Loading...
HomeMy WebLinkAboutMIS95-0945 Final Inspection - MIS Permit / Conditions - 12/5/1995 MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 M 11,54 C F L— L_ A P4 E C3 U4—::; P E R M I FOR INSPECTIONS CALL 427-9670 MIS95-0945 PARCEL t322325220011 PL.A i :UNPLO 2.0 DIV t BLK : 20 LOT t JOB ADDRESS : E 211 PINE ST UNION APPLICANTt DAVID JOHNSON 898-2310 OWNER t DAVID R JOHNSON 898--2310 LEGAL : 01101-GRAYS 1AINON 1 VC11 AND NLI(t 2! LOT 11-12 E 211 PINE ST PROJECT DESCRIPTIONt FINAL ON BUILDING CONSTRUCTED IN 1962 LIF& OAJ PROJECT LOCATION : GO TO 5TH. TURN LEFT . GO TO TWO DIRT ROADS TO THE I.EFT AND TURN LEFT AT UNION COMMUNITY PARK . GO UP HILL . MOBILE IS ON THE RIGHT AT THE TOP OF THE HILL PROJECT NOTES : .. TYPE AMOUNT BY DATE: RECEIPT PRMT 25 .00 NJP 12/05/95 40874 TOTAL t 25 .00 OYINFR AG \•Jt ____..� _.� DATE" -- NIS PINT, rev, 04101192 COMPLIANCE TO ATTACHED CONDITIONS IS RE61)IRED CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by PLUMBING date by OTHER Groundwork date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date ( �y date by I I i MASON COUNTY Mason County Bldg. III 426 W. Cedar I RO. Box 186 Shelton, Washington 98584 I PERMIT- Case No . , MIS95--0945 Fort DAV I D R JOHNSON Page : 1 1 ) PURSUANT TO 1991 UNIFORM BUILDING CODE: , SECTION ; 085 ( C ) AND SECTION 513 , ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR POAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A RE1NSPECT1ON FEE , RASED ON HATES IN TABLE 3A OF THE 1991 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS . 4 I CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date FRAMING by date by date by Walls FIRE DEPT. date by date by PLUMBING date by Attic OTHER Groundwork date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by I I I I I l