Exemption from Shoreline Management Act
Case No.: SHX2015-00017 Substantial Development Permit Requirement
The Proposal By: WONDERVUE ENTERPRISES
P O BOX 356
UNION, WA 98592
To undertake the following development:
Due to erosion along footing, repair existing bulkhead footing with added concrete along 44 ft.
length; after-the-fact review of modular block retaining wall located on east wing wall of the
bulkhead.
Within HOOD CANAL and/or its associated wetlands is exempt from the requirement of substantial development
because the development is categorized under WAC 173-27-040(2) as being category
B-normal maintenance
Please contact Allan Borden at ext 365 if you have any questions.
Issued: 5/20/2015
Expires: 5/20/2017 Authorized Local Government Official
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
i------------RD------
� t
•
Date received: 2 3 2015
WASHINGTON STATE of nrmy gineer Pg ' FEB`GD '
of Engineers•
Seattle Distract � T �
Joint Aquatic Resources Permit Agency referen� 'i
1,2 1 Tax Parcel#(s):
Application (JARPA) Form t
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW.
t
t t
t t
------
Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples:Smith's Dock or Seabrook Lane Development) hLelp]
Wondervue Condominiums Bulkhead Repair
Part 2—Applicant
The person and/or organization responsible for the project. hel
2a. Name (Last, First, Middle)
Schaaf, Jerry - Secretary/Treasurer
2b. Organization (if applicable)
Wondervue Enterprises
2c. Mailing Address (Street or PO Box)
PO Box 356
2d. City, State, Zip
Union, WA 98592
2e. Phone(1) 2f. Phone(2) 2 . Fax 2h. E-mail
360-898-4722 ( )
Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Speck Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
http://www.nws.usace.army.mil/Missions/CivilWorks/Regulatory/PermitGuidebook/EndangeredSi)ecies.aspx.
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
http://www.epermitting.wa.goy/site/alias resourcecenterharpa larva form/9984farpa form.asox.
For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help(cDora.wa.gov.
JARPA Revision 2012.1 Page 1 of 14
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) hel
3a. Name (Last, First, Middle)
Merrill, Steve Charles
3b. Organization (If applicable)
Jesfield Construction Co., Inc.
3c. Mailing Address (Street or PO Box)
PO Box 1590
3d. City, State, Zip
Allyn, WA 98524
3e. Phone(1) 3f. Phone(2) 3 Fax 3h. E-mail
(360) 275-6684 (360) 535-2106 ( ) smerrill@hctc.com
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies)where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. hel
® Same as applicant_ (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know,
contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E
to apply for the Aquatic Use Authorization.
4a. Name (Last, First, Middle)
4b. Organization (If applicable)
4c. MailingAddress
(Street or PO Box)
4d. City, State, Zip
4e. Phone(1) 4f. Phone(2) 4 Fax 4h. E-mail
JARPA Revision 2012.1 Page 2 of 14
I
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. hel
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) nel
® Private
❑ Federal
❑ Publicly owned (state,county,city,special districts like schools, ports, etc.)
❑ Tribal
❑ Department of Natural Resources (DNR) -managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) heI
5321 E. State Route 106
5c. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) heI
Union, WA 98592
5d. County rheipi
Mason
5e. Provide the section, township, and range for the project location. hel
'/4 Section Section Township Range
NW 32 22N 3W
5f. Provide the latitude and longitude of the project location. heI
• Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees-NAD 83)
47.35670 N lat. /-123.09607 W long.
5g. List the tax parcel number(s) for the project location. fteipj
• The local county assessor's office can provide this information.
32232-56-00900
5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.)
Name Mailing Address Tax Parcel #(if known)
David & Sally Fisher PO Box 636 32232-50-56001
.._... .... .... --
BeIfair, WA 98528
KR IRA Properties LLC, et al 583 Middle Satsop Rd. 32232-50-47018
- .._...---_.. ______..___.._......_ . _ .
Montesano, WA 98563-9773
_.._. _.
JARPA Revision 2012.1 Page 3 of 14
5i. List all wetlands on or adjacent to the project location. hel
N/A
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. LeM
Hood Canal
5k. Is any part of the project area within a 100-year floodplain? hem
® Yes ❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. nei
Property is completely developed, with only a small area of landscape plants and lawn area.
5m. Describe how the property is currently used. of eM
Multi- family residential condominiums
5n. Describe how the adjacent properties are currently used. nei
Vacant or Single family residential
5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current
condition. t,ei
Large 2 story building containing 6 condominium units, partially over concrete bulkhead. Pier and dock.
Detached carports and storage buildings. Septic system.
