Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DDR2013-00051 - DDR Reports - 12/6/2013
• � 3aa3� -. ��l � �©ooy P6oN COGN� MASON COUNTY (360)427-9670 Shelton ext.352 DEPARTMENT OF COMMUNITY DEVELOPMENT (360)275-4467 Belfair ext. 352 BUILDING• PLANNING•FIRE MARSHAL (360)482-5269 Elma ext. 352 Mason County Bldg. III, 426 West Cedar Street 1854 PO Box 279, Shelton, WA 98584 www.co.mason.wa.us December6, 2013 TO BE KEPT IN THE PARCEL FILE Mr. William Bernier Northwest Water Systems, Inc. Post Office Box 123 Port Orchard, WA 98366 Re: DDR2013-00051 Port of Allyn—Water System Plan Dear Mr. Bernier— We received your letter and Local Government Consistency Review Checklist on July 22, 2013. On July 29, 2013 1 notified you via e-mail that this review required a $235.00 fee. As of this date we have not received a response or a payment;therefore we will close this file on or about January 6, 2014 if we do not hear from you. Thank you for your attention to this matter. Si rely, Barbara A.Adkins, AICP Director e- 2-013- 0005 '1 Planning•Management•Engineering UUtt..553��[r P.O. Box 123•Port Orchard,WA 98366.888-881-0958•360-876-0958 DATE Mason County Community Development, MS-36 c/o Barbara Adkins, Director PO Box 279 Shelton, WA 98584 Re: Port of Allyn—Water System Plan Local Government Consistency Review Checklist Dear Ms. Adkins: The Port of Allyn (DOH System ID 68790 X) has completed an update to their Water System Plan. Northwest Water Systems prepared the planning document on behalf of the Port of Allyn and seeks your review and concurrence in regard to the required Local Government Consistency Review Checklist. Please find enclosed relevant portions of the Water System Plan for your review. A copy of the DOH's Local Government Consistency Review Checklist is also enclosed. If you have any questions or need any other information, please call me at 360-876-0958, extension 107, or email bill@nwwatersystems.com. Sincerely William Bernier NORTHWEST WATER SYSTEMS, INC. enclosure ReDEI VED � 22 2t113 426%CEDAR STa Local Government Consistency Review Checklist Water System Name: Port of Allyn PWS ID: 68790 X Planning/Engineering Document Title: Water System Plan Plan Date: December 2012 Local Government with Jurisdiction: Mason County WAC 246-290-108 Consistency with local plans and regulations: Consistency with local plans and regulations applies to planning and engineering documents under WAC 246-290- 106, 246-290-107, and 246-290-110(4)(b)(ii). 1) Municipal water suppliers must include a consistency review and supporting documentation in its planning or engineering document describing how it has addressed consistency with local plans and regulations. This review must include specific elements of local plans and regulations. This review must include specific elements of local plans and regulations,as they reasonable relate to water service as determined by Department of Health (DOH). Complete the table below and see instructions on back. Local Government Consistency Statement Page(s)in Yes—No—Not Planning Applicable Document a)The water system service area is consistent with the adopted land use and Section 1.5,1.6, zoning within the applicable service area. maps b)The six-year growth proiection used to forecast water demand is consistent with the adopted city/county's population growth projections. If a different Section 2.2 growth project is used, provide an explanation of the alternative growth projection and methodology. c)Applies to cities and towns that provide water service: All water service area policies of the city or town are consistent with the utility service Not applicable extension ordinances of the city or town. d)Service area policies for new service connections are consistent with the adopted local plans and adopted development regulations of all jurisdictions Sections 1.8,1.9 with authority over the service area{City(ies),County(ies)]. e)Other relevant elements related to water supply are addressed in the water system plan, if applicable: Coordinated Water System plans, Regional Section 1.4 Wastewater plans, Reclaimed Water plans,Groundwater Area Management plans,and Capital Facilities Element of Comprehensive plans. I certify that the above statements are true to the best of my knowledge and that these specific