Loading...
HomeMy WebLinkAboutCOM2019-00097 ATM - COM Application - 8/8/2019 MASON COUNTY COMMUNITY SERVICES- Permit No: Cd'►�11 (�V 'DUB 41"l PERMIT ASSISTANCE CENTER: •BUILDING•PLANNING.PUBLIC HEALTH.FIRE MARSHAL 515 W.Alder street,Shelton,WA 98584 Phone Shelton:(360)427-9670 ext.352.Fax:(360)427-7798 Phone Belfair.(360)275.4467•Phone Elma:(360)482-5269 BUILDING PERMIT APPLICATION �"`' � PROPERTY OWNER INFOR;441STION: CONTRACTOR INFORMATION: ALLYNVIEW PARTNERS,WASHINGTON LLC l) NAME: TENANT IMPPC«DVENT: ,i•Tcr,r DnN: I f�a,u,vsr. TIM RYAN COR'STRUCTiON' MAILMO ADEIPUESS: ell,):n:A,RPSN n VEM")r A I:T^ :r�1�?rrc: 13207 oT,i �.i! E STE A J ' ✓. nnv�.i.c .��C CITY: BRE?;E?TO:d qm rn. ..'. ?*n; 23,',37 {'T�r:t'OvLSu: STATN,•WA 7TP- 98370 JIV Aid , o PIIONF#1. KITSAP BANK: LARRY GROHN 360-377-8773 PHON'':360''?JC^C7 _ �tpLer 1 PHONE#1 FN1M.:DANDTIMRYANCONSTRUCTION.COM EMAIL. LGROHN&KITSAPBANK COM L&I RI-0 q FXP 1 ! — i PRINIAR. CONTACT: GIAWER❑ CONTRACTOR❑ OTHEP Z NAME,KURT NELS N-RiCS FERGUS(Vii-LER EMAii, KN LGONCF—, ;FCi'.COM, MAILlNi.iiLTi!Rfi: 275 FIFTH STREET SUITE 100 _ CIT% BREMERTON STATE WA ?►? 98337 PHONE 360-362-1978 CF,!L' PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number; 1=05072009 —ZONING URBAN GROWTH AREA LEGAL DESCRIPTION(Abbreviatec)INT E LAKELAND DR AND E WA 3 FIRE rlSTPlC T 5 SITE ADDRESS CITY ALLYN,WA DIRECTIONS TO SITE ADDRESS -- I IS THE PROJECT Wfi'HIN 3o0 FT OF SLOPE(S)GREATER THAN 14%: YES❑ NO fA IS PROPERTY WITEHIV 200 Ff OF THE FOLLOWING: r ;tick al!that apFt;)�' SALTWATER E] LAKE© RIVER/CREEK E POND O WETLANI?® SEASONAL RUNOFF® STREAM® —I{ i TYPE OF WORK: NEW E ADDITION❑ ALTERATION❑ REPAIR❑ OTHER n ------------------------ USE OF STRUCTURE(Residence,Game,Co�xlalBldg,Dc) DRIVE UP TELLER MACHINE TO REPLACE EXIST WALK UP UNIT IS USE: PRIMARY ® SEASONAL❑ NUMBER OF BEDROOMS._0_ NUMBER OF BATHROOMS__Q__i HEATED STRUCT'!-Rr'% YFS(Wh de Btdg)❑ YFS(Px if!in-f8ld_,)[] N(3'r•-9i DESCRIBE WORK REMOTE DRIVE UP INTERACTIVE TELLER MACHINE TO REPLACE EXIST WALKUP UNIT-NOT OCCUPIED I SQUARE FOOT_ GE- I ST FLOOR 33 _ sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.ft. f DECK sq.ft. COVERED DECK sq.ft. STORAGE. sq.ft OTHER sq.ft. GARAGE sq.ft. Attached❑ Detached❑ CARPORT sq.ft. Attached❑ Detached❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED* MAKE MODEL. YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER ENVIRONMENTAL HEALTH: SEWAGEISEWER SOURCE: SEPTIC L) SEWER❑ / NEW❑ EXISTING❑ PLUMBING IN STRUCTURE? YES❑ NO(Pg Yyes,attach completed Water Adequacy Form PERIMETERNOUNDATION DRAINS PROPOSED? YES❑ NO® EXISTING SQ.FP.._ EXISTING BEDROOMS NA PROPOSED BEDROOMS NA TOTAL BEDROOMS NA OWNER acknowledges that suLmission of inaccurate information may result in a V.W r:.A order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This pernitlapplication becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CO INUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMI PPLICATI 