5p. Provide driving directions from the closest highway to the project location, and attach a map. el
From Belfair, Hwy 3 south to Hwy 106. Proceed west on Hwy 106 to address on right.
JARPA Revision 2012.1 Page 4 of 14
Part*6—Project Description
6a. Briefly summarize the overall project. You can provide more detail in 6b. ljhei
Excavate approx. 18' to 24" below two separate areas of the bulkhead footing (10' and 34' long
respectively). Install wood form boards even with the waterward side of the footing. Drill 4" holes
through footing and pump concrete into the voids. Remove form materials and backfill areas of
excavation with native material.
Also includes after the fact review of modular concrete block wall previously constructed on top of the
eastern bulkhead wing wall.
6b. Describe the purpose of the project and why you want or need to perform it. fheipl
Existing bulkhead footing is being undermined by beach erosion. Work is to stabilize bulkhead and
prevent damage.
Also includes the installation of a modular concrete block retaining wall that was previously installed on
top of the easterly wing wall of the concrete bulkhead. This work was performed to replace a similar
rock wall in the same location that was failing.
6c. Indicate the project category. (check all that apply) hei
❑ Commercial ® Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (check an that apply) [help]
❑ Aquaculture ❑ Culvert ❑ Float ® Retaining Wall
❑ Bank Stabilization ❑ ❑ (upland)
Dam Weir Floating Home )
❑ Boat House ❑ Dike/ Levee/Jetty ❑ Geotechnical Survey ❑ Road
❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific
Measurement Device
❑ Boat Lift ❑ Dock/ Pier ❑ Marina /Moorage
❑ Stairs
❑ Bridge ❑ Dredging ❑ Mining
El Stormwater facility
® Bulkhead ❑ Fence ❑ Outfall Structure
❑ BuoyEl Swimming Pool
❑ Ferry Terminal ❑ Piling/Dolphin
❑ Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
❑ Other:
JARPA Revision 2012.1 Page 5 of 14
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. h[ eid
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year floodplain.
A small excavator will be brought in from landward to excavate beach in area of repair. Footings and walls will
be formed and poured in place, with concrete pumped in from landward. After concrete has set, from materials
will be removed.
The work is adjacent to Hood Canal.
6f. What are the anticipated start and end dates for project construction? (MonthNear) hel
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: July 15, 2015 End date: September 15, 2015 ❑ See JARPA Attachment D
6g. Fair market value of the project, including materials, labor, machine rentals, etc. hel
$15,900
6h. Will any portion of the project receive federal funding? hel
• If yes, list each agency providing funds.
❑ Yes ® No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) hel
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hel
❑ Not applicable
7b. Will the project impact wetlands? hel
❑ Yes ❑ No ❑ Don't know
7c. Will the project impact wetland buffers? he[�I
JARPA Revision 2012.1 Page 6 of 14
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? hel
• If Yes,submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? hel
• If Yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? LtLeM
• If Yes,submit the plan with the JARPA package and answer 7g.
• If No, or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No ❑ Not applicable
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. hel
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below) where we can find this information in the plan. hem
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type" (sq. ft. or
category' Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland
rating forms with the JARPA package.
3Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable.
"Creation(C),Re-establishment/Rehabilitation(R),Enhancement(E),Preservation(P),Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. hem
JARPA Revision 2012.1 Page 7 of 14
I
�I
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. hei
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.)
❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hel
❑ Not applicable
The footing repair will extend no further waterward than the existing footing. Excavation work will be done with
an small excavator brought in from landward, and will use an existing single point access to the beach. Work
will be contained within a narrow area of the beach parallel to the bulkhead. Work will occur at lower tides, no
work will be performed when the area is inundated by tidal water. Filter fabric and fencing will be used as
necessary to minimize water turbidity. All materials will be brought in and staged upland of the bulkhead.
i
8b. Will your project impact a waterbody or the area around a waterbody? [hel
® Yes ❑ No
JARPA Revision 2012.1 Page 8 of 14
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? hf eid
• If Yes,submit the plan with the JARPA package and answer 8d.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ® No ❑ Not applicable
Standard best management practices for shoreline work will be followed to minimize impacts. All repairs are in
the same footprint, or further landward, than the existing concrete structures.
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g you do not need to restate your answer here. hel
N/A
8e. Summarize impact(s) to each waterbody in the table below. hem
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or
dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of
drive, etc.) placed in or waterbody
removed from directly affected
waterbody
Bulkhead footing Hood Canal Adjacent Permanent Approx. 7-8 cu. yds. 44 If
repair of concrete placed
below existing footing.