elements are consistent with adopted local plans and development regulations. Signature Date Printed Name,Title and Jurisdiction Water System Plan For the Port of Allyn Water System 1.0 SYSTEM DESCRIPTION The Port of Allyn Water System is an existing Group A water system located in Mason County, Washington. The system serves both residential and commercial customers in the Town of Allyn. The water system is located in Section 20, Township 22, Range 1 West, W.M. The water system is owned by the Port of Allyn. The water system is currently approved for 39 connections and serves 13 connections. The potential service area includes all of the Allyn Urban Growth Area (UGA). The system currently provides service to 8 full time residences and 5 commercial connections. There are 3 Group A systems and 7 Group B systems in the UGA. Notable systems are the Allyn Shopping Center, which has 41 connections west of SR 3 and south of Lakeland Drive, the Lakeland Village system which serves 850 connections in a private community and the Sail On Inn espresso stand with 1 connection. There are also a number of privately owned exempt wells. The water system is comprised of a single drilled well which feeds directly to the distribution system. A 144,750-gallon reservoir is located at a higher elevation and "floats" on the distribution system. The distribution system is pressurized via the submersible well pump from below and by gravity from above. The submersible pump cycle is controlled by a variable speed drive. The distribution system is comprised of 2.5-inch PVC pipe to the first connection (the Port Office) and changes to 8-inch C900 routed along the roads serving the system. Eight-inch ductile iron pipe is used on steep and unstable slopes. The source and services are metered. The reservoir is located at the high point of the system at an elevation of 210 feet. The minimum distribution system elevation is 9 feet. The general topography of the area slopes down toward North Bay, which is sea level. 1.1 Ownership and Management The system is owned and operated by the Port of Allyn. A copy of the WFI providing a general description and summary of the system is included in Section 10. System Identification Water System Name: Port of Allyn Water System WSDOH ID Number: 68790 X Northwest Water Systems, Inc. -1- Port of Allyn Plaililing—Miaiageni,.,,t—Eng,neeriii; V'ater System Fia.l t ' System Ownership Name of Owner: Port of Allyn, Inc. Owner Contact: Bonnie Knight Owner Address: P. O. Box 1 Allyn, WA 98524 Owner Phone: (360) 275-2430 Operations Type of Management: Employee Contractor Contact: Stephen C. Holloway Contractor Address: P. O. Box 1 Allyn, WA 98524 Contractor Phone: (360) 490-0894 1.2 History and Background History The Port of Allyn Water System is owned by the Port of Allyn. The system has existed since 1960 as either a Group B water system or a TNC Group A system. The water system facilities have been expanded significantly since the last Water System Plan was approved in 2003. The expansion includes installation of a 144,750 gallon holding tank (2007) extension of 8 inch mains (approximately 1,2001f in 2007), and approval of water rights for an additional 555 gpm and 300 acre feet of water (approved in 2010 by DOE) to serve the needs of the Allyn UGA. Sand screens were designed and installed into the bottom of the existing well in 2007. The management duties for the system are performed by Stephen Holloway an employee of the Port. He is a certified Water Distribution Manager 3, a Cross Connection Specialist, and WTPO 1. The operator is responsible for sampling, maintenance and emergency response. Some sampling and maintenance is provided by Belfair Water District as a contract operation. Water rights were obtained in 1984 for group domestic supply in the amount of 65 gpm, and 14 acre-feet per year. Additional water rights for 555 gpm and 300 acre-feet per year were obtained in 2010. Geography The well is located near North Bay at an elevation of 9 feet. The reservoir is located at the high point of the system at 210 feet of elevation. Pressures at all existing connections to the system are well above the 30 psi threshold; however, additional pressure may be needed if new connections are established at higher elevations. The area slopes