Loading...
HomeMy WebLinkAboutMIS96-0422 Woodstove - MIS Permit / Conditions - 6/27/1996 MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 M I S�C E L_ L.-. AN E O U n P EF11 M 1 -r FOR i NSPECT j CANS CAL I 427-9670 MI S96-0422 PARCEL. s322327590120 PLAT : DIVI BLK : LOT JOB ADDRESS • E 314 UNION FIF I GHTS DR AN I ON APPI_ I CANT : DON I VERSON 273-9695 OWNS"R t DON I VERSON 273 ­9695 LEGAL : TA 12 OF SVIVF1 5159 El tk I Of SP 1611 E 514 0110h NFIBHTS GA PROJECT DF SCR I PT I ON : I WOODSTOVE PROJECT LOCATION : MCREAVY ROAD TO NFW UP STATION., GO PAST TO UNION HFIGHTS, GO UP HILL TO TOP . PASS WATER TOWER TO NEXT ROAD, TURN RIGHT GO DOWN ROAD ONE BLOCK, TUR RIGHT AGAIN TO SITE . PROJECT NOTR=S : Eyp — E AMC�UN'T S� DATE RECE I PT WDST S 32 .00 K:' 06/27/96 42264 TOTAI. : 32 00 rOWNER OR AGENT DAT1- MIS-PONT, rtv: 04I01142 COMPL. IANt,F 40 ATIACHED CONDITIONS IS REQUIRED r CONCRETE ' MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date FRAMING by date by date by Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by I ' I I ------------------- MASON COUNTY Mason County Bldg, III 426 W. Cedar P,O, Box 186 Shelton, Washington 98584 w � r� nn I -r � c�►nt r� r -r � c_y r� CHsd No . : MIS86- 0422 f;m : D(JN i VFRSON Pagf x 1 1 ? PURSUANT TO 1991 UNIFORM BUILDING CODE , SECTION 305-(C ) AND SECTION 513 , Ai..L SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM TK STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTN BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PPIOR TO CALLING FOR ANY SITF INSPEC`tIONS . A REINSPECTION FEE , BASED ON RATES IN TABLE :TA OF THE 1991 UNIFORM BUILDING CODE WILL BE ASSES^ED IF OWNEP/CONTRACTOR FAILS TO POST ADDRFSS ON SITE PRIOR TO REQUESTING INSPECTIONS . .__ ��''✓r __._._.__ _.__ .____ 2 4 CONSTRU,,'T I ON PROCESS 1'O BE FIELD CORRECTED,-Ap REQUIRED PFR MASON COUNTY BUILDING DEPARTMENT AND UNIFORM BUILDING CODE .x- ,,/ rf CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date by Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by y date b date b y FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D W WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by `I I I `I • I