RE: Bulkhead/Retaining Wall Evaluation—Wondervue Condominiums, 5321 E State Route 106,
(Parcel 32232-56-00900)Union,Washington
Dear Mr. Schaaf,
Envirotech Engineering (Envirotech) has completed this retaining wall analysis of an existing modular
block wall, and its influence with respect to an underlying concrete bulkhead. The block wall reportedly
replaced a rock wall about 3 years ago. For design considerations, the block wall is 3 feet high by 18 feet
in length above a portion of the bulkhead that is 4 feet to 6 feet above grade. The existing reinforced
concrete bulkhead has been recently addressed by Envirotech for repairs. The following analysis is
provided:
Existing Concrete Bulkhead with Block Wall Surcharge
Soil Parameters
y = 120 psf
T = 35 °
ca = 0 psf
Pore Pressure: No
Earth Pressure: Active
0 °
yw= 62.4 psf
Load Inputs
q 0 psf
DL 0 Ib/ft
LL 0 Ib/ft
w 0 lb
Soil Conclusions
K 0.27
Wall Geometry (assumed) Ke 0.24
B = 60 in 6 23.33
h = 12 in 4P 0.00
Po gox994
getfn�r, wash�wgtovu92.s28
Ot f: 360-2 j
Cell: 3G�0-68°1-6046
�aK: 360-2��4�89
ewv%rotech@g eotech uLi.ca law fD.cDtM
r i
b= 12 in Rsl 1625.94
H = 10 ft RsH1 1492.96
t= 10 in RsV1 644.00
D= 2 in Rw 0.00
n = 12 in Rq 0.00
Key: No RqH 0.00
RqV 0.00
Re 1099.99
Rs2 0.45
RsH2 O.41
RsV2 0.66
Sliding
Fr= (ZWi + RsV1 + RgV)tan6 + cA+ RsH2 + RsV2 2520 Ib/ft
Fs = RsH1 + RqH + Re +
Rw 1493 lb/ft
F.S.static= Fr/Fs 1.7 o.k.
F.S.dynamic= Fr/(Fs+
Re) 1.1 o.k.
Overturning
Mr= F-Wixi + RsH2y2 + RsV2xsV2 + RsV1 + RgVxsV1 16285 lb
Mo = RsH1yl + Rwyl + RgHyq 4977 lb
F.S.static= Mr/Mo 3.3 o.k.
F.S.dynamic= Mr/(Mo + Reye) 1.4 o.k.
Block Wall Analysis
saturated unit weight of soil (pcf) 130
angle of internal friction (phi) 36
adhesion, ca (lb/ft^2) 0
Footing depth, D (in) 0
height of wall, H (ft) 3
average size of rock (in) 12
maximum weight of rock(lb) 76
coefficient of friction between rocks 0.6
dead loads on wall (lb/ft) 0
live loads on wall (lb/ft) 0
surcharges (psf) 0
distance from top of wall to surcharge (ft) 0
Page 2of 3
OUTPUT
Soil Parameters
earth pressure coefficient, k 0.26
earthquake pressure coefficient, kh 0.19
angle of external friction, delta 24.00 deg
Active Rankine Zone (ARZ) angle 63 deg
90-ARZ 27 deg
Lateral pressure from soil 44 Ib/ft
Lateral pressure from water 156 Ib/ft
Lateral pressure from earthquakes 9 Ib/ft
Lateral pressure from surcharges 0 Ib/ft
Resultant earth pressure 209 Ib/ft
Resultant horizontal earth pressure 191 Ib/ft
Resultant vertical earth pressure 85 Ib/ft
Resultant location from base of single rock 0.35 ft
Resistance against overturning, Rov 235.1
Factor of Safety, F.S. 3.6
We conclude that the existing block retaining wall and its influence of the concrete bulkhead is
satisfactory. Envirotech appreciates the opportunity to be of assistance on this project. We anticipate that
this retaining wall analysis/ conclusions will meet your expectations. Please contact Michael Staten at
360-275-9374 if you have any questions or require additional information.