down toward North Bay, which is at sea level. Supporting hydraulic analyses showing the effects of the elevation and anticipated system flows are available in the Capacity Analysis. Northwest Water Systems, Inc. -2- Port of Allyn Pla�aiing— _Aanageiilent—Lagineerij:g vVatei .)yAenl P;all w 1.3 Inventory of Existing Facilities A more detailed inventory and assessment is included in Section 10. The following major components are present: Well and pump A 10'by 10'Pumphouse Source Meter 144,750 gallon reservoir Five Pressure Tanks (not currently in use) Transducer Distribution System/Isolation ValvesBlow-offsiHydrants There are no interties with other water systems, existing or proposed. Interties will not be allowed in the future. A project report is required detailing the upgrades and improvements required for the system to serve connections above the 30 psi line or where water main extensions are needed into the upper pressure zone. 1.4 Related Plans The 2005 Mason County Comprehensive plan was reviewed for consistency with zoning, and population estimates. The Comprehensive plan does identify the water system as being located within the UGA of the Town of Allyn. The Comprehensive Plan's Future Land Use map does not identify any change in usage for the area over the 20-year planning horizon. Adjacent Purveyor Comments and Resolutions The Lakeland Village Water System, The Allyn Shopping Center, and the Allyn shop (espresso stand) are the three Group A water systems within the UGA and are illustrated on a map located later in this section. Letters have been sent to the contacts for these water systems as identified on their WFI to allow them to review this WSP and provide comments. A copy of this letter is enclosed in the appendices. 1.5 Existing Service Area Characteristics The existing Retail Service Area for the Port of Allyn system includes properties east of Lakeland Village, and to the north and south of the storage tank within the Allyn UGA. Immediate hook-ups can be provided to properties adjacent to or near the existing water main. Properties further away can be serviced with the extension of water mains, and in some cases a booster pump for increased pressure. The system is currently approved for 39 connections but is capable of serving 223 connections with no modifications to source or storage capacity. A map of the existing service area is found on the following pages. A map of the proposed Service Area is found on the following pages. Based on zoning densities within the UGA, there could be as many as 1,500 connections outside of Lakeland Village (private water system) by the year 2030 (water rights were based on 20 Northwest Water Systems, Inc. -3- Port of Allyn fanning- Manat cment— 3ngiuL,.ciiig Water Systen, Plan year projection for the UGA). Approximately 85 lots are currently served by private wells and small water systems. This leaves over 1,400 additional connections that could be served by the Port of Allyn Water System. It is likely that the area will not be developed to the maximum density and a total of 1,100 connections is used for the build- out prediction for this system. There are approximately 200 potential service connections adjacent to or very near to the existing water mains. Mason County has the following zoning designations for Allyn UGA: Highway Commercial, Public Open Space, Single Family Residential, Residential Platted, Residential Recreational, Multi-Family Medium Density Residential, Multi-Family High Density Residential, and Village Commercial. Future zoning is anticipated to remain unchanged for the entire 20 year planning period. Definitions for zoning designations are located in Chapter 10. The entire service area drains into North Bay of Case Inlet. 1.6 Future Service Area Consistent with Port Resolutions, the future service area is the entire Allyn UGA, excluding Lakeland Village. The majority of the service area is in Section 20, Township 22N, Range 1 West, W.M. as depicted in the Service area map found on the following pages. Larger maps are available in Chapter 10. 