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON COUNTY CODE 14.08.42) X Signature of (MMqLTne stoned by the OWNER) Date DEPARTMENTAL REVIEW AP ROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL PUBLIC HEALTH 10/1/2019 RE:Kitsap Bank F} Reply ® Delete Junk ••• X RE: Kitsap Bank Kurt Nelson <knelson@rfmarch.com> Reply Tue 10/1/2019 11:28 AM To: Ariane Paysse Cc: Hope Zorrozua <HZorrozua@rfmarch.com> Inbox Label: MasonCounty(3 months) Expires:12/30/2019 11:28 AM Hello Ariane, To the best of my recollection, the construction cost estimate that we used to calculate the plan review fee was $150,000. If the calculation does not match this amount then please give me a call so that we can discuss. Thank you very much! KURT NELSON Architect Building Community for over 30 Years RICE FERGUS MILLER 275 Fifth Street,Suite 100, Bremerton WA 98337 rfmarch.com O 360-377-8773 D 360-362-1878 Click Here for Confidentiality Notice&Full Copyright Disclosure From: Hope Zorrozua <HZorrozua@rfmarch.com> Sent:Tuesday, October 1, 2019 10:24 AM To: Kurt Nelson <knelson@rfmarch.com> Subject: FW: Kitsap Bank Can you respond to Ariane please? Thank you, Hope From: Ariane Paysse<ArianeP@co.mason.wa.us> Sent:Tuesday, October 01, 2019 10:20 AM To: Hope Zorrozua <HZorrozua@rfmarch.com> Subject: Kitsap Bank hftps://owa.co.mason.wa.us/owa/projection.aspx 1/2 10/1/2019 RE:Kitsap Bank Reply I V Delete Junk I v X received the fee total did you provide someone with a project bid? What is the bid for the project? Ariane M. Paysse, Permit Specialist MCCS, Permit Assistance Center 615 W Alder St Shelton, WA.98584-0186 (360)427-9670 Ext 355 or 193(Front Counter) https://owa.co.mason.wa.us/owa/projection.aspx 2/2 10/9/2019 https://owa.co.mason.wa.us/owa/projection.aspx Reply ® Delete Junk ••• - X FW: Parking at Allyn Center AFL Larry Grohn <Igrohn@kitsapbank.com> Reply Fri 10/4/2019 4:40 PM To: Kurt Nelson <knelson@rFinarch.com> This message was sent securely using ZV Kurt, Please see the note below from one of the Owners of the Allyn shopping Center property. Kathie Fogle.The other owner is Tom Hamilton. Hopefully this is what you needed.Than you. Larry Larry Grohn Kitsap .ft SVP,Corporate Real Estate Director p 360.876.0237 f 360.876.7885 ah 619 Bay Street Port Orchard,WA 98366 From: Kathie Fogle <kauaikath@yahoo.com> Sent: Friday, October 4, 2019 4:33 PM To: Larry Grohn <lgrohn@kitsapbank.com> Subject: Parking at Allyn Center EXTERNAL EMAIL ALERT! UNKNOWN SENDER? UNEXPECTED EMAIL? - Do not open attachments. Do not click links. When in doubt contact the sender by_phone before taking action or use the Phish Alert button to report any questionable email. Dear Larry, I am writing this email at your request to be provided to the appropriate Mason County Department. Please be advised that the Allyn Center is owned by Allynview Partners, L.L.C. All parking in the shopping center is shared by all tenants. There is no assigned parking,' Regards. Kathleen M. Fogle, Partner hftps://owa.co.mason.wa.us/owa/projection.aspx 1/2 10/9/2019 https://owa.co.mason.wa.us/owa/projection.aspx Reply v Delete Junk ••• x ***PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS EMAIL.