Loading...
HomeMy WebLinkAboutBLD2011-00573 Propane - BLD Permit / Conditions - 7/14/2011 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 ot$ MECHANICAL PERMIT BLD2011-00573 OWNER: DOUGLAS, COX RECEIVED: 7/11/2011 CONTRACTOR: QUALITY APPLIANCE INC 360.427.1202 LICENSE: QUALIA1973NJ EXP: 8/11/2011 ISSUED: 7/14/2011 SITE ADDRESS: 121 E LAKE FOREST DR ALLYN EXPIRES: 1/14/2012 PARCEL NUMBER: 122205000128 LEGAL DESCRIPTION: LAKELAND VILLAGE 1 TR 128 PROJECT DESCRIPTION: DIRECTIONS TO SITE: ADDING NEW AVALON LPG INSERT, NEW PROPANE TANK AND 2 ST RT 3, L ON LAKELAND DR, R ON LAKE FOREST DR TO SITE ADDRESS OUTLETS General Information Setback Information _ Type of Use: SF Insp.Area: Front: Ft. Shoreline: Ft. Type of Work: MEC Fire Dist.: 5 Rear: Ft. Slope: Ft. Valuation: Side 1: Ft. Side 2: Ft. Mechanical Fixtures FEES Type Qty. Type By Date Amount Receipt Gas Outlets 2 Mechanical Permit Fee GMM 7/11/2011 $152.20 S120110000( Propane Tank 1 Mechanical Base Fee GMM 7/11/2011 $28.50 S120110000( Propane Stove 1 Total $180.70 BLD2011-00573 Please refer to the following pages for conditions of this permit. Page 1 of 3 CASE NOTES FOR BLD2011-00573 CONDITIONS FOR BLD2011-00573 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-80Q-647.10982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X ) , 2) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON STATE ENERGY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINIM M �TANDARDS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE. X / _ 3) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks filled on site must be located a minimum of 10' from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system air intake (direct vent appliance, ventilation air intake, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Propane tanks less than 125 gallons must also be located a minimum of 5' from any building opening (foundation vents, windows, doors etc). Setback to the public way, or access easements shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be the greater of 5-ft or as specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damagie, protective bollards must be installed. X 4) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All Propane tanks between 125 and 500 gallons must be located a minimum of 10' from any building, possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Setback to the public way, or access easements shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be the greater of 10-ft or as specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective bollards must be installed. X - 5) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks must meet th�inst Nation requirements and minimum setbacks as listed in the Mason County Fire Marshal's Standards for the Installation of Propane Tanks. X TI 6) Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall nqt be used until the final inspection has been performed and approved by a Mason County building inspector. X 1V ' BLD2011-00573 Please refer to the following pages for conditions of this permit. Page 2 of 3 7) Owner/applicant must obtain a seperate I rmit f the placement of any size propane tank serving a fixed appliance within a dwelling structure or unit prior to the placement of the tank. X � 8) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocItion. X 9) The placement of small propane tanks are not normally subject to a permit review by the Planning Department; however, propane tanks are subject to Planning Department regulations. Such regulations primarily consist of setbacks from shorelines and features considered to be critical areas (streams, wetlands, slopes, etc.) If you think such fleatur�s exist on or nearby your property, please tact the Planning Department so that exact setback requirements can be determined. X 10) All property lines shall be clearly identified at the time of foundation inspection. X / ��& 11) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County or�iinanT and building regulations. 12) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holds have prevented action from being taken. No more than one extension may be granted. X �f- 13) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X \ This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation 44york is by means a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Maso unty acces a above described property and structure for review and inspection. OWNER OR AGENT: DATE:��Z —�� BLD2011-00573 Please refer to the following pages for conditions of this permit. Page 3 of 3 .� CONCRETE Gab Piping ��,�l MANUFACTURED HOME 0 o Interior-Date By / -- — k Footings!Setbacks Extemw-Date By Ribbons v o Do to By INSULATION Date By Q C W Set-up Foundation Walls BG I SLAB INSULATION Q Date By Gate By Date By n _ FRAMING Floors FIRE DEPARTMENT cn Date By Date BY Date By Walls PLUMBING Date By DECKS Date BY Groundwork Vault TANKS Date By Date By Date By Attic By OTHER Date D.W.v _ Date By DRYWALL Type: Da By Water Line Date BY Type: Date By Int.Brave Wall Date By W MECHANICAL Date By FINAL INSPECTION � ll Fire Separation _�- CD DDate ✓ ' l 1 By / Date try Date �/ J `�� By m � O E Pass or Request Inspect. CD Type of Insp. Fail Date Date Done By Comments w _ v `° 1 — , 1 4--, CD 1 O a V- 0 N S co a m 3 0) co CD 0 b RERNiIT NO. .. I1AASON GOUNTIj PLUMBING/ME CMl'1QAL PERM-rr APPUCAT[ON' 426 W Cedars P_�0.Bbx 186;Shelton,WA 98584 Shelton(360)_427-9670--Belfair(360)275.4467-Eimer(360)482=5269 On the web www co_mason.wa us APPLICANT INFORMATIQN CONTRACTOR INFORMAT E Owner t Company Name Mailing Address Lam/ C !c D� MailincrgAd re ZSO 7 t 6 R jz�r tJ_ $.Z.Z0 City State�Zip Code 9 ��/ City.She 10 State. Zip Code S , Phon - Other Ph_ Phone3�o-$Z`1 - IZOZ Other Ph_ _ Lien/Title Holder Contractor Reg.41 Qa1 C Tx�l(o L x�_=r am — fT E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC INFORMATION-Connect to New Septic Existing Septic - Connect to Sewer System Name of Sewer System PARCEL INFORMATION-12 i ' P I o Fire District Legal Description La to Site Address(Please include street name, et number and city) ILI C jDa4i - Directions to site 4 property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff - Stream - Slopes or Bluffs > 15'/0 TYPE OF JOB-New Add Alt- Repair Other Use of Building Location of Fcetures/Units-1 st.Fjoor 2nd Floor Basement Garage Closet PLUMBING FIXTURES(Show Number of each) MECHANICALUNITS Type of Fixture No_of Fixtures' Fees Fuel Type_Bectric_LPG_hatural Gas,_Heat Pump_ Toilets Type of Unit No.of Units Fees Bathroom Sink Furnace Bath Tubs Heatpumps Showers Spot Vent Fan Water Heater Propane Tank Clothes Washer -GLftAchen% O tGttten Sinks eAet Stove_�E n Dishwasher Kr:st Hood Hoseb►bs Dryer Vent Other Other Base Fee Base Fee TOTAL PLUMBING - - TOTAL MECHANICAL OWfjER/BUQ=Acknowledges subrnission of inaccurate Wormation may result in a stop work order or perms ravocatiom Adatowiedg:a nerrt of such is by signature below.I declare that I am tie owner,owners legal representative,or the contractor_I further declare that I am entitled to receive this permit and to do the work as proposed in the applicalion.l declare that I have obtained the percussion from an the necessary parties It permissirn is required from any easement holder or any other-party in interest regarding this appfication orthe work proposed in the application,-1 have.obtained permission from them to applyforttus permit and conductthe work proposed- The owner oragent on owners behalf,represents that the information provided is accurate arm grants employees of Masan Carty amass to the above described property and structure for ratnew and inspe-fion_ PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPEC170rfN. 1 X Date- 1 - 1 -Z?)l owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted bi Planning Pd Ckff Date /'2-01 Bid Pd Receipt No. DEPARTM NTAL REVIEW APPROVED DENIED NOTES Building Department Occ Grouo-7voe Constr v' Planning Department Environmental Health Department FEES Plumbing&Base Fee Site Inspection Mechanical&Base fee UFC Plan Review Fee Wood/Gas/Pellet Stove Fee Other Volation Fee TOTAL FEES