1.7 Service Area Agreements This system is not within an area governed by the Public Water System Coordination Act. Washington Water Service Company is the owner of the Allyn Shopping Center Water System and will remain within its existing boundaries. When Washington Water Service Company is no longer able or willing to provide service to their existing connections it is anticipated that they will be absorbed by the Port of Allyn Water System. Northwest Water Systems, Inc. 4- Port of Allyn Planni,.g—MauU-genici,, —Lngii ,;ering 'v',.,c, SyA,_,n Pla,i Figure 1: Vicinity Map m 0 G 00 �Y A � 9 _p, O �F' W �Eapa PO Wa �o S � N �a •pWa. AY.pR �n fw/�.figT. �� Jy 0 O s 3 x m N m i c 5 0 o $ x c rc Q D S 3 ,t�orii � d p o 3 O 2 Q V V Northwest Water Systems, Inc. -5- Port of Allyn Plaiu;iag—Maitagen.c,.t—Engii,eerhig Wu' er System Pla;, Figure 2: Existing and Future Retail Service Area e0 Vt 1-- 1 J r 1 I� Allyn Urban Growth Area Zoning Map Legend �N,e IV�Bardiry I.M-Y.ghwa,Cemnwreui eroe.aa er Wwn c:utry cl5 onarmca un,np 0-fty Obtekb -ms 7.m 0—Sooee Rajel F:rr Ayn.7 Y4F�:uy_4a)Ol.n.i �T 1MP-WR Hom�pgrYr �R.1.5.ry(F FonT/RMEwOeI RiNeafmW 011lYAp1 -•• Ramp+a VeliWusry4�d593 •�y�R-P�ifcF�GY,O.ab, �R-1F-RukmtlY FlaYd •r...O.••,._..,...._ NI?�7/ t M'/AMpr•.*N6 Il:aalt:Rue-aa ZW11 CM RQ�LdI hmO/WQun OenNROfWnW ta•.nJidn+aCw m+vs hem VWtm Ceu•.r�Rrr.y FY _ate .tee.�:...�r..�,••.w.••`r D l ftbm .0-t i&UrA =1t-3 S00 1,000 FrN/Nlpn DrnM RwMnml +a�....s v....a+a.r......�:.��:: u�..t�'..e . �BF-Bun�f�Pak nYC.Vaep.Co*mresl �a�..a:,..wr�r.w.�as`.......=. 0 �000 ..w..r�wa..�.,._.e..-..s.., Northwest Water Systems, Inc. -6- Port of Allyn Plar,;,;,,g—Ma.,agemci.,—Eng;l,cering ` v,.icr Syst,L:m Pla„ 1 1.8 Service Area Policies Duty to Serve Municipal water law requires that municipal water suppliers such as Port of Allyn Water System anticipates becoming,have a"duty to serve" within its service area boundaries. The system must have sufficient capacity to provide water to new services. The system (nesting stand-by storage with fireflow) has the capacity to serve the entire area adjacent to existing water mains. The addition of a new well source will allow the system to serve the entire Allyn UGA. The system must provide service that is consistent with local plans. This WSP contains the information necessary to ensure that the system is providing the service in accordance with local plans. The system must have sufficient water rights to provide service. The Water Rights Self- Assessment Forms located in Chapter 4 show that the system has sufficient water rights to meet the third criteria through build-out. The water right stipulates that all new hookups to the Port of Allyn's water system are required to be served by the North Bay- Case Inlet Water Reclamation Facility, per Mason County Code. Finally, the system must provide service in a timely and reasonable manner. The system is able to meet this requirement for the majority of requests for service. For connections at higher elevations or away from the existing water mains, pressure tanks and pumps will be used to facilitate connections. With this WSP the system will be able to extend the water mains using the water main exemption. A Project Report will be required for the design and installation of a booster station when the system has expanded to the point of requiring it. The Port of Allyn will issue a determination of water availability within 30 days of request. For new connections unable to serve, Port of Allyn will own or operate the new system with an agreement to consolidate when possible. The procedure followed by Port of Allyn for service requests is titled "Process to Address New Requests for Service" and is located in the appendices. These instructions are included for the system to have in place a simple step by step program to address service requests. Wholesaling and Water Wheeling Wholesaling of water and water wheeling will not be allowed. Annexation The water system will serve the entire Allyn UGA. Should properties wish to be served outside the UGA, annexation will serve as a term of providing service. Direct Connection and Satellite Systems No service will be provided to Satellite Systems. All direct connection and growth will be provided by the Port of Allyn. Northwest Water Systems, Inc. -7- Port of Allyn Plaim,-ig— 114a,.agen,c;lt —Eng;,ieering 'VV"ter Sys�,,M Plait Design and Performance Standards All design and construction shall be completed under the direction of the owner. A project report detailing design and construction standards shall be submitted for all significant additions and upgrades to the system. Standards and construction details for pipe replacement, water main extensions, and new service connection details are included in Section 7. Outside Customers and Improvement Districts The system will not serve any outside customers or districts. The system will not contract to provide fireflow for other Class A systems. Urban Growth Area The system will serve the entire UGA. Late-Comer Agreements Ports are not authorized to enter into `Latecomer' agreements. Oversizing The existing distribution system is capable of providing fireflow. Future expansion in the distribution system will also be sized to meet fireflow demands, and full anticipated build-out. Cross-Connection Control Program The cross-connection control program has been adopted by the Port of Allyn Board of Commissioners. A cross connection control specialist will be retained by the Port of Allyn. Additional information regarding Cross Connection is included in Section 10. Extension No extensions are proposed at this time; however, if an extension becomes desirable, the extension of the system will be completed only under the direction of the Port of Allyn. Costs associated with an extension will generally be paid for by the future development except in the case that the Port determines it is in the best interest of the Port to extend lines to provide service to underserved areas. 1.7 Satellite Management Currently the system is managed by Stephen Holloway, WDM 3, CCS, WTPO 1. Port of Allyn does not have a satellite management agency. In addition the Port of Allyn does not provide satellite management services. 1.8 Conditions of Service Purveyor Responsibilities The purveyor shall supply a reliable and safe supply of potable water in accordance with all State, local, and Federal requirements to all customers meeting their responsibilities. Customer Responsibilities The only conditions of service are that customers (and potential customers) must: Northwest Water Systems, Inc. -8- Port of Allyn Planning—Management—Engineering Water System Plan 1. Receive water on property within the service area 2. Pay all applicable utility bills and fees 3. Adhere to all system policies (including conservation and cross connection) 4. Must be serviced by the North Bay-Case Inlet Water Reclamation Facility Connection Fee Schedule Future additions shall be charged connection fees to cover the cost of installation of service meters and part of any water main extension. New services are estimated to be up to 50 new connections per year based on service to properties that are zoned medium or high density over the next few years. This is difficult to project as this type of development is affected by the general economic climate. As the town develops we anticipate as many as 50 connections in any given year for a master planned development. In the past the Port of Allyn has had requests for 18, 20 and 48 connections from different developers which the system was not able to serve due to lack of water rights and infrastructure (2001- 2003) Service may be disconnected for non-payment or violation of bylaws or protective covenants. A $50.00 reconnection fee is charged after disconnection. A $50.00 lien fee, and a separate $50.00 lien release fee are charged if liens become necessary. Meter and Materials Specifications Currently the system has service meters. All new connections shall have service meters installed during connection. Service Meters shall be 5/8" Badger M25 or equivalent water meters measuring in cubic feet mounted on meter setters and housed in meter boxes according to the details included in Section 7. Consent Agreements By accepting service, the customer agrees to grant unlimited access at reasonable times within the utility easements held by the water system to complete any and all necessary maintenance, repairs, and inspections. The customer's private property must also be made available for inspection for cross- connections or other potential hazards associated with the water system after legal notice is given as documented in the cross connection control program. Access to private property may be denied if the customer is willing to install the proper backflow prevention equipment. Access to private property is also granted in the event of a public health emergency related to that property. Cross Connection Control Requirements Customers must comply with the Cross Connection Control Program in order to receive service. The cross connection control program is outlined in Section 10 of the Water System Plan and is available to consumers upon request. Northwest Water Systems, Inc. -9- Port of Allyn Planiii,.g— Ma;,agenici,,— Engi,,cering W.11.Ci SystL,n Plan 10/17/12 Mason County Map Output Pape Port of Allyn Vicinity Map S r� �RpR ERN � O EFNRW i ��s.a"y E9T � "may W a Y o a , r. E L•,� V�Py � ORV�ST r, E� Q m. 'F m o 5 g 3, z m P t �. w� z k ' a m W .'9 frj K JJO W 2 2 DISCLAIMER AND LIMITATION OF LIABILITY: The data used to make this map have been tested for accuracy,and every effort has been made to ensum that these data are timely,accurate and reliable.However,Mason County makes no LEGEND guarantee or warranty to its accuracy as to labeling,dimensions,or placement or location of any map features contained herein.The boundaries depicted by these data one,approximate, F r'M5 FOdow l antis and am not necessarily accurate to surveying or engineering standards,and are intended for informational purposes only.Masan County does not assume any legal liability or Ntglwrays City of Shelpsn responsibility arising from the use ofthis map in a mama not intended by Mason County. Frvom 8 Stroams [� county Boundary 1Cw j In no event shall Mason County be liable for direct,indirect,incidental,consequential, special,or tort damages of any kind,including,but not limited to,loss ofanticipated profits p4rcAls Cornrmssiorwr Dstrlcts or benefits arising from use ofor reliance on the information contained herein �4cbons Lakes 0200 -Mason County GIS Townships S Puget Sound 8 Mut:r LaltOS 100 W.Public Works Dr Shelton,WA98584 Northwest Water Systems, Inc. -11- Port of Allyn "lannii.r,-Management -Engine,;ring W.L,. r Systeii.Plan JEFFERSON COUNTY fr/r Masan County Eldon- larsnr couwr; (I Pont D�s1U1 clSs \ +L ' to rs � � Port Districts /*V Roads Lilliwau a n Shelton Highways �o wai Hoodspott!__ry Shelton City Lirnits Grapeview County Boundaries - `-i;,- Part nr.Ho7ds4tart � - commssron�.ommas !�� - 11e1foir ( Dewattn V Allyn Hdadspart ri .d +� c,, r--. W• H y•r r% Tabuya Ally, " S W _ lrraar, 0 2 d G A Mond Svct<h p tll (,land 1 � d ° Afatlodr Y Produced By:Meson County GIS Department _.W Project Flle:PorLDlstricls_17e72mxd sum, v�0s o r-~ 1 i s'ts Publication Dote:411312D11 "SHeltort Part at Shelton .y Harstlne lstond Met)Onto_counas County Boundaries and Hydrology we from the WA Dept of 3 t _ e Natural Roseurcos. Port Districts afe from the Mason County f, m n i ova Auditor re s Office.Highways,Roads,Shahan City Boundary a ss from Mason County GIS. DISCLAIMERAND LMRATION OF LIABILffY The data used to moke this map have boon tested for aasrrory, and every effort has been made to ensure that these data are bmsly,accurate and reliable.However.Mason County makes no guarantee or womanly to Its necura y as to labeling,dimensions,or �.e placement or location of any map loatums contained heroin.The nwdrs Hoy, boundwas depicted by those data are approximate,and we not 'rat• a ..a. "ar 101 Word necoaonnty acoumte to aumoying orenglnmrin0 st ndardo.Th000 data ere Intended for Informational purposes and should net be Toylar squ-(a considered authoritative for engineering,navigational,legal and Qiand otter slto-spoclflc uses.Mason County does not assume any legal Ilabillly or responsibility wising hem the use of this map In a manner not Intended by Meson County.In no wont shall Mason County be F rtoq; saps liable for direct.Indirect,im4wmtal,consequential special.or tort ^' 8' Including, to.less of en 4P taf profits orr benohbe ising from use dof or Interim on the Port District Information Infmmegon contained heroin.The burden for dotermining fitness for use lies entirety with the user and the use I,solely responsible for The Port of Hoodsport and Port of Shelton do not have understanding the amurecy[Imitation of the Information contolnad Individual port commissioner districts.All commissioners In In this crop. GRAYS HARBOR COUNTY those part districts are elected at-large. THURSTON COUNTY I — :r ::.....:..... .............. fMID A aD ® 00 ......................... .......................... .......................... a .......... ...................... ............................. `ii3lit}•r,IR •5::::::::::::::::.i..f,�e�•"`'!i!'! iif f:lfiiiPvf;n..E,u:yaq:.if:fF: > ;. _ tr ff i q�7 - ial1 f =-gill r / R-1 f '! M ..... ...... ::::•:::;::::: r PNilE'i'f s?'{i.... �• rs!9r}} "(C•Si?fflF,, i - fy1w %!:�:: uu:: I �Ig. - !'4 :E it rL Ifa}!i.i�%}i•%s ri S r r't f'��,%,tG %i?�lltif��;j nE•`s,�i lrn ;urj' %t•tli:• j;!fi'l:ir ist 7 I t ,t la,r :i:i!iiim:f�?fbh�11 I! i 2f, # , f Yh �� u s r°f 'ifs- :uIf°.:::..'.•. °e ,•!rq rlil..:iS..... '�:u;;u;.a..,.%:f'n::..•t;...I:,:fr•. n sl�i;�1fg lffuf,;;uia:f;lipi,.r:gl,,rq.u.,.:L4 f:;�. •. �•�i.1�,,i'..• fir:/ r r� ".•'I'%ii�:.•.,:r•.;°�:fP'riifilu Si•: ,:-.r'r.,i;:d. //✓ �� �Vc J~ \ R-1 i Anderson Lake �� R-3Zz r County Commissioners _. Pays" Number L rldaD.11,91 Dale j -'�/aa/o Date ; R-n-oy j Cral agher,,tsNet3 Dale� -Rebecca S.Rogers,Cledr'of the Board Date i Allyn Urban Growth Area Zoning Map Legend Q Allyn UGA Boundary HC-Higtnray Commercial .amd By Mason County GlS Department Zoning Overlay Districts -POS-Public Open Space , nt File:AOyn-Zoning_FIna6Map u[yD7.msd MHP-Moble Home Overlay R-1-Single Family Residential alion Date:07/1212007 UMXMn s.vaUNITY srrmr:u.vncx map was produced usingArcGIS 9.2 PF-Public Fa6liy Overlay OR-1P-Residential Platted �T-TouristCommercialOveriay R-1R-ResidentialRecreational "'O"�z: r•=s°'�'--%"I� c-�.u^�'F==^^� Mao Oats Sources _L,t 1 t ,:-,.^r;m<c rr tsa;r_,r q:a:ra<•—.,r�za Hydro'.ogy is from the NA Department of Natural Resources Zoning �i'ti'sx.=e��ltr,d,.m==—a,�.,a=rm:=-:mp R-2-Multi FamTy Medium Density Residential ae �n_z an- :ceyvu`o:�ry,, =a-c,kor� Zoning information comes from the Mason County Planning - _.,._,._.:s,� ::r,o,,;=�•,u;_ rcc,;<.�,,:,.,r�_�r:„j ,^ Department No Zoning or 0ulside UGA R-3-Multi Familytfi hDensi Residential n-4�%%�'=%�='rn-r,:: r.x„<rrt.ra:,cu,.:, =r•s> 9 ry •r•�c.a m�,r,:»,u:,:ro4,_.c,em�:�-cu_.m.«oa,,1 BP-Business P,rk .^u,,,a`•a ur.";mr;,o-:�,w_a:c,r'=„p;w�s•e==u 0 500 1,000 2,000 ��-Vltage Commercial ticmy>4r."r Feet 10125 12 Mason County Map Output Page -- - - - ---Port. of -- - Yn _ h _ - °� / + -V o / J w A / i °111 a �� / %Q Fy r410106pV 1 W AF,k44110 Olt N � r DISCLADvIER AND LDWATION OF LIABILrrY: The data used to make this map have been tested for aceuracy,and every efiurt has been made to ensure that these data are timely,accurate and reliable.However,Mason County makes no LEGEND guarantee or warranty to its accuracy as to labeling,dimensions,or placement or location of any map features contained herein.The boundaries depicted by these data are approximate, R,1.I and are not necessarily accurate to surveying or engineering standards,and are intended fDr inbrmational purposes only.Mason County does not assume any legal liability or ' Mrgi •a.�;� City of$h-1t,n responsibility arising from the use ofthis map in a manner not intended by Mason County. In no event shall Mason County be liable for direct,indirect,incidental,consequential, �rxnr ti lrr•3Mr:: °-n"wily F:,rtnQAf {!:FJF';r special,or tort damages ofany kind,including,but not limited to,loss ofanticipated profits or benefits arising from use ofor reliance on the information contained herein i •=rctlens ;•. Ices O 2009-Mason County GIS Trw mih G� 1=:Uri_!:3nuriw S t'id�+:r L�i Ls'3 100 W.Public Works Dr Shelton,WA 98584 All connections at a higher elevation than the 140' contour line will require a booster station. The gre�:n line represents the boundary of the Lakeland Village Water System. ■ ir.Ix • r +14IT ` " ` \ \ a All, I 1� � V SITE INFORMATION PROVIDED BY:THE CLIENT AND BY SITE INSPECTION o-- SERVICE CONNECTION a-- BLOW-OFF >a ISOLATION VALVE THIS IS NOT A SURVEY.PROPERTY LINES AND ELEVATIONS SHOWN ARE BASED UPON THE AVAILABLE INFORMATION AND ARE APPROXIMATE ONLY. DISTURBANCE OF EXISTING SURVEY MONUMENTS IS A GROSS MISDEMEANOR UNDER RCW 58.04.015 N� m 0 a m w O= a� Y O O m< y m Z <� �o �cz WgpFST � m .Y h ^C EeRRNgRTST 07 4 X o < m z m p --i r FOR cm T m UM ST \ \ v rr x O� / o m CgkF� Np�R FVgNS ST w S ti O .Y HER WOOD y aY o� �C OMPEVIEW LOOP w� SYSTEM OWNER DRAWN PORT OF ALLYN PORT OF ALLYN CHECKED BY; FILE NO.120403 FILENAME SITE SHEET ND. REVISION scA E DESCRIPTION DATE DATE AUG UST 9, 2012 1" = 600' NORTHWEST WATER SYSTEMS, INC. DESIGN-CONSULTING-MANAGEMENT P.O.BOX 123 PORT ORCHARD,WA 98366 - (360)876-0958 2.0 BASIC PLANNING DATA 2.1 Current Population and Water Use The current population of the Port of Allyn Water System is 16 fulltime residents and approximately 5,000 temporary and non-residential users per month in the summer; and 500 temporary and non-residential users in non-summer months. Meter data is available for each connection with residential use being twice the commercial usage. Average Daily Demand (ADD) for the residential connections was calculated to be 106 gpd per connection. The ADD for the commercial connections was only 55 gpd per connection. The system is then evaluated based on 1 ERU per full time household. It is likely that future connections will have similar usage patterns. Future use is zoned for higher densities, therefore it is likely that future ADD will be even less than current ADD. 2.2 Projected Population and Water Use Water use is residential, commercial, and recreational (parks) in nature, with the exception of uses associated with operation of the system such as flushing. Analysis of the water quality data indicates that minimal flushing is necessary. The system submitted a revised water system plan in 2003. At that time the system was approved for 39 connections. Since that time, 1 residential and 3 commercial connections have been added. It is expected that this will not represent "typical" growth rate for the system. It is expected that the Town of Allyn will experience an increase in commercial growth and corresponding population size. Projected growth is predicted to increase over the next 5 years to average 10 connections per year and continue to increase annually to full build out. This projected growth is based the Port of Allyn's internal studies and surveys of local developers and development trends. Table 1: Projected Population Commercial Residential Current 5 8 6-year 15 30 20- ear 100 900 Build-out 100 1,000 Water Demand Forecasting Two years of service meter data was analyzed to develop the system usage model. This analysis indicates that the system has an Average Daily Demand (ADD) of 106 gpd per ERU. This is consistent with the demographics of the system, which has small lots with minimal out-door watering. Northwest Water Systems, Inc. -12- Port of Allyn .Tannin,,-Manageme«t -Engin.,;,ring Wai:,Y Syste'l, Plan r The maximum month's average demand (MMAD) was determined to be 246 gpd per connection. The standard 1.7 multiplier for determining Maximum Daily Demand (MDD) for systems in western Washington was used. MDD is therefore 418 gpd/ERU. In summary the usage characteristics used in the analysis of the system are: ADD: 106 gpd MMAD: 246 gpd MDD: 418 gpd Anticipated Growth: It is anticipated that an approved Port of Allyn Water System will provide a catalyst for economic stimulation and growth in the community. It is assumed that all new connections will be divided between full time residences and commercial connections at a rate of 7 residences per commercial connection. Table 2 shows the projected growth in services, flow requirements, and annual use for the community over the next 20 years. Table 2: Projected Water Use ERU's pHD Annual (acftl ) Current 13 29.3 3.6 6-year 38 57.2 12.4 20-year 950 524.5 261.8 Build-out 1,050 571.0 286.4 Commercial connections equal 0.5 ERU's each. Northwest Water Systems, Inc. -13- Port of Allyn "lanni;i.—Mana6emenL - Engin,.cring Wat_. Systeii Plai; r 0 W W~ W Z Y T 10 YEAR m oZ Z ¢w i oW OF 0 �7d. >a 2� awZ / 5 YEAR \ a Z z W<F / Z J FN LL� N°O3 am o 9F aNZ� \ WELL AND So ¢ 3g pzw� 1 YEAR PUMPHOUSE i y m N a p o ELEV.9' µtµtI I 1 Hiaa u)0 O O \ 1 g Ewa a 1 / 300'2.5"PVC TO FIRST CONNECTION / REMAINDER OF DISTRIBUTION \ NODE 1 / SYSTEM IS 8"PVC LEV.14' / O E O EL V. 8' NODE3 21 N E7 NO LEV.138 EV.83' N D 4 LEV. EV. 12 ' RESERVOIR ELEV.210' O CIRCLED LETTERS ARE COLIFORM MONITORING SAMPLE SITES BYBiEM OWNER DRAWN BY: PORT OF ALLYN PORT OF ALLYN CHECKED BY: FLE NO. 120403 FILE NAME SITE SHEET NO. REVISION DE9CRPTION DATE DATE OCTOBER 17,2012 BDALE 1" = 300' NORTHWEST WATER SYSTEMS, INC. DESIGN-CONSLILTING-MANAGEMENT P.O.BOX 123 PORT ORCHARD,WA 98366 (361,)876-0958