*** This message(including any attachments)contains confidential information intended for a specific individual and purpose,and is protected by law.If you are not the intended recipient,please:(i)delete the message and all copies;(ii)do not disclose,copy,distribute or use the message in any manner,and(iii)notify the sender immediately.In addition,please be aware that any message addressed to our domain is subject to archiving and review by persons other than the intended recipient.The above does not represent an electronic signature for the purposes of E-SIGN. When sending sensitive financial information to me, please use the Zix Secure Message Center.This free service uses state-of-the-art encryption technology to ensure that both the email and all attachments are fully protected.To access Zix click here; httpS:Hsecure-kitsapbank.com. To send me documents please visit our Secure File Transfer Site at; https:Hsecureupload.kitsapbank.com/fileup.aspx. This message was secured by Zix°. https://owa.co.mason.wa.us/owa/projection.aspx 2/2 vj nuw mcuuwtu • SITE IS LAID OUT WITH SHARED PARKING IN UPPER LOT FOR ENTIRE DEVELOPMENT. EXISTING PARKING COUNT FOR THE BUILDING WITH UPPER AND LOWER LOT SPACES: UPPER LOT: 10 SPACES ALONG WEST SIDE OF BUILDING IN SHARED LOT LOWER LOT: 22 SPACES TOTAL SPACES EXISTING: 32 SPACES NEW WORK INCLUDES RESURFACE AND RESTRIPE OF LOWER LOT UPPER LOT: 10 SPACES ALONG WEST SIDE OF BUILDING IN SHARED LOT LOWER LOT: 16 SPACES n ET LOSS TOTAL SPACES PROVIDED IS 26 PLUS 02 ADDITIONAL SHARED SPACE=28®�� S\'( TOTAL SPACES � Gee P �9Q�y� oPee to RECEIVED AUG 0 8 2019 �\ 615 W. Alder Street a' TWO WAY TRAFFIC ARROWS *' 4' G• AR A4EASURED PRojTHEST BUILDING \o I o ti o • PARKING COUNT: I J EXISTING:22 SPACES REMOVED: 10 SPACES EXISTING TO REMAIN: 12 SPACES O — 1 --- / / TWO WAY TRAFFIC ARROWS i l' ICI , • � � , co / co i i � I , / O COMPACT / < l / � it COMPACT, i - COMPACT i' TWO WAY TRAFFIC ARROWS / Sf • i U iAL: 28 SPACES REQUIRED • SITE IS LAID OUT WITH SHARED PARKING IN UPPER LOT FOR ENTIRE DEVELOPMENT. EXISTING PARKING COUNT FOR THE BUILDING WITH UPPER AND LOWER LOT SPACES: UPPER LOT: 10 SPACES ALONG WEST SIDE OF BUILDING IN SHARED LOT LOWER LOT: 22 SPACES TOTAL SPACES EXISTING: 32 SPACES NEW WORK INCLUDES RESURFACE AND RESTRIPE OF LOWER LOT UPPER LOT: 10 SPACES ALONG WEST SIDE OF BUILDING IN SHARED LOT LOWER LOT: 16 SPACES(NET LOSS OF 6 SPACES) TOTAL SPACES PROVIDED IS 26 PLUS 2 ADDITIONAL SHARED SPACE=28 TOTAL SPACES RECEIVED � I / J _ AUG 0 8 2019 615 W. Alder Street ' I TWO WAY TRAFFIC ARROWS - �o � I �J I PARKING COUNT: I ' EXISTING:22 SPACES / { I I REMOVED: 10 SPACES EXISTING TO REMAIN: 12 SPACES 2 TWO WAY TRAFFIC ARROWS - i I yo / co r� / / O COMPACT I COMP ACC/ 6D. I � TWO WAY TRAFFIC ARROWS- Sf