Loading...
HomeMy WebLinkAboutADV2024-00098 SWG2023-00387 - VAR Application - 6/3/2024 • Jo uc 't MASON COUNTY Mason Co WeSIVED r COMMUNITY SERVICES - ADv 202 - 000q'a Building,Planning,Environmental Health,Community Health JUN U 3 ZULA 615 W.Alder St.—Bldg.8,Shelton,Wa 98584 Date Rcvd Phone:(360)427-9670 ext.352♦Fax:(360)427-7798 (7F_e`e:T5T60 Request for Administrative Variance for Reduction in the Required Setbacks t74g� For administrative review, the minimum variance on a setback request is 5 feet from the side yard lot lines and 10 feet for front and rear lot lines or any access easement. Request for further reduction requires a standard variance. Setbacks are measured from the furthest projection of the structure, including roof eaves and gutters. Applicant/Owners: .5&L (,(1R/y _ Mailing Address: lo w Jam, A1,0,rL City: &&Puy State: ". Zip: WOO / Telephone: 960 3bg 4.56 I gym) Email: J Q �.VQ �u"J l�t�l�tC •�� If this reduction is tied to a buildi g permit,please give per it case number. 1IW E077G AMV i Parcel Number(s): LIA Ll d`� DOD 90 Zoning 4FS4�N _I& Site Address: . H h Ddr_N 640 Vc LN Requested setback variance: GUI lO ft. 12 Front ❑ Rear ❑ Side ft ❑ Front ❑ Rear ❑ Side ft. ❑ Front ❑ Rear ❑ Side ft ❑ Front ❑ Rear ❑ Side Front Setbacks-From access easements and road right of ways. Minimum 10 feet. Rear Setbacks-From the rear property line. Minimum 10 feet. Side Setbacks-From the side property line. Minimum 5 feet except for certain shoreline designations. An illustrated site plan is required. Your site plan must show the following: north arrow, abutting street or easements, and set backs to all property lines and existing buildings, slopes, surface water,wetlands, critical areas, septic,well and driveway. Show all proposed new development. FRONT AND OR REAR YARD REDUCTION REQUESTS: For existing lots of record as of March 5, 2002; You must meet one of the following: 1) One of the following exists on the lot(check all that apply): ❑ a) steep slopes, wetlands, or streams present; .9 b) soils that restrict building or septic development; ❑ c) lot width at the front yard line of no more than 50 feet; ,N d) lot size of no more than one-fourth acre; ❑ e) existing improvements of buildings, septic systems, and well areas. SIDE YARD REDUCTION REQUESTS: For existing lots of record as of March 5, 2002; You must meet one of the following: 2) One of the following exists on the lot(check all that apply): ❑ a) steep slopes, wetlands, or streams present; ❑ b) soils that restrict building or septic development; ❑ c) lot width at the front yard line of no more than 50 feet; ❑ d) lot size of no more than one-half acre; ❑ e) existing improvements of buildings, septic systems, and well areas. Explain how these circumstances preclude a reasonable development proposal from meeting the setback standard for Rural Residential 2.5, 5, 10, or 20 zones. LUDO/NG 7`d PGf E �5'E��G T*NA-S /N Fi eAJ 7- ,�}S A yiU�� �i2s �"f3�ac,��NG my yre�-tc/ wlT/-1 D16i1- Owne Agent(please indicate) Sign#ure Date Official Use Only Approved by: G CA V 1V\ S G O i?kbv-\ Date Denied by: Date Reason for:denial: !2 / v�,u r /N E, ITE CEN Ep DESIGN �I' �1rw f/ EXPi tS 0&1 JZ I oar IV IA P OVE13 OCT 2 3 2023 MA ? �ON COUNTY ENVIRONMENTAL HfAIT �v 01A ' µ f G i t a wale, Ll��- j5 /JV 6 -,ZPT/C 4S N7'aF" (j461N- 7--