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. hel
None
JARPA Revision 2012.1 Page 9 of 14
89. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. heI
Small amount of beach gravel may be moved in order to excavate for the footings. Material will be left on the
beach. Material would be moved with excavator.
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. [help
Agency Name Contact Name Phone Most Recent
Date of Contact
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this DARPA on the Washington
Department of Ecology's 303(d) List? hel
• If Yes,list the parameter(s)below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
hftp://www.ecy.wa.gov/programstwq/303d/.
❑ Yes ® No
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? hel
• Go to http://cfi)ub.epa.gov/surf/locateAndex.cfm to help identify the HUC.
17110018
9d. What Water Resource Inventory Area Number(WRIA#) is the project in? hem
• Go to http://www.ecv.wa.gov/services/gis/maps/wria/wda.htm to find the WRIA#.
WRIA#14
JARPA Revision 2012.1 Page 10 of 14
9e. Will the in-water construction work comply with the State of Washington water quality standards for
. pY 9 q Y
turbidity? hel
• Go to http://www.ecy.wa.gov/programstwg/swgs/criteria.html for the standards.
® Yes ❑ No ❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? hel
• If you don't know, contact the local planning department.
• For more information,go to: http://www.ecy.wa.,qov/programstsea/sma/laws rules/173-26/211 designations.html.
❑ Rural ® Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? heI
• Go to http:/twww.dnr.wa.gov/BusinessPermitsrTopics/ForestPracticesApplications/Pages/fp watertvping.asm for the Forest
Practices Water Typing System.
® Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? hel
• If No, provide the name of the manual your project is designed to meet.
® Yes ❑ No
Name of manual:
9L Does the project site have known contaminated sediment? [heV
• If Yes, please describe below.
❑ Yes ® No
9j. If you know what the property was used for in the past, describe below. beid
Multi-family residential
9k. Has a cultural resource (archaeological) survey been performed on the project area? nel
• If Yes, attach it to your JARPA package.
❑ Yes ® No
JARPA Revision 2012.1 Page 11 of 14
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. nel
Puget Sound Chinook salmon
Hood Canal Summer Chum salmon
Puget Sound steelhead
Coho salmon
Bald Eagle
Pacific Herring
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. nel
Puget Sound Chinook salmon Dungeness crab
Hood Canal Summer Chum salmon Hardshell clams
Puget Sound steelhead
Coho salmon
Bald Eagle
Pacific Herring
Cut-throat trout
Harbor seal
Eelgrass
Oyster beds
Surf smelt
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.ecy.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or help(cD-ora.wa.gov.
• For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act (SEPA). (check all that apply.) hem
• For more information about SEPA, go to www.ecy.wa.gov/proGrams/sea/sepa/e-review.html.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
® A SEPA determination is pending with Mason County (lead agency). The expected decision date is
Spring 2015 .
❑ I am applying for a Fish Habitat Enhancement Exemption. (check the box below in 1 ob.) nem
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law.
JARPA Revision 2012.1 Page 12 of 14
10b. Indicate the permits you are applying for. (Check all that apply.) nel
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
® Shoreline Exemption Type (explain): Repair and Maintenance
Other city/county permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
® Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption—Attach Exemotion Form
Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife,
unless your project qualifies for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes:
❑$150 check enclosed. (Check#
Attach check made payable to Washington Department of Fish and Wildlife.
®Charge to billing account under agreement with WDFW. (Agreement# 12-1853 )
❑My project is exempt from the application fee. (Check appropriate exemption)
❑ HPA processing is conducted by applicant-funded WDFW staff.
(Agreement # )
❑ Mineral prospecting and mining.
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded with the county auditor,or other proof of current land use.)
❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012.
(HPA# )
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
JARPA Revision 2012.1 Page 13 of 14
Authorization of Agent
I hereby authorize the agent named below to act on my behalf in matters related to acquiring and
executing activities associated with a Hydraulic Project Approval (WDFW permit). I certify that I have the
authority to carry out the proposed activities and that I have the authority to grant access to the
property. I also give my consent to WDFW employees entering the property where the project is located
to inspect the project site or any work related to the project.
Application 2083
Age
Nam Steve C. Merrill (please
Busin Jesfield Construction Company,Inc. (if
Email smerrill@hctc.com
Phon 360-275-6684
Author
Name: C <- C.;jL/��i�� (ple
Business(W A)O U VV E COL) DOW IPA-Al (if
Email: hi �
Phone: � ��4 7ol c9
Signatur m14'
'/, Dat
f
If you do not want to upload this document to APPS,you need to submit this form to the following
address: