INFORMATION: PARCEL NUMBER(12 DIGIT NUMBER) FIRE DISTRICT LEGAL DESCRIPTION(ABBREVIATED):f4LZ' y�Sj'#ZS�s.S/t:i;U S SW ��i vS BLrf /S-d Z- SITE ADDRESS CITY DIRECTIONS TO SITE ADDRESS_N_0&A oAl 5. . ✓ Sl s/ ,dA S�ft-yE5 IS PROPERTY WITHIN 200 FT: SALTWATER ❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND ❑ SEASONAL RUNOFF❑ STREAM❑ DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YES❑ NO ❑ TYPE OF JOB: NEW g ADDITION ❑ ALTERATION❑ REPAIR❑ OTHER ❑ USE OF STRUCTURE(RESIDENCE,GARAGE ETC.) �/�ld41e%,Qr9!�.0 IS USE: PRIMARY❑ SEASONAL❑ NUMBER BEDROOMS_ NUMBER OF BATHROOMS DESCRIBE WORK,,2yar�(. / ,q,Gi j� SQUARE FOOTAGE: /C Klqll — 0603 1 ST FLOOR sq.ft. 2ND FLOOR / sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.ft. DECK sq.ft. COVERED DECK sq.ft.STORAGE sq.ft. OTHER sq.ft. GARAGE sq.ft. ATTACHED❑ DETACHED K CARPORT sq.ft. ATTACHED❑ DETACHED ❑ MANUFACTURED HOME INFORMATION: *4 CO PLAN MAKE ODEL YEAR LENGTH WIDT BEDROOMS BATHS SERIAL NUMBER OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if cong r ction work is suspended for a period of 180 days.PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTI NA TIVI O THI PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X 7-z3 - s ignature of Allplicant Date X 5&I-E r-r OWNER REPRESENTATIVE IONTRACTOR Print Name TE) APPROVED DATE DENTED DATE /CONDITIONS BUILDING DEPARTMENT 1—e— q Z PLANNING DEPARTMENT FIRE MARSHAL � �ii� rian Town&Count ry 1 vere Highway 8-Suite C•Lynnwood,WA 98037-31e1 P ase Check After Doing Site Plan: ❑Septic and drainfield NJ Lot size Draw North Arrow in Circl POST FRAME�BUILDING�S Everett:(azs)z58-a171 Puyallup:(253)840-9552 Property dimensions ewirr lines ❑Elevation of property Administrative Headquarters: (425)743-1555 XiStln buildings Ink FAX: (425)742-4378 • 800-824-9552 g g eOcks of proposed&existing buildings ❑Bodies of water IF Drvisia+OF Contractor's Lic.#:TOWNCPF099LT roposed building ain road with name loorplan Quality:Our Future Depends On it." permabilt.com• facebook.com/permabilt NJ Easements Access to proposed building Slopes&Contours(5'increments) T Job Name: I FF-4 i)4 �jAY Sty Job Site Address:—...., E. L ' C 2,!�Q—SLI R > osa 3 Legal Description: ��yxwy j Tax Account#: "1 s=j�— low stq t 01 ENVIRONMENTAL ZA H ' �',, N o 5U M01INGS SEPTIC 0 R k�AT �0k 107 / ve __NEW fMP aV�duS ,�Uaf,� --�•'c-- P,C)P►n E*tst N 6 N"r 8v wbtK C.1PR IVP WAY �lg► t �.Q_ ao. APPROVED MC PUBLIC HEALTH JUL 3 1 2015 ALP r. r; DO NOT SIGN INCOMPLETE SITE PLAN! `} Customer has verified and approved the location of the building,o6 ntation of the building to the North,and verifies that all Grid White-Customer Copy Plain White-Office Copy ' utilities are shown on this drawing in,the correct locoign. r CUSTOMER SIGNATURE "r � i ��L) �'" LEAD# S&t 791 w ©2012 Perma-Bilt®Industries FR-34 07/12 1111 IN 1 0