Sincerely,
Envirotech Engineering
1��1 CLYDE ST
�X WASy�L 9Tn.
r ,
� r2/Z?//�
�3045 VC
�FcIsre�E° w
rs%NAI-
Michael Staten, P.E.
Project Director
Page 3of 3
,fir-��`�'�, �....•- • _ � - f
J �'� S 6�•y-.
,�4 t. ' • � !-yam r[��.� ,y.� � � �•
i-2/05!2014
ir
Tt
it
T �
.$
v, r�
wk�
.� 12 0 l2014
a
EXISTING CONCRETE BULKHEAD
.d .
.d
MHHW VARIES
a '
—8.5 FT MAX ABOVE GRADE
a
d
. o
CORE DRILL F❑❑TINGS 4' d
D.C. AS C❑NSTRUCTION
AID TO PLACE CONCRETE. b
ALLOWS FORM TO MOUNT d
FLUSH TO FOOTING. ZERO
NET LOSS OF BEACH
STRATA SEVERE UNDERMINING
ALONG ISOLATED L❑CATIONS
d -
a
d
BEACH GRADE VARIES
2 FT FILL CAVITIES
J WITH CONCRETE
PROPOSED CONCRETE PLACEMENT
2 FT I--
NOTES,
1. ALL CONCRETE TO BE PLACED ON COMPETENT
UNDISTURBED SOIL.
2. ALL CONCRETE SHALL HAVE A MINIMUM 28-DAY PROJECT/ OWNER/ LOCATION:
COMPRESS3. CONCRETEVE SHALLRENGTH OF 2500 BE PLACED USINpsi.
(MECHANICAL CLYDF S W❑NDERVUE C❑NDOMINIUMS
VIBRATION. P T
4, AT A MINIMUM, CONCRETE SHOULD EXTEND 2 FEET `L� OF %NAS�jt1, �� BULKHEAD REPAIR
BELOW BEACH GRADE, AND FROM THE FOOTING TOE WONDERVIEW CONDOMINIUMS
TO THE BACK FACE OF THE WALL AS SHOWN. 5321E STATE ROUTE 1IU UNION
5. FOUNDATION REPAIR SHOULD BE PERFORMED IN 17' PARCEL STATE
O E 10 MAX ALTERNATING INCREMENTS. MASON COUNTY 6 00900 6. FAST CURING ADDITIVES SHOULD BE APPLIED TO `�
CONCRETE MIX, AS SALT WATER SHOULD NOT /•:: ENGINEERi
CONTACT WET CONCRETE. v owENVIROTECH ENGINEERING
7. ALL WALL CRACKS AND SEPARATATIONS SHOULD BE P 4?0�$ PO BOX 984
THOROUGHLY CLEANED AND FILLED WITH MARINE � �i.
GRADE EPDXY. , �C ISTE. BELFAIR, WASHINGTON 98528
8. ALL WORK SHALL BE IN ACCORDANCE WITH f�SjO�,ALti��� 360-275-9374
PROPRIATE IBC, STATE AND LOCAL CODES.
DETAILS
y��'�C:1wi,CR.i° >✓�r.,vi�pwz��rs�i°D�GiiwO,1� °Rf;v".���:'?U
July 25,2014
Wodervue Condominiums
PO Box 36
Union, Washington 98592
RE: Bulkhead Repair for Wondervue Condominiums
5321 E State Route 106, Union, Washington
Envirotech Engineering has completed this geotechnical/structural evaluation for a concrete bulkhead repair at the
referenced property. The following analysis provides an analysis for sliding and overturning. Design sheets enclosed with
this letter depict specifications and other information relating to this retaining wall design.
Soil Parameters
Y= 120 psf
tP= 35 °
ca = 0 psf
Pore Pressure: No
Earth Pressure: At-rest
P = 5 °
Yw= 62.4 psf
Load Inputs
q 0 psf
DL 0 Wit
LL 0 Ib/ft
w 0 lb
Soil Conclusions
K 0.46
Wall Geometry(assumed) Ke 0.26
B= 60 in b 23.33
h= 12 in W 0.00
b= 12 in Rsl 1362.95
H = 7 ft RsH1 1251.48
t= 10 in RsV1 539.84
D - 2 in Rw 0.00
n = 12 in Rq 0.00
Key: No RqH 0.00
RqV 0.00
Re 569.59
Rs2 0.77
RsH2 O.71
RsV2 0.66
I
PO BOX 984
Belfair,Washington 98528
Off: 360-275-9374
Cell: 36o-689-6045
Fax: 360-275-4789
envirotech@geotechnicalinfo.com
1 of 3
Sliding
Fr= (7-Wi+ RsV1 + RgV)tan6+cA+ RsH2+ RsV2 1821 Ib/ft
Fs= RsH1 + RqH+ Re+ Rw 1251 Ib/ft
F_S.static= Fr/Fs 1.5 o.k.
F.S_dynamic= Fr/(Fs+ Re) 1.1 o.k.
Overturning
Mr= EWixi + RsH2y2+ RsV2xsV2+ RsV1 + RgVxsV1 11668 lb
Mo= RsH1yl + Rwyl + RgHyq 2920 lb
F_S.static= Mr/Mo 4.0 o.k_
F.S.dynamic=Mr/(Mo + Reye) 2.2 o.k.
Y= soil unit weight q = surcharges
T= angle of internal friction DL= dead loads on wall
ca= adhesion LL= live loads on wall
Pore Pressure: pressures due to water w= extra sliding/overturning resistance
Earth Pressure: active, passive, or at rest
¢= angle of backfili
Yw= water unit weight
B = footing width
h = footing thickness
b = footing length Fr= resistance against sliding
H = height of wall Fs= sliding forces
t= wall thickness F.S.static= Factor of Safety.(static)
D = foodting depth F.S.dynamic= Factor of Safety(dynamic)
n = footing length beyond wall face
Key: "notched"footing for sliding resistence Mr= resistance against overturning
Mo= overturning forces
F_S_static= Factor of Safety(static)
F.S.dynamic= Factor of Safety(dynamic)
K= earth pressure coefficient
Ke = earthquake pressure coefficient
s=
Rsl = soil partical resultant force
RsH1 = horizontal resultant force
RsV1 = vertical resultant force
Rw= pore water resultant force
Rq = surcharge resultant force
RqH = horizontal surcharge component
2of3
RqV= vertical surcharge component
Re= earthquake resultand force
Rs2= opposite soil partical relultant force
RsH2 = horizontal component
RsV2 = vertical component
Envirotech is pleased to submit this engineering analysis. If you have any questions or need additional information, please
contact Michael Staten at 360-275-9374.
Best Regards,
Envirotech Engineering
`, cJ_�f)
/STl
Michael Staten, P.E.
Project Manager
3 of 3
� w
eKVwoteak evL-oivxeer K O
ceotechwacal- AraCwage 0 izoadwa�
RE CE jVED
July 31, 2015 AUG 0 6 2015
426 W, CEDAR ST.
Jesfield Construction
PO Box 1590
Allyn,Washington 98524
RE: Bulkhead Repair Inspection—Wondervue Condominiums, 5321 E State Route 106,
Union, Washington(Pmel 32232-56-00900)
COM2O15-00039
To Whom It May Concern:
Envirotech Engineering (Envirotech) has conducted inspections of the reinforced concrete
bulkhead repair for the referenced project known as the Wondervue Condominiums Bulkhead
Repair.
Site inspections were performed on July 29", and July 30t', 2015. Envirotech verified
reinforcement steel, extents of the repair, and observed concrete placement.
We certify that work performed exceeded the engineered plans prepared by Envirotech, dated
February 21,2015, which were approved by Mason County DCD Planning on July 14, 2015.
Please call Michael Staten at 360-275-9374 if you have any questions or require additional
information.
Sincerely,
Envirotech Engineering
ty CLYDp S
G OF ASy� T9T
ti T F
k 43045 cif
FC/STYE
NALtiNG`
Michael Staten,P.E.
Project Director
PO gox984
gel fair, Washiwgtovti98528
Off: 360-2j 593�-4
CCU: 